A door quotation rarely fails because of the panel design itself. It fails because the opening, the wall build-up and the hardware set were never pinned down together. If you are briefing a factory on Classic Panel Hinged Doors for a villa or apartment package, the information below is what lets an estimator return a real price rather than a placeholder.

Start With the Opening, Not the Door

Made-to-measure doors are built to the opening, so the opening has to be final before production starts. Send structural opening width and height at three points each (top, middle, bottom for width; left, middle, right for height), and state whether the finish floor level is fixed or still to be set. A 10 mm difference between two readings usually means the wall needs packing or the lining needs adjusting, and both change the price.

  • Structural opening size versus the finished, lined opening size
  • Finish floor level, including tile or screed build-up
  • Head height under beam, bulkhead or ceiling line
  • Wall thickness and wall build-up (masonry, stud, steel frame)
  • Obstructions: skirting, architrave, switches, radiators, reveals

Say plainly whether the site team will supply the lining and architrave or whether you want the door supplied as a complete set. Frame-only and full-set pricing are not comparable.

Specify the Panel Style You Actually Want

"Classic panel" covers a wide range of looks, and moulding depth, rail-and-stile proportion and glazing all affect tooling and cost. For each door position, confirm:

  • Number and layout of panels, and whether any are glazed
  • Panel profile: flat, recessed, raised or moulded
  • Rail and stile proportions, especially where doors sit side by side
  • Core and substrate choice, and what the door has to do in service (privacy, acoustic separation, a wet room such as a bathroom or laundry)
  • Finish system: paint grade, laminate, wood veneer or lacquer

Send a reference image with the door shown square on, not in a styled photograph at an angle. A straight-on shot lets the workshop read the panel layout; a lifestyle photo invites interpretation.

Give Hang and Hardware Details

Hardware is where quotations drift, because hinges, closers and locks are priced per set and every change multiplies across the schedule. State for each leaf:

  • Handing: left or right, and which face the door opens towards
  • Swing direction and any restriction from furniture, a wall return or a corridor width
  • Hinge type, finish and quantity, including whether concealed hinges are required
  • Lock mechanism: privacy, passage, keyed, or escape-only
  • Door closers, door stops, threshold details and any access requirement
  • Leaf weight limits where a tall or wide leaf is proposed

If the design calls for a concealed frame or a door that sits flush with the wall, flag it at enquiry stage. That detail changes both the frame section and the site sequence, so it should not appear for the first time in a shop drawing review.

Send One Door Schedule, Not Several Emails

A single schedule keeps every line comparable and makes substitutions obvious. At minimum, each row should carry:

ColumnWhat to record
Mark / roomDoor mark keyed to the room schedule, so the site team can match it
Opening sizeWidth x height x wall thickness, with finish level noted
TypeSingle or double leaf, panel layout, glazed or solid
FinishColour code, sheen, grain direction or sample reference
Hardware setHinges, lock, handles, closer, threshold
Quantity and delivery sequenceTotal quantity plus the order doors arrive by phase
DestinationProject address, receiving arrangements, container or pallet preference

Where a project also needs Classic Pocket Doors or folding openings, list them in the same schedule with pocket depth and wall cavity details. Mixing door types across separate enquiries is how pockets end up framed to the wrong depth.

Decide Early Whether the Doors Are Standard or Custom

Standard sizing keeps the schedule simple. Where the design needs non-standard heights, a different panel layout or a finish matched to joinery elsewhere in the build, custom work is the practical route. A supplier offering Custom & OEM Service can handle bespoke finishes and textures, prototyping and flexible order quantities, which matters when door finishes have to match wardrobes and cabinetry in the same villa package.

For custom lines, expect the workshop to ask for a drawing or 3D model, a physical or coded finish sample, and written confirmation of dimensions before tooling. Approving a prototype before the full run is slower on paper and faster on site.

Cover Packaging, Freight and Site Handling

Doors arrive damaged when packaging and unloading are decided after production. Tell the supplier the destination, whether the goods go to a port or straight to site, and who handles the last leg. Ask for the packing method, container loading plan and marking system so each crate can be matched to its door mark on arrival.

If freight is arranged for you, request the packing list, commercial invoice and shipping documents early enough to clear customs without holding the container. Confirm storage conditions on site too: doors stored flat in a dry space acclimatise far better than doors leaning against an external wall.

What a Complete Enquiry Looks Like

Opening sizes at three points each, wall build-up and finish level; panel layout with a square-on reference image; handing, swing and hardware per leaf; one door schedule with marks, quantities and delivery sequence; the destination and receiving arrangements; and written confirmation before production starts.

That is enough for an estimator to price doors consistently across every opening, and it protects you when comparing two quotations. Anything missing tends to surface as a variation after order confirmation.

Questions Buyers Ask

Who measures the openings?

Either party can, as long as someone signs off the final dimensions after plaster and finish floor levels are complete. Where you measure, send photographs of each opening with a tape in view.

Can mixed door types go in one order?

Yes. Hinged, pocket and folding doors can be scheduled together, provided each type carries the details it needs — pocket depth and cavity build for sliding leaves, track and panel count for folding runs.

When should finish samples be approved?

Before production, not at delivery. Paint grade versus veneer versus laminate changes both the price and the site protection required, so lock it down with a signed sample or colour code.

Putting It Together

Doors sit at the awkward junction between structure, finishes and hardware, which is why an enquiry that only gives sizes gets a weak price. Send the opening data, the panel specification, the hardware schedule and the delivery plan in one package, and the quotation you receive can be compared line for line with any other.

SANTERSON supplies Classic Panel Hinged Doors alongside wardrobes, cabinetry and interior fit-out products for villa, hospitality and office projects. Send your door schedule to start a quotation.