A parquet floor rarely fails because the timber is wrong. It fails because the brief was thin. Send a manufacturer a line that says "European oak, herringbone, light tone" and you will get a quotation for something close but not what your drawings show - different plank size, different edge profile, a finish you never specified. The article below sets out exactly what to put in front of a flooring factory before a price is requested, using the European oak parquet engineered range as the working example.
Start With the Assembly You Actually Need
Engineered hardwood is a layered product: a solid European oak wearing layer bonded to a dimensional stable multilayer core. That construction is what makes parquet formats practical in real buildings, because the cross-layered core resists the movement that a single thick lamella would show with seasonal humidity change. In the products we manufacture, the oak wearing layer on the parquet and herringbone boards is 3 mm solid oak, which is enough to carry the grain, allow brushing or distressing, and take a factory finish.
State in your brief what you expect the assembly to be, then ask the factory to confirm it in writing against your project. A short paragraph is enough:
- Wearing layer thickness and species - for example 3 mm European oak, sawn or sliced cut.
- Core construction - multilayer plywood-type core, and the grade of bonding used.
- Total board thickness and the subfloor condition it will be laid over.
- Whether the floor is intended to sit over underfloor heating, which these engineered boards are compatible with.
Ask for a cut-away sample. A 100 mm offcut showing the layer stack settles arguments about construction faster than any specification sheet.
Name the Pattern, Not Just the Look
"Parquet" covers several different products with different installation labour and different waste factors. Your enquiry should use one of these terms precisely:
| Format | What the factory needs to know |
|---|---|
| Herringbone | Individual strips laid at right angles. Confirm strip width and length, and whether ends are square or micro-bevelled. |
| Chevron | Pre-cut angled planks that meet on a clean line. Requires the angle to be stated, because it is machined, not set out on site. |
| Block parquet / finger block | Small blocks in a field pattern. Confirm block size and border treatment. |
| Board-format parquet effect | Longer planks with inlaid pattern strips, laid like ordinary boards. Faster on site, different look up close. |
Send a plan view of the room with the laying direction marked and the border or skirting detail noted. A factory that knows the pattern can tell you the true order quantity rather than an area plus a guess.
Specify Colour and Surface With Physical References
Tone is where custom orders go wrong most often, because written colour names mean different things to different producers. Our own catalogue shows how wide the European oak palette runs: a light tone European oak parquet with a bright, clean grain for minimalist interiors; a warm natural-toned parquet for renovation work; and a deep brown parquet for rooms that need weight. Those are three different products, not one product with a colour option.
For a custom order, give the manufacturer:
- A physical reference board or an existing floor you are matching, posted to the factory rather than photographed.
- The finish system - brushed, wire-brushed, saw-cut, hand-scraped or smooth; matt lacquer, satin, oil or hard-wax oil.
- Whether knots and mineral streaks are wanted or excluded. European oak character grades look right in some schemes and wrong in others.
- Lighting conditions on site: north-facing glazing, warm LED, or a hotel lobby with downlights will all shift how the same board reads.
Then require a pre-production sample of the actual batch, signed and dated by both sides before volume runs start. That signed board becomes the acceptance standard for delivery.
Give the Numbers That Determine Price and Lead Time
A quotation cannot be built from square metres alone. Include in the same enquiry:
- Total area by room, plus a separate allowance for cut waste on patterned floors, which is higher than straight-lay plank.
- Plank and strip dimensions, border pieces, and any stair nosings or transition details you need machined.
- Order quantity per delivery, since a phased hotel or apartment handover needs staged production rather than one container.
- Destination port or site address, packaging standard, and whether the boards ship with oil or fully cured factory lacquer.
Because we work as a custom furniture and interior products manufacturer, parquet specification travels in the same enquiry as cabinetry, wall panelling, doors and joinery. That is worth exploiting: one production schedule covering flooring and millwork keeps timber tone, veneer matching and delivery windows under a single control document instead of three suppliers arguing about who caused the mismatch.
Write the Acceptance Criteria Before Production
Put the inspection terms in the purchase order, not in a dispute afterwards. Practical criteria are short:
- Moisture content at packing, measured and recorded per batch.
- Tolerance on thickness and width across the pallet, checked against the approved sample.
- Colour variation range, defined by the signed board plus a stated acceptable band.
- Edge and end squareness, and the number of boards per carton with their grading face marked.
- Packaging for ocean freight, including moisture barrier and pallet strapping for patterned boards that chip easily at the mitred ends.
What the Brief Looks Like When It Is Complete
A brief that produces an accurate quotation fits on one page: format and drawing, wearing layer and core, total thickness, board dimensions, finish system with a signed reference board, grade of character, area by room with waste allowance, phasing plan, destination, and the acceptance criteria above. Add photographs of the site and the subfloor condition, and a manufacturer can price it without a round of clarifying questions.
Browse the engineered wood flooring range first to see how formats and tones differ, then send your drawings. Our team quotes against your documents and returns a production schedule you can check line by line.
Send us your floor schedule
Email your drawings, room list and target finish to santerson@qq.com, or reach PHILLIP on WhatsApp +86-13928214007. Include the pattern, board size and tone reference from your scheme, and we will quote the assembly you described - with samples before production starts.