A U-shaped walk-in wardrobe looks straightforward on a 3D render: three runs of cabinetry, hanging rails down both legs and a mirror at the centre. It is only once the units arrive on site that teams discover whether the drawings matched the room. Because these wardrobes are made-to-measure built-ins, the decisions taken before approval are the ones that decide the outcome: the survey method, the clearance between opposing runs, which wall carries the corner hardware, and how the joinery meets flooring, skirting and ceiling on all six faces.
SANTERSON manufactures U Shaped Walk in Wardrobes as part of a walk-in wardrobe collection in which sizing, materials, finishes and layout are specified per project rather than ordered off a fixed module list. That flexibility is the reason the sign-off checklist below matters: when nothing is standard, everything has to be confirmed in writing before production starts.
1. Confirm how the space was measured, not just the numbers on the drawing
Three walls meeting at right angles is the assumption behind most U-shaped layouts. In existing villas and renovation apartments, walls are rarely square and floors are rarely level, and a 10 mm deviation at one corner propagates through all three runs once the units are butted together.
Before approval, ask the project team to state:
- whether dimensions come from a site survey of the completed shell (after flooring, plasterboard and ceiling heights are fixed) or from architectural drawings of the bare structure;
- the finished floor level and finished ceiling height at each of the three runs, since the top closure panel differs where slab levels vary;
- the position of every door opening, window reveal, switch plate, power outlet, sprinkler head and return air grille that falls inside or beside the wardrobe footprint.
Where a design intent has been produced by an interior designer, ask us to check it against our interior design and project coordination service, which covers space layout planning, product specification and on-site guidance during the fit-out.
2. Confirm the walkway clearance between the two facing runs
The defining feature of a U-shaped plan is that two runs face each other across an aisle. Two dimensions have to be separated before approval, because they are routinely confused:
| Dimension | What it governs | Who signs it off |
|---|---|---|
| Aisle clear width (finished wall-to-wall minus carcass depth) | Whether a person can stand, dress and turn in the space, and whether doors or drawers can open without fouling the opposite run | Design team / architect, against the client's brief |
| Carcass depth per run | Hanging clearance and door swing; set by our made-to-measure sizing once the survey is fixed | Manufacturer, confirmed on shop drawings |
Do not let a single number travel through the tender as "wardrobe depth". Request the aisle clear width and the carcass depth separately for each of the three runs, and have both shown on the same drawing with the door opening line drawn in.
3. Confirm which corner is structural and how the two corners are resolved
A U shape has two internal corners, and each one can be built in more than one way: a shared carcass with a single vertical standard, independent carcases with a scribe filler, or a returned end panel that reads as a finished face. The choice changes the visible line in the room, the shelf spans across the corner, and whether the base plinth runs continuously through both corners.
Ask for a corner detail on the shop drawing for both corners before approval, together with the scribe allowance where walls are out of plumb. This is also where alternatives should be tested: if the room is narrower than the layout assumed, an L Shaped Walk in Wardrobe frees one wall for circulation, and an Island Walk in Wardrobe moves storage to the centre of the aisle instead of the perimeter.
4. Confirm the internal fit-out against how the client actually stores clothing
Renderings tend to show generous hanging above shelves, which suits nobody's real wardrobe. The internal layout is specified per project, so it should be approved item by item:
- double hanging and single hanging runs, and which leg of the U each sits in;
- drawer stacks versus open shelving, including pull-out hampers or tray units for folded items;
- shelf spacing where long garments, suitcases or seasonal storage are planned;
- lighting: integrated cabinet lighting and mirrored surfaces change both the electrical first-fix and the mirror supplier's cut sizes;
- whether any bay is left open. An Open Walk in Wardrobe treatment on one run keeps a daily-use zone accessible without doors, while closed runs hide bulk storage.
5. Confirm the finish schedule and the sample that represents it
Material and finish options are selected per project, so the approval pack should name each surface rather than describe it: carcass board, door substrate, decorative face (acrylic, lacquer, melamine or wood veneer), edge treatment, handle or handleless detail, and glass type where glazed doors or end panels are used. Veneer and two-tone schemes in particular need a physical sample under the room's own lighting before sign-off, because the same board reads differently against warm villa lighting and a bright showroom.
Where finishes must match cabinetry elsewhere in the same dwelling, send the kitchen or vanity specification to us at the same time. Our custom and OEM service covers bespoke material, finish and texture selection alongside design and prototyping, so wardrobes and built-ins can be specified as one package rather than reconciled later.
6. Confirm interfaces with flooring, skirting, ceiling and services
Built-in wardrobes fail at their edges far more often than at their carcasses. Before approval the drawing should show:
- whether flooring runs under the units or butts against them, and who is responsible for each sequence;
- skirting removal or scribing behind every run;
- the top closure to the ceiling line, including any cornice or shadow gap;
- power and data points that must remain accessible after installation, and where in-cabinet lighting takes its supply from;
- clearance for doors that swing out toward the aisle, bathroom doorway or a neighbouring piece of loose furniture.
7. Confirm the delivery, storage and installation sequence
Made-to-measure joinery shipped internationally needs the same project management as any other fit-out package. Confirm the container and packaging schedule, the on-site storage location (built-in panels must stay flat, dry and off the floor until installation), and which trade installs the units. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking, while installation and after-sales support covers on-site installation and inspection of the completed work.
Agree in writing who carries out the site survey that releases production drawings, which revision of the drawing is the approved one, and what happens if the shell changes after approval. A single late change to floor levels or a moved doorway can invalidate every dimension on the order.
Approve the drawings only when all seven items are answered in writing. That single step is what separates a U-shaped walk-in wardrobe that fits on the first visit from one that needs panels re-made and a programme extended. If you are specifying built-in wardrobes for a villa or hospitality project, send us the layout and finish intent and we will return made-to-measure proposals against your survey.