A wall-hung basin looks simple on a drawing. It is one rectangle of ceramic fixed to a wall. Yet when the order crosses an ocean, that single item can hold up a whole bathroom handover: the wrong rough-in, a cracked corner in transit, or a missing bracket stops tiling, joinery and final inspection at the same time. This guide walks through how we plan international delivery for a project order of the Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink — from the specification sheet to the loading plan and the site-side checklist.
Start With the Fixture Sheet, Not the Container
Model 1004B is a wall-mounted vitreous ceramic basin with a glossy glaze and a trapezoid outline. The published page size for this model is 510 × 420 × 380 mm, and the basin fixes to the wall through its back panel, with a tap hole prepared for a single faucet. Those four details decide everything downstream: which wall can carry it, where the water supply and waste land, how many basins fit on a pallet, and how much protection each piece needs.
Before any quantity is confirmed, we ask project buyers to close three questions in writing:
- What is the wall build-up? A wall-hung basin loads through its fixing points into the substrate. Stud and lining, masonry, or a steel frame each need a different fixing detail, and the cavity depth changes the bracket set.
- Where do supply and waste land? Send the plumbing layout with finished-floor levels and finished-wall levels marked. A 20 mm error on paper becomes a re-set basin on site.
- How many rooms repeat, and how many differ? Guest-room bathrooms are usually identical; villas and public washrooms rarely are. Grouping the order by room type keeps the pallet plan and the installation sequence clean.
Sizes, trap arrangement and fixing details on this product should always be re-checked against the current technical data sheet for your order batch before production starts. The figures published on the product page are a starting point, not an installation instruction.
Decide the Suite Scope Early
Ceramics look cheapest and most consistent when they are ordered as a set rather than item by item. The 1004 series lets you do that: the same shape language runs through the Washdown One Piece Toilet 1004A and the Wall Hung Bidet 1004F, and Freestanding Ceramic Pedestal Basin 1004S covers rooms where a floor-standing layout is preferred. Ordering the suite together means one glaze batch, one production window, one container, and one set of spares.
A toilet choice also affects the plumbing drawing. The 1004A one-piece WC is offered with two rough-in arrangements — a wall drain and a floor drain — and those are not interchangeable after the pipework is in. Confirm which one your site uses while the drawings are still open, not when the ceramics arrive.
Choose the Delivery Terms You Can Actually Manage
As a China-based furniture and building materials supplier, we handle project freight by sea, air and rail, together with the paperwork that goes with it: commercial invoice, packing list, certificate of origin and the import documents your broker asks for. For a ceramics order the practical decision is not "sea or air" but who owns each leg.
| Arrangement | Who handles what | Best fit |
|---|---|---|
| Door-to-door | Factory packing and loading, export clearance, main carriage, import clearance support, delivery to site or to your store. | Builders and developers who want one coordination point and do not hold their own import account. |
| Port-to-port with your forwarder | We deliver to the load port and provide shipping documents; your agent manages carriage, clearance and inland delivery. | Contractors with a preferred forwarder and in-house customs capability. |
| Consolidated project container | Ceramics are loaded alongside cabinetry, lighting, flooring or furniture from the same project phase in one container. | Full fit-outs where several trades finish in the same window. |
Import duty, taxes and local entry requirements sit with the buyer's broker and change by destination and product classification. We supply the documents and the declared descriptions; your clearing agent confirms the tariff line and any permits before shipment. That division keeps the order moving when a customs query appears.
Pack Ceramics for the Handling They Will Really Meet
Breakage in transit almost never comes from the ocean crossing. It comes from the four or five transfers between the factory floor and the bathroom wall: palletising, container stuffing, unloading at the destination port, warehousing, and the last trip to site on a small truck. Our packing plan for a basin order follows that route:
- Individual protection. Each basin is corner-guarded and separated from its neighbour so glaze never meets glaze or steel.
- Fixed pallet pattern. Basins are stacked on a level pallet with an interleaved cushion layer, strapped, and edge-protected. The stack height is capped so the bottom row carries a predictable load.
- Marked by room type. Cartons carry the model code and the room or floor group they belong to, so site teams unload in installation order instead of sorting everything in a yard.
- Spares in the same container. For multi-unit projects we discuss a spare quantity with you up front. One replacement basin shipped later costs far more than one extra basin in the original container.
- Loading plan shared before stuffing. You receive the pallet count, gross weight and volume before the container is loaded, so your receiving team can arrange the right forklift and storage space.
If ceramics share a container with cabinetry or joinery, heavy flat items go on the floor and fragile items sit above them with a solid separator. We send you that loading sequence rather than leaving it to the stuffing crew at the port.
Set the Schedule Around the Wet Trades
Ceramics are late-stage goods, and that is exactly why they go wrong: they are ordered late, then rushed. A workable sequence looks like this:
- Specification locked before tiling starts. Basin size and position determine the wall framing, the concealed carrier, the tap hole position and the mirror or cabinet above.
- Production confirmed against the signed sheet. Quantity, glaze, faucet hole layout and the rough-in arrangement are frozen at this point.
- Freight booked with a buffer for clearance. Book the sailing against your installation date and keep time in reserve for customs inspection and inland delivery.
- Inspection on arrival, before storage. Open a representative share of cartons at the point of unloading. Damage found there can still be photographed, claimed and replaced; damage found after the goods are buried in a store is much harder to resolve.
A Site Checklist Before the Basin Is Unpacked
- Wall substrate, bracket set and concealed carrier installed and signed off, with the finished wall face marked.
- Water supply and waste positions measured against the fixture sheet, not the drawing scale.
- Tiling and waterproofing complete around the fixing zone; no wet trades scheduled after installation.
- Faucet, wastes and connectors on site and matched to the tap hole layout of the basin.
- Carton labels checked against the packing list and room schedule before installers move to the next bathroom.
Once those five lines are green, a wall-hung basin is a short job. When one of them is missing, the basin goes back in the carton and the whole bathroom waits.
How Our Project Team Supports This Order
SANTERSON has been manufacturing furniture and building materials since 2008 and supplies project customers across hospitality, villa and office work. For an order like this one, the same team handles product specification and custom/OEM requirements, production coordination, packing and container loading, freight and documentation under logistics and door-to-door delivery, and then installation and after-sales support on site. Because bathroom ceramics sit in the same catalogue as vanities, wall panels, flooring, lighting and cabinetry, a fit-out can be consolidated into fewer shipments with one coordination point — see our turnkey project solutions for how that is organised.
Planning a bathroom package for a hotel, villa or apartment project? Send us the room schedule, the plumbing layout and your target installation date, and we will return a fixture specification, packing plan and delivery option for the 1004 series — including the Wall Hung Ceramic Basin 1004B — matched to your site conditions.