A wardrobe order goes wrong in two directions: the doors arrive in the wrong size, or the sizes are right but the surrounding products do not match. Both come from the same place — quantities and product specifications were decided one item at a time instead of as a set. This guide walks through how buyers, builders and project teams count, specify and coordinate glass sliding door wardrobes so the order arrives complete.
Start With Openings, Not Wardrobe Counts
The most common quantity error is counting wardrobes rather than openings. A single run of 3.6 m along a bedroom wall can be built as two wardrobe units with four door panels, or three units with six panels — the unit count changes, and so does every downstream number: track length, panel weight, packing volume and container mix.
Before any enquiry goes out, record for each room:
- Clear width, height and depth of the recess or the wall run, measured at floor, middle and ceiling level. Older villas and renovated apartments rarely have walls that are square.
- Floor finish build-up — whether the finished floor is already laid, and how thick it will be. Sliding doors hang from a track; a 20 mm difference in final floor height changes the door height.
- Obstructions — skirting boards, architraves, light switches, air-conditioning outlets, downlights and ceiling cornices that the carcass or the track has to clear.
- Access route — lift dimensions, stair turns and door widths on site. A full-height panel that will not pass the lift is a delivery problem, not a manufacturing one.
Because these wardrobes are made to measure rather than stocked in fixed sizes, the opening measurement is the specification. Send the same dimension sheet with every enquiry so two suppliers can be compared on the same basis.
Count Panels, Tracks and Carcasses Separately
Once the openings are fixed, split the bill of quantities into three lines instead of one:
| Line item | What to count | Where errors appear |
|---|---|---|
| Carcass / body units | Number of wardrobe bodies, each with its width, height and depth | Units split unevenly across a long run, leaving one awkward narrow bay |
| Door panels | Total panel count per opening, plus the overlap each panel needs to run past its neighbour | Panels ordered too narrow, so the opening is not fully covered when the doors are pushed aside |
| Track, runners and hardware | Top and bottom track length per opening, hangers, buffers, guides, wall fixings | Hardware listed as "supplied by others" and then ordered twice, or not at all |
For a two-panel opening you need one track length equal to the opening plus the second panel's travel; for three or four panels the travel grows with each added panel. Write the panel count and the run length in the same row of your schedule so the supplier can confirm both.
Then repeat the count by room type. In a villa or apartment project, quantities are usually grouped as master bedroom, second bedroom, kids' room, guest room and hallway storage. Grouping by room keeps the schedule readable for the site team and makes it obvious when one floor has been left out of the order.
Decide the Front Finish Before You Lock Quantities
The door face is the part everyone sees, and it is also the part that ties into other products in the same room. Within the sliding-door range, glass fronts and solid fronts behave differently on site:
- Glass sliding door wardrobes — a glazed front in a clear, bronze or frosted face keeps a narrow bedroom feeling open and lets display shelving read through the door. Glazed panels need the carcass square and the track level, because glass does not flex to hide a badly set-out opening.
- Mirror sliding door wardrobes — mirrored fronts do the work of a dressing-room mirror and add reflected light where there is no window. Plan the mirror face against the position of beds and lamps before ordering, so reflections fall where they are wanted.
- Wooden sliding door wardrobes — a timber-look or painted timber front carries the colour scheme and pairs with custom built-in kitchen cabinets in open-plan layouts, where the wardrobe wall is visible from the living area.
Two practical rules follow. First, do not mix front types across one elevation unless the frames and handles are specified to match; mixed fronts on a single run look like two separate purchases. Second, keep one finish decision per floor for bedrooms and reuse it in the hallway and guest rooms — that is what turns a list of wardrobes into a coordinated interior.
Coordinate the Wardrobe With the Rest of the Fit-Out
Wardrobes are rarely ordered alone on a villa or hospitality project, and coordination failures usually happen at the junctions between trades. Check these interfaces in writing before production starts:
- Floors — engineered wood flooring and other building materials set the finished level the track sits on. Confirm which side the flooring stops at, and who trims the edge.
- Ceilings and walls — ceiling panels, cornices and wall panelling must stop clear of the track line. Decide whether the carcass is scribed to the wall or set back with a shadow gap.
- Lighting — interior wardrobe lighting needs cable runs inside the carcass before it closes; surface downlights need to sit outside the door swing path.
- Bathroom and laundry side — where a wardrobe shares a wall with a wet area, confirm the wall build-up and finishes on both faces so the carcass depth still works.
- Doors and skirting — room doors and skirting profiles have to close without fouling the outermost wardrobe panel.
A single coordination sheet listing these interfaces, with a responsible party named against each line, prevents most on-site surprises. Where one supplier provides wardrobes, cabinetry, flooring and finishes together, that sheet becomes one document instead of five — which is the practical argument for one-stop furniture and building materials supply on multi-room projects.
Order in Batches That Match the Site Programme
Quantities should follow construction sequence, not the purchase order date. A workable pattern for a multi-unit or villa project:
- Batch 1 — long-lead items. Made-to-measure carcasses and glazed or mirrored panels go into production first, because they cannot be substituted from stock if something is missed.
- Batch 2 — repeat rooms. Identical second bedrooms and guest rooms can be released together once one prototype room has been signed off on site. Confirming one room before repeating it catches track heights, door overlap and handle positions while the fix is still cheap.
- Batch 3 — hardware, spares and touch-up items. Spare hangers, buffers and guide pieces travel with the main shipment rather than arriving later as a separate freight cost. Order spares against the panel count, not the unit count.
For each batch, state quantities in three units — pieces per item type, square metres of door face, and total package volume. Package volume is the number that decides container mix and delivery cost, and it is the figure most schedules leave out.
What to Send With the Enquiry
A complete enquiry gets a quotable answer instead of a follow-up question. Attach:
- A room-by-room schedule: opening width, height, depth, panel count and track run for every wardrobe.
- Selected front type and finish per room, with the reference from the product range quoted in writing.
- Carcass interior layout per room — hanging rails, shelves, drawers, shoe storage — since internal fittings change both price and lead time.
- Site condition notes: finished floor levels, ceiling heights, access restrictions and delivery address.
- Batching and delivery sequence tied to the site programme.
Where dimensions are still moving, ask for a made-to-measure quotation against the current drawings and hold production until the final site survey is signed. Re-measuring after floors and ceilings are complete costs days; re-manufacturing panels costs weeks.
Frequently Asked Questions
How many door panels should one opening have?
Enough that the opening is fully covered when the doors are stacked to one side, with each panel overlapping its neighbour. Two panels suit most bedroom recesses up to roughly a wide double opening; three or four panels suit longer runs and full-height storage walls. Give the supplier the opening width and the panel count together.
Can glass fronts be used in bedrooms with children?
Glazed fronts are specified widely in residential work, but the face type should be chosen for the room. Frosted and framed glass faces suit high-use rooms; a clear glazed front suits display shelving in a master suite or dressing area. Mirror and timber-look fronts are the usual alternatives where a solid face is preferred.
Should wardrobes be ordered with the flooring?
Yes, at least for the level information. Fix the finished floor level before wardrobe heights are locked, then order flooring and wardrobes against the same dimension sheet. This is where coordinating building materials and built-in furniture in one programme saves rework.
What about corner rooms?
A sliding door corner wardrobe needs the diagonal dimension and both wall runs measured separately, plus a clear note on which side the doors travel. Corner units are usually counted as their own line item rather than folded into the straight-run total.
Send us your wardrobe schedule
SANTERSON manufactures made-to-measure built-in furniture and building materials for villa, hotel and apartment projects, with design coordination, production, door-to-door delivery and installation support. Send a room-by-room quantity schedule — openings, panel counts, front finishes and delivery sequence — and our team will return a specification-checked quotation.