A swim spa the size of Outdoor Swim Spa WS-S12 is not a piece of furniture you can drop on a patio. At 11740 mm long, it arrives as an oversized shipment that has to clear customs, cross a site, sit on engineered ground, and draw power from a circuit that was designed for it weeks earlier. When any one of those steps is left to the week the truck shows up, the shell sits on the driveway while the builder chases trades. The planning sequence below is the one our project team works to on villa and hospitality sites, so delivery and installation advance together instead of colliding.
What WS-S12 Actually Requires On Site
Before you book a crane, read the catalog record for the model line as it stands today:
| Catalog item (WS-S12) | What it means for site planning |
|---|---|
| Dimensions 11740 × 2200 × 1470 mm | Oversized freight, a wide access route, and a slab or plinth with working clearance around all four sides |
| Total power 7.65 kW | A dedicated supply sized by a licensed electrician for the equipment you select, not for the catalog figure alone |
| Water pump 2 pcs, filter pump 1 pc, jet total 73 pcs | Circuit separation, protection devices and cable routes are set out in the wiring schedule |
| Control system 1 set | A dry, accessible location for the controller, with room to open it for service |
| Features shown: water jets, LED lighting (1 plus 50 small LEDs), ozone | Low-voltage routing and a maintenance access point; ozone equipment needs ventilation |
| Optional accessories: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation, steps | Each option changes the electrical load and the plant space around the shell, so it must be fixed before the slab is poured |
The catalog also lists no swim training system for WS-S12. If a counter-current unit is part of your brief, the -T variant of the same 11740 × 2200 × 1470 mm shell carries it, and the site works are unchanged. Either way, treat the equipment list on the quotation as the version you build to, because options move both the load and the footprint of the plant area.
Delivery And Ground Works Run On Two Separate Tracks
The factory controls one track; your civil contractor controls the other. They only meet at the installation date, so both need a fixed start.
- Track A — production and freight. Once the configuration is signed off, our furniture logistics and door-to-door delivery team arranges sea, air or rail forwarding, commercial invoice, packing list and certificate of origin, container loading, and shipment tracking to the delivery address.
- Track B — site preparation. Ground bearing and drainage are local decisions. Slab thickness, reinforcement, waterproofing, a drain or overflow route, and the electrical supply are set by your structural engineer and electrician against their own codes and permits.
We send you the shipping marks, container list and packing details so your site team can plan the unloading gear; you send us the access drawings and the installation date. Neither side waits on the other for more than one exchange.
A Working Sequence You Can Put In A Programme
- 1. Fix the configuration first. Heat pump, sand filtration, UV sterilisation, insulation and steps each add plant space and load. Locking them in at quotation stage is what lets the engineer size the base and the electrician size the supply in one pass.
- 2. Issue a dimensioned setting-out drawing. The 11740 × 2200 mm plan area, the depth of 1470 mm, and the position of the control system and plant access become a drawing your builder can set out, so the shell lands where the survey pegs already are.
- 3. Confirm the access route before the container is booked. Measure gate width, turning radius, overhead cables and the distance from the truck to the final position. This decides whether a crane, a forklift or a manual carry crew is needed, and it is far cheaper to know now than on the day.
- 4. Let civil works finish and cure before the ship date is confirmed. Backfill settlement and slab curing happen on their own timetable. Confirm the delivery window only when the base has passed inspection.
- 5. Have the electrical rough-in complete at handover. The supply, protection device and cable route should be terminated and tested before the shell arrives, so connection is a same-day task rather than a second mobilisation.
- 6. Book installation once the site is ready. Our furniture installation and after-sales support covers on-site installation, inspection with a snag list, spare parts and ongoing maintenance; the scope for your site is written into the project file rather than agreed at the gate.
- 7. Commission with the configuration in hand. Jet pumps, filter pump, control system, lighting circuits and ozone are started up against the approved equipment list, and filling is timed so water treatment can begin on schedule.
The Five Handover Items That Decide The Critical Path
- Base: level, drained, and signed off by your engineer before delivery is booked.
- Power: dedicated supply and protection installed and tested, sized for the selected options.
- Access: unloading gear confirmed against measured site access.
- Water and drainage: fill point and overflow route in place before commissioning.
- Documentation: shipping marks, packing list and the approved equipment schedule on site with the installation crew.
Where The Swim Spa Sits In A Larger Package
On most villa and resort sites the swim spa is one line in a wider procurement list that also covers poolside loungers, outdoor dining sets, pergolas and interior joinery. Ordering it through a one-stop furniture and building materials supplier means one production schedule, one consolidated shipment plan and one installation visit for the outdoor zone, which removes most of the handover friction between trades. The same model range is listed under swimming pools and swim spas, alongside configurable shapes for bespoke hydrotherapy pools.