An island walk-in wardrobe is one of the most specification-heavy items in a bedroom fit-out. It combines cabinetry, worktop material, internal storage planning and sometimes lighting, so two quotes for "the same" room can differ by more than they look on paper. Before you sign a purchase order, here is what a serious quotation should state line by line.
1. The Layout Drawing Behind the Price
A number without a drawing is not a quote. Ask for a dimensioned plan and elevation of the room showing where the island sits, the walk-in aisles around it, and the door or entry side. Our Island Walk in Wardrobes are made to measure, so the layout is drawn around the actual space rather than chosen from a fixed catalogue size.
- Aisle width between the island and the perimeter run, with the number used by the supplier, not an assumed figure
- Island footprint and overall height, including any drawer bank or raised display section
- Clearance for drawers, doors and any pull-out tray to open fully without hitting a wall or bed
- Relation to skirting, architrave, sockets, lights and air-conditioning grilles
2. Carcase and Door Material, Written Out
Watch for a quote that says only "wood" or "board". A usable quotation names the substrate, the surface treatment and the edge treatment separately. Typical lines to look for are the board type for the carcase, the door panel construction, and whether edges are ABS, PVC or lacquered. Edge banding is where cheap wardrobes fail first, so it belongs in writing.
If your design uses a handleless front, confirm that on the quote as well: a handleless detail changes the door rebate, the hardware and sometimes the price per linear metre. Finish names should include a reference code or sample number, because "matte grey" from one factory is not the same panel as another's.
3. The Island Top
The island top carries jewellery trays, watches and daily handling, so it wears differently from the rest of the room. Check whether the quoted top matches the carcase material or is a different one, and read what that second material actually is: engineered stone, sintered stone, laminate over board, or solid timber all price and behave differently. Ask for the top thickness, the edge profile and whether a cut-out for a tray or a soft-close mechanism is included.
4. Internal Configuration Per Metre
Two quotes at the same total length can hold very different storage. Compare the internal schedule item by item rather than the headline price:
| Item to check | What the quote should state |
|---|---|
| Hanging areas | Single or double hang, heights of each rail, length per section |
| Drawers | Count, depth, soft-close or runner type, felt-lined jewellery tray or not |
| Shelving | Number of shelves, adjustable or fixed, shelf depth |
| Accessories | Trouser pull, tie and belt rack, valet rod, shoe trays, baskets |
| Lighting | Integrated LED in the island or perimeter run, transformer and switch location |
Where a supplier prices per linear metre, ask which accessories are inside that rate and which are extras. Accessories quoted as "included" with no list are the most common place for a later variation.
5. What Is Excluded
Read the exclusions clause before the totals. Common gaps in a walk-in wardrobe quote are site measurement, floor protection, plinth or scribe work where floors are not level, electrical first fix for internal lighting, and removal of an existing fitted wardrobe. If your project covers more than the wardrobe, it is worth asking whether the same supplier can also price custom minimalist bedroom wardrobes and other built-in joinery in one package, so that finishes, board batches and site visits match across rooms.
6. Measurement, Approval and Production Sequence
Ask who measures, and when. Second-fix wardrobes should be measured after flooring, painting and skirting are complete, otherwise the openings will not match the drawing. The quote should show a shop-drawing approval step before production starts, with your written sign-off on it. Any change you make after that point is a variation, and a good supplier says so in advance instead of at delivery.
7. Packing, Freight and Delivery Terms
For an overseas order, the freight section decides how much of the quoted price you actually keep. Confirm the Incoterm, whether the price is for a knock-down flat-pack or assembled modules, the carton marking plan against the room drawing, and who handles customs clearance and last-mile delivery to site. For villa and apartment packages we handle door-to-door delivery as part of the turnkey project scope, which keeps cabinetry, joinery and other fixtures on one shipment plan rather than several.
8. Warranty, Spares and Site Support
Ask what the warranty covers in writing: panels, worktops, hinges, runners, lighting drivers. Each of those has a different life. Also ask whether spare doors, drawers or shelves can be reordered later to the same finish code, since a replacement made from a new batch may not match. If installation is on site, confirm who installs and whether snagging and correction are inside the quoted price.
Before you compare prices: put both quotes into the same columns — layout drawing reference, carcase board, door construction, edge treatment, top material and thickness, internal accessory schedule, exclusions, measurement stage, Incoterm, warranty terms. Two quotations that look far apart in price often converge once those columns are filled, and the real difference becomes visible in what one supplier left out.
Ordering an Island Walk-In Wardrobe for Your Project
Send us the room drawing or a site measurement, and we will return a quotation built on the columns above: made-to-measure sizing, material and finish options, and a layout tailored to the project rather than a standard module. For bedroom suites and full villa fit-outs, wardrobe joinery can be quoted together with other built-in furniture so that finishes and delivery stay coordinated.