A Two Tone Veneer Wardrobe is a made-to-measure built-in, so the quotation you receive is only as accurate as the information you supply. Below is the practical sequence we follow on residential and villa projects: what to prepare before you write to us, which details decide the price, how the quote is worked out, and what happens after you approve it.

Start From the Room, Not the Wardrobe

Two-tone veneer works best when the two tones are set against the rest of the room rather than chosen in isolation. Before you request a price, decide how the wardrobe should read in the space: veneer dominant with lighter panels to open up a narrow bedroom, or a lighter body with darker drawer fronts and door frames to anchor an open-plan suite. Send us photographs of the room from two or three angles, together with the wood veneer panels, flooring and door finishes already specified for the project. Matching a veneer tone to a floor you have already installed is straightforward when we can see it; it becomes expensive guesswork when we cannot.

What We Need From You Before Pricing

We quote from drawings and a room survey, not from a standard catalogue size. For each wardrobe run, send the following:

  • Overall width, height and depth at several points along the wall, plus floor level and plumb checks. Rooms are rarely square, and a made-to-measure carcass has to absorb that.
  • A sketch or marked-up plan showing where the unit starts and stops, including skirting, architraves, cornices, radiators, light switches and any built-in niche.
  • Door method: hinged, sliding or an open layout. This changes both the hardware list and the clearance the unit needs to operate.
  • Interior layout by zone — hanging short, hanging long, shelves, drawers, pull-out hampers, lighting. Tell us what you actually store, not what a generic wardrobe plan suggests.
  • The two veneer tones you want, and where each tone appears. Where an existing finish must be matched, send a sample or the finish reference.
  • Quantity of units and the delivery address, so we can price freight to site rather than to port.
Send dimensions in millimetres and label every drawing with the room name and unit reference. Mixed units and unlabelled drawings are the most common cause of a quotation having to be reissued.

How the Quotation Is Built

Once the information above is in hand, we price the wardrobe as an assembly rather than as a single item. The line items below are what you should expect to see on a proper quotation, and each one is a decision you can adjust:

Cost elementWhat drives itWhere you can save
Carcass and sizingTotal linear metres, ceiling height, depth, scribing to uneven wallsConsistent depths across units; avoid one-off depths for a single bay
Veneer species and cutSpecies, grain direction, how many leaves are matched across doorsLimit matched-grain runs to the doors you see every day
Two-tone detailingNumber of tone breaks, trims and shadow gaps between tonesRepeat one detail rule across the run instead of a unique detail per unit
Door method and hardwareHinged, sliding or open; soft-close fittings; sliding track load ratingStandard hardware on bedrooms, upgraded hardware only where use is heavy
Interior fit-outDrawer count, pull-out systems, shelves, integrated lightingPrioritise drawers in the zones you use; shelving is cheaper to change later
FinishSheen level and lacquer build on veneer surfacesChoose one sheen across the project rather than mixing finishes
Packaging and freightDistance to site, container share, packaging grade for built-insConsolidate with other joinery and finishes on the same shipment

Because the specification is project-specific, we confirm dimensions and the selected specifications in writing before production starts. A quotation that omits hardware grades, sheen level or freight scope is not comparable with another, so check those lines before you compare suppliers.

Sample and Approval Stage

For two-tone veneer we advise approving a finish sample before the full run is produced. Veneer is a natural material: tone and grain vary between leaves, and a lacquer sheen reads differently under warm bedroom lighting than under a showroom lamp. The approval stage confirms the species, the two tones side by side, and the sheen. Sign off on the sample, not on a photograph on a screen.

If your project also needs matching cabinetry in the kitchen or media wall, tell us at this stage. Veneer ordered for one room and re-ordered months later for another can differ, so batching the joinery keeps the tones consistent across the property.

Production, Delivery and Fitting

After approval we produce to the confirmed drawings, then arrange freight by sea, air or rail with customs paperwork handled on our side, up to door-to-door delivery. Built-in joinery arrives before the decorating trades finish, so agree the site sequence early: floors and skirting in place, wall finishes complete, services located, and storage available for crates on site. Our installation and after-sales support covers fitting, inspection of snags and replacement of any part damaged in transit.

Common Reasons a Quote Changes

  • Dimensions taken before the floor or plaster was finished, so the unit has to be re-cut to suit.
  • Tone breaks added after the quotation, each one bringing its own trim and edge detailing.
  • Hardware upgraded from standard to soft-close across a whole run rather than where it matters.
  • Interior layout redrawn late, particularly drawer counts and integrated lighting.
  • Freight scope assumed as door-to-door when the quotation covered port only.

Ready for a quotation?

Send your room photographs, dimensions and finish references to PHILLIP, phone or WhatsApp +86-13928214007, email santerson@qq.com. Enquiries are answered during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8). You can also reach us through the contact page.

Explore the wider built-in furniture range, or see how we coordinate joinery, flooring and finishes as one package under turnkey interior project solutions.