A swim spa enquiry is only as good as the information behind it. For project buyers, specifiers and villa owners, the gap between a vague request and a workable one is usually two or three extra details: where the unit sits, how it will be powered, and which equipment the configuration actually includes. The steps below show how to take a design brief and turn it into a complete enquiry for the Outdoor Swim Spa WS-PC01.

Start With the Space, Not the Model Number

Most briefs begin with an image and a mood. That is fine for design intent, but procurement needs dimensions and access. Before you name a model, record three things: the clear size of the area where the spa will sit, the route the unit travels from the delivery vehicle to that spot, and whether the space is at ground level, on a terrace or on an upper slab.

The WS-PC01 appears in our catalogue with dimensions of 3000 x 1050 mm. Treat that figure as a starting point for your layout drawing rather than the final word: shipping footprint, insulation layers and access steps all change the space you actually need on site. Send us the plan sketch with the openings marked, and we will confirm what fits.

Read the Catalogue Specification as a Baseline

The published specification for this model describes a reference configuration, not a fixed package. Comparing it line by line against your requirements is the quickest way to see what still needs to be decided.

Catalogue itemShown on the product pageWhat to confirm in your enquiry
Dimensions3000 x 1050 mmSite layout, access route and clearance for servicing
Jet total53 pcsWhich seating positions and jet zones you want in use
Water pump / filter pump2 pcs / 1 pcRunning duty: occasional leisure use, or daily training and guest use
Total power6.65 kWSupply available on site, circuit rating and electrician scope
Control system1 setWho operates the unit day to day, and where the control is mounted
LED lighting1 pcAmbient or task lighting preference for evening use
Features shownWater jets, LED lighting, OzoneWhether ozone treatment suits your water-care routine
Swim training systemNot listed on this pageWhether you need a swim current; if so we will direct you to the right variant in the range

That last row matters more than buyers expect. If the brief calls for counter-current swimming, say so at the outset. The Swimming Pools and Swim Spas range covers several configurations, and we would rather point you to a suitable model than quote something that disappoints in use.

List the Options You Want Priced In

Catalogue-listed options for this series include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each one should appear in your enquiry as a clear yes or no rather than an assumption.

  • Heat pump — state the water temperature you want to hold and the months of use. This drives both equipment selection and the running-cost discussion.
  • Insulation — relevant for cooler climates, exposed terraces and any unit that runs overnight.
  • UV sterilization and sand filtration — specify these if your maintenance team wants a lighter chemical routine.
  • Steps and access — tell us who uses the spa. Children, older guests and hotel patrons each need different entry arrangements.

Give Us the Site Conditions That Affect Installation

These details decide whether a quotation is realistic or merely optimistic:

  • Slab or deck construction, and whether the load has already been checked by a structural engineer.
  • Drainage and overflow route, including how the area is drained during servicing.
  • Electrical supply at the location: phase, voltage and distance from the main board.
  • Wind, shade and frost exposure at the placement, which affect insulation and cover choices.
  • Any hoisting, crane or tight-access requirement between the delivery point and the final position.
We publish catalogue figures exactly as listed on the product page. Included equipment and electrical requirements are confirmed for the selected configuration before production, so please do not treat a single published number as your final site specification.

Say Whether This Is a Single Unit or Part of a Package

Swim spas rarely arrive alone. In villa and hospitality projects they usually sit alongside poolside paving, wall cladding, lighting and Outdoor Furniture for Villas and Resorts. If your brief already covers those scopes, send them with the spa enquiry. Coordinating finishes, delivery windows and site access in one programme avoids the sequencing problems that appear when each trade is ordered separately.

If you are working from a design intent rather than a fixed product list, our Interior Design Services cover space planning, product specification and drawing coordination, so the spa can be resolved as part of the wider scheme instead of added at the end.

What a Complete WS-PC01 Enquiry Contains

  • Project location, delivery address and site access notes.
  • Plan or sketch of the intended position, with dimensions and clearances.
  • Intended use: private family use, guest-facing hospitality, therapy or training.
  • Required options from the list above, marked as wanted or not wanted.
  • Electrical supply details and who is responsible for connection.
  • Target programme date on site and any handover milestones.
  • Quantity, including whether spares or a second unit may follow.
  • Your procurement route: direct purchase, contractor supply, or OEM under your own brand.

What Happens After You Send It

The enquiry moves through the same stages we apply to other product scopes: consultation on requirements, design and planning with confirmed specifications, production with quality control, logistics to site, then installation support and after-sales service. Freight arrangements, delivery scope and warranty terms are agreed for your specific order rather than assumed from published copy.

Send the brief with the checklist above and you will receive a specification-backed proposal instead of a generic price. For buyers sourcing several scopes together, our Turnkey Interior Project Solutions let one team carry the swim spa, the surrounding outdoor areas and the interior fit-out through the same programme.

Ready to enquire? Share your drawings, site photos and the checklist answers above, and our team will confirm the configuration, equipment list and delivery plan for your project before any commitment is made.