A panelled hinged door looks simple on a drawing. Two leaves, a frame, some hardware. The price difference between two quotations for the same opening can still be large, and the reason is rarely visible in the line item. For buyers comparing classic panel hinged doors across suppliers, the useful comparison starts with what each quotation actually commits to: the make-up of the leaf, the frame that carries it, the hardware set, and the level of detail the factory needs before it can price the order at all.
Start With What the Door Is Made Of
Panelled doors are specified by name in many villa and residential schemes because the profile reads well against skirting, architraves and joinery. But "classic panel" describes a look, not a build. Two doors with the same panel layout can differ completely underneath.
Ask each supplier to state, in writing, how the leaf is constructed for your project: a solid timber core or stiles and rails with a filled field, what substrate sits under a painted or laminated surface, and how the edges are finished where the panel meets the stile. Then ask what happens at the top and bottom edges of a leaf that will sit over a tiled floor. Those answers explain most of the price gap, and they also predict which door still sits square after a heating season.
Surface system is the second thing to pin down. Painted, lacquered, laminated and wood-veneer doors can all carry a panelled profile, and they behave differently in a hallway that sees daily traffic or a bathroom that goes humid several times a day. A supplier who can quote several surface systems for the same panel layout gives you a real comparison; one who offers only a single finish cannot.
Compare the Frame, Not Just the Leaf
The leaf is what people photograph. The frame is what determines whether the door still closes cleanly after a year of use. When comparing quotations, check four frame items side by side:
- The jamb material and its thickness, and whether it is matched to the wall build-up you actually have.
- Architrave or casing profile and width, and whether the profile is the same one used on your joinery and skirting.
- Hinge positions and the number of hinges per leaf for the height being quoted.
- Whether the frame is supplied pre-assembled, cut to length, or as loose components for site assembly.
A quotation that lists only "door leaf plus frame" without these details is not comparable with one that specifies them. Send both suppliers the same wall section and the same opening sizes, then read the answers against each other.
Read the Hardware Schedule Before You Compare Prices
Hardware is where a low quotation usually becomes an expensive project. Confirm for every door in the schedule: lock body and backset, handle set and finish, hinge type and load rating, closers or dampers if required, door stops, and any acoustic or seal requirements. Also confirm what is included in the price and what you must buy locally.
For imported orders this last point matters more than buyers expect. If hinges are sourced at the destination port because they were excluded from the quotation, the local items may not match the pre-drilled leaf. Ask each supplier to issue a hardware schedule per door type, with the model names stated, and price it as part of the package or state clearly that it is excluded.
Check How Far the Supplier Customises
Panelled doors in real buildings rarely fit standard sizes. Ceiling heights vary between levels, openings get shifted on site, and accessibility requirements change clear widths. A supplier that can only offer fixed sizes pushes those adjustments onto your builder, at site labour rates.
The Classic Panel Hinged Doors range on the SANTERSON catalogue is listed as made-to-measure, with material and finish options and a layout tailored to each project. That is the specification level worth aiming for in any comparison: sizing taken from your own opening dimensions rather than a standard size fitted to it. The same configurability applies across the wider door range, from standard interior hinged doors for straightforward room divisions to wood veneer hinged doors where the leaf surface needs to read against veneered wall panelling and cabinetry. Where a project calls for a cleaner line, flush hinged doors sit in the same opening family without the panelled profile.
A practical test of customisation capability: send one awkward opening — a non-standard height, or a door that must align with an architrave running off a panelling line — and see whether the supplier comes back with a shop drawing or with a standard size and a note about packing it out on site.
Compare How Consistent the Doors Will Look Across the Whole Building
Doors rarely get ordered alone in a fit-out. Painted doors, painted skirting, painted joinery and panelling should match in sheen and colour, and wood-look surfaces should match in grain direction and tone. When these come from different factories, small differences in topcoat or laminate batch show up under raking daylight.
This is one reason project buyers group doors with the rest of the built-in package. Ordering integrated door and paneling work from a single supplier means one paint specification, one veneer batch and one edge-detail standard across doors, panelling and cabinetry. SANTERSON works this way as a one-stop furniture and building materials supplier, producing doors alongside cabinetry, wardrobes, wall panelling and the other built-in elements of the same project, which keeps finishes consistent across trades that would otherwise argue about who matched whom.
Judge the Quotation Process Itself
How a supplier handles your enquiry tells you how the order will run. Compare them on the following:
- Do they ask for door schedules and opening dimensions, or quote from a photo of a sample?
- Do they return shop drawings for your approval before production?
- Is the quotation itemised per door type, with sizes, finish and hardware stated?
- Are change orders priced in writing, with a cut-off point defined?
- Who inspects before packing, and what does the packing specification protect — faces, edges, or both?
- What happens if a leaf arrives damaged or an opening on site has moved?
A supplier who works from drawings and issues shop drawings is doing the same job as a local joinery workshop, only at factory precision. A supplier who quotes from a picture is selling you a guess.
Price Per Door Is the Wrong Unit
Compare landed cost per door type instead. That includes the leaves and frames, hardware if included, packing for export, freight to site, and the labour needed to install and adjust. A slightly higher unit price that arrives with architraves matched to your skirting profile can beat a cheaper leaf that needs extra site hours per opening.
For buyers managing doors as part of a wider fit-out, the coordination cost matters too. One supplier handling doors, joinery and finishes means one drawing set, one inspection and one delivery window; several suppliers means several sets of shop drawings to cross-check and several chances for a finish mismatch to be discovered after installation.
A Short Checklist Before You Sign
- Leaf construction and surface system stated per door type, in writing.
- Frame, architrave profile and hinge count specified against your wall build-up.
- Hardware schedule with model names, or a clear statement that hardware is excluded.
- Made-to-measure sizing confirmed from your own openings, not standard sizes.
- Shop drawings approved before production starts.
- Finish consistency plan covering doors, panelling and cabinetry together.
- Packing specification, freight scope and replacement terms for damaged leaves agreed up front.
Run two or three quotations against that list and the price differences start to make sense. You are no longer buying a door; you are buying a defined build, a defined finish and a defined process.
SANTERSON manufactures made-to-measure hinged doors alongside cabinetry, wardrobes, panelling and other built-in elements for villa, hospitality and office projects, with custom/OEM service, door-to-door logistics and installation support. Send your door schedule and opening dimensions to receive an itemised quotation and shop drawings.
Enquiries: https://www.santerson.com/contact/