An aluminium frame glass wardrobe looks simple on a drawing: an extruded frame, a glass infill, a set of internal fittings. On site it is one of the most unforgiving items in a bedroom fit-out. The glass arrives late, the frame finish does not match the sample, the sliding door rubs, or the unit is 15 mm too wide for the recess. None of that is caused by glass or aluminium. It is caused by choosing the wrong maker. This guide sets out how to build a shortlist of furniture and building materials manufacturers who can actually deliver made-to-measure wardrobes, and what to ask each one before the second round of talks.

Why this product line exposes weak suppliers so quickly

Wardrobes sit at the junction of three trades: joinery, metalwork and glazing. A supplier who only cuts board panels cannot extrude or finish a frame properly. A metal workshop that has never built a bedroom unit will get the door weights, soft-close hardware and clearances wrong. Glass adds freight risk on top of that.

Two details make the risk worse in project work. First, wardrobe sizing is fixed once the walls are finished, so there is no room for an on-site correction. Second, a bedroom floor usually repeats across many rooms, so one wrong specification multiplies across the whole order. Shortlisting is not about finding the cheapest quotation; it is about finding a factory that can hold a specification steady across dozens of identical openings.

Screen one: does the maker actually build this type

Ask for the product range in writing, not a photo folder. A credible supplier shows glass-door wardrobes and aluminium-frame wardrobes as separate, live lines with variants they have already produced, because that tells you the tooling, hardware suppliers and finish options already exist.

Within our own catalogue, for example, aluminium frame glass wardrobes sit in one collection, while the bronze glass aluminium frame wardrobe sits in a second collection with tinted infills. When you review any shortlist, ask which collections exist for this type and how many door styles, frame profiles and glass tints each one covers. A supplier offering two or three fixed sizes is a reseller. A supplier offering profile, tint, handle and layout choices is a manufacturer.

Then check whether the same company also supplies the surrounding fit-out: interior fixtures, vanities, wall panelling, lighting and flooring. One supplier covering the whole bedroom package removes handover disputes between trades.

Screen two: how far can they customise

Made-to-measure is a claim until you see the process behind it. Ask each shortlisted maker to walk through, in order:

  • how they convert an architectural opening into shop drawings, and who signs off those drawings;
  • whether they model the unit before cutting, so door swing, skirting clearance and lighting recesses can be checked;
  • what frame finishes and glass tints they hold as standard, and what counts as a bespoke colour;
  • how internal layouts change per room type, such as hanging-heavy layouts for guest rooms versus drawer-heavy layouts for master suites;
  • minimum order quantity per finish, since a special tint at 30 units behaves very differently from a special tint at 300.

Our custom and OEM service covers design and prototyping, bespoke finishes and textures, private labelling and flexible order quantities. Ask the same five questions of every candidate and compare the answers side by side; vague replies here predict disputes later.

Screen three: how they handle glass in transit

For an overseas factory, packaging is a technical question, not a logistics afterthought. Ask specifically:

  • whether frames ship assembled or flat, and who assembles on site;
  • how glass panels are crated — vertical glazing racks, edge protection, interleave sheets;
  • what the packing list shows per crate, so the site team can match each crate to a room number;
  • how breakages are reported and replaced, and how quickly replacement panels ship.

A supplier who runs door-to-door delivery with documentation handled in-house can usually answer all four immediately. A supplier who hands you to a third-party forwarder will not, and the site team inherits the problem.

Screen four: who answers when the drawing is wrong

Every project has one wardrobe where the on-site dimension does not match the drawing. What matters is who takes responsibility for resolving it. Ask each candidate whether they provide a named project contact, on-site guidance during installation, and snag inspection before handover.

Our interior design services include drawing coordination, production coordination and on-site guidance, and our installation and after-sales support covers fitting, inspection and replacement parts. Confirm the exact scope for your project in writing before awarding, since service coverage differs by country.

A comparison sheet to send to every candidate

Question to askWhat a good answer looks like
Which wardrobe collections do you manufacture in-house?Named collections with several door and finish variants, not one generic model.
What is the lead time from signed drawings to shipment?A staged answer: drawing review, sample or first article, then production run.
Can you match a frame colour and glass tint we specify?A clear line between standard options and bespoke, with cost and quantity impact stated.
How are glass panels crated and identified?Room-numbered crates, glazing racks, edge protection, photographic packing records.
Who supports installation and snags on site?A named contact plus written after-sales terms, not a phone line.
Can we visit or audit the factory?A firm date and a list of what can be seen that day.

Shortlist checklist — six checks before you award

  • The maker produces this wardrobe type as its own line, with variants already made.
  • Shop drawings are produced and signed off before any panel is cut.
  • Standard versus bespoke finishes are defined, with quantity thresholds stated.
  • Packaging for glass is described in detail, with room-level labelling.
  • One named person owns the project from order to handover.
  • After-sales terms, including replacement parts, are written down.

Two mistakes that end shortlists

The first is comparing quotations before the specifications match. A lower price often means a thinner frame profile, a single standard glass option or hardware from an unnamed brand. Fix the specification first, then compare.

The second is treating one good sample as proof of consistency. A single prototype tells you nothing about whether 200 units will match it. Judge a maker on their drawing control, their finish library and their packing discipline — those are what repeat across an order.

Talk to us about your wardrobe package

SANTERSON has manufactured furniture and building materials since 2008, with made-to-measure wardrobes, interior fixtures and turnkey project support under one roof. Send us your room schedule and we will come back with drawings, finish options and a quotation for review — contact our team to start.