A wardrobe that looks right in the render can still cause trouble on site if the paperwork behind it is thin. Sliding doors need clear openings, track space and hardware that carry the panel weight for years. When a villa or apartment project orders wooden sliding door wardrobes from an overseas manufacturer, the difference between a smooth handover and a snag list usually comes down to what the procurement team recorded before production started. The checklist below covers the items we ask buyers to put in writing on every built-in joinery package.

Why Sliding Wardrobe Doors Need More Documentation Than Hinged Ones

Hinged doors hang from a frame; sliding doors ride on a track and carry their own weight. That single difference creates several decision points that must be settled on paper: the clear opening between returns, the headroom needed for the track, the pocket or overlap where panels pass each other, and the access route to the internal layout once the front is closed.

For project buyers this matters because built-in joinery is measured against finished wall faces. If the flooring build-up, skirting, cornice or plaster thickness is not fixed when the order is placed, the opening height on site will not match the panel height in the factory. Documenting the finished dimensions, rather than the dimensions on the original architectural drawing, prevents that mismatch.

Item 1: Room Data and Finished Opening Dimensions

Record the wardrobe run against completed finishes, not structural shells. For each unit in the schedule capture:

  • Width, height and depth of the finished opening, plus which wall is taken as the reference line.
  • Floor finish type and thickness in the wardrobe zone, including whether the track sits on the subfloor or on the finished floor.
  • Ceiling detail above the unit: cornice, shadow gap, recessed lighting or a bulkhead that the top track must clear.
  • Position of switches, power points, air grilles and radiators within the run, with distances from the reference line.
  • Squareness and plumb of the walls, noted on site, since sliding panels show out-of-square walls far more clearly than hinged doors.

Where a room uses an angled or returning wall, note it in the schedule and refer to the relevant sliding door corner wardrobes option so the internal layout follows the geometry instead of being cut on site.

Item 2: Panel Material, Core and Finish Selection

"Wooden" covers several very different constructions, and a purchase order that only says wooden leaves the factory and the buyer with different assumptions. For each finish type, confirm the substrate, the surface and the edge treatment in writing:

Finish familyWhat to documentTypical project use
Solid woodSpecies, board construction, finish systemClassic and paneled bedroom schemes
VeneerSpecies, cut, grain matching, lacquer sheenWarm contemporary villas
Melamine / laminateDecor reference, surface texture, edge bandingRepeat apartment bedroom packages
Lacquer and acrylicColour reference, sheen, two-tone splitModern minimalist interiors

Our catalogue lists these as separate collections precisely because the specification differs. A project that wants a wood look with a low-maintenance surface usually lands on matte sliding door wardrobes, while a scheme that mixes a timber panel with a plain field should be documented as a two tone sliding door wardrobe so the split line is drawn on the elevation before production.

Colour rule for procurement files: never approve a panel from a screen image. Record the physical sample reference, the batch it came from and who signed it off, then quote that reference on the purchase order.

Item 3: Hardware, Track and Panel Weight

Sliding hardware is where undocumented assumptions become site failures. The specification sheet should state:

  • Number of panels per opening and the direction each panel travels.
  • Track type and whether it is top-hung or floor-guided, plus the recess or upstand required.
  • Maximum panel weight the hangers are rated for, checked against the finished panel build-up.
  • Soft-close or catch detail, and whether handles, integrated finger pulls or a push mechanism are used.
  • Spare hardware to ship with the order: extra hangers, guides and bumpers stored on site speed up warranty service.

Panel height is the usual constraint. A tall panel in a heavy solid-wood build needs different hangers from a lightweight laminate panel of the same size, so both the height and the finished thickness belong on the sheet.

Item 4: Internal Layout and How It Is Accessed

Sliding fronts limit access: only part of the opening is available at any moment. Document the internal layout against that reality, room by room:

  • Hanging zones with rail heights, short-hang and long-hang sections.
  • Shelf spacing and whether shelves sit in the reachable or the obscured half of the opening.
  • Drawers and whether they can be pulled out with the front panel closed.
  • Lighting inside the carcass, with the switch or sensor position recorded.
  • Beyond the bedroom: built-in furniture such as linen press, TV wall and storage wall units ordered on the same package, each with its own drawing number.

Item 5: Tolerances, Site Conditions and Sign-Off Stages

Built-in joinery fails most often at the handover between trade packages. Put these conditions in the project file:

  • Which trades complete before the wardrobe is delivered: flooring, plaster, paint, electrical first fix.
  • The tolerance allowed for wall flatness and the remedial works if it is exceeded.
  • Storage conditions on site until installation, since panels should stay dry, flat and unpacked only when the room is finished.
  • A named sign-off at each stage: drawing approval, sample approval, dispatch release, installation completion.

Every unit in this category is made to measure for the project it was drawn for, so dimensions and selected specifications are confirmed against the approved drawings before production. Our custom & OEM service covers bespoke finishes and textures, prototyping and brand marking when a project needs something outside the standard collections.

Item 6: Packaging, Delivery and Installation Records

For imported joinery the delivery file is as important as the design file. Record these items before dispatch:

  • Pack list keyed to room numbers and drawing numbers, not just a total piece count.
  • Panel identification marked on the packaging so installers can match each panel to its opening.
  • Freight mode, customs documents and the delivery address for each building or level.
  • Installation scope: who installs, who connects lighting, who makes good around the frame.
  • Warranty terms and the spare-parts route, with contact names recorded rather than a generic inbox.

SANTERSON handles this part of the process directly for project buyers, from production coordination through logistics and door-to-door delivery to installation and after-sales support. That single line of responsibility is what keeps the wardrobe, the matching cabinetry and the rest of the fit-out on one drawing register instead of four.

A Practical Procurement Template

For each wardrobe in a project schedule, one row per unit should carry: room number, drawing number, finished opening width and height, floor build-up, panel material and finish reference, hardware type and rated load, internal layout code, delivery level, installer name and sign-off date. A unit that cannot fill every column is not ready for production.

If your team wants that documentation built from the outset, send us the room schedule and the architectural drawings through our turnkey project solutions team. We return elevations, a specification sheet and a quotation for confirmation before anything is cut.

Send us your wardrobe schedule

Share room dimensions, drawings and finish references for your villa or apartment project. We confirm dimensions and selected specifications with you at each stage before production, then coordinate delivery and installation. Contact SANTERSON to start the specification file.