A set of matte acrylic cabinets leaves the factory as a made-to-measure package: panels cut to your drawings, finishes approved on a sample, hardware matched to the doors. What happens between the production line and your site is where project budgets are won or lost. This guide walks through the sequence we follow for international project orders, and what you should have agreed before the containers are booked.

Why Cabinet Shipments Are Planned Differently from Furniture Shipments

Loose furniture can be reordered in single pieces. Cabinetry cannot. A run of matte acrylic cabinets is a system of dependent parts — carcasses, doors, drawer fronts, countertops, hinges, slides, brackets — and one missing door panel stops a kitchen from being handed over. Two properties drive the whole delivery plan:

  • Made-to-measure. Each unit is built to the dimensions of one opening. There is no shelf of spares in your city, so replacement parts have to be produced and shipped again.
  • Visible surfaces. Acrylic panels are finished before assembly, so corner chips and surface scratches show up at handover rather than in the warehouse check.

The practical consequence: delivery planning starts at the drawing stage, not at the shipping stage. Decisions about tolerances, panel sizes and container fill are made months before the first carton is sealed.

A working rule: if a detail is ambiguous on the drawings, it will be ambiguous in the crate label, the packing list and the customs declaration as well. Resolve it once, on paper, before production release.

Stage 1 — Lock the Specification Before Production Starts

Our cabinet line is supplied through the same custom built-in kitchen cabinets programme used for apartment and hotel fit-outs, so specification control is already part of the process. For an export order we ask for one signed document set covering:

  • Shop drawings with every opening dimension, plus who measured them and when;
  • Door style, handle or handleless detail, and the exact panel colour reference for each run;
  • Hardware schedule — hinges, slide rails, support legs, connecting brackets — matched to door weight and drawer width;
  • A finished sample panel approved before the batch is cut, kept as the colour and sheen reference for handover.

For matte acrylic in particular, we recommend keeping that approved sample on site. Matte finishes read differently under warm and cool lighting, and an inspector with the sample in hand settles colour discussions in minutes instead of weeks.

Where wardrobe orders fit in

The same logic applies when cabinetry is combined with matte acrylic wardrobes in one project. Bedrooms and kitchens are produced on the same finish reference, but they rarely install in the same week. Splitting the packing list by room lets the kitchen crew and the joinery crew each receive their own crates without unloading the whole consignment.

Stage 2 — Pack for the Journey, Not the Loading Bay

Ocean freight is the default for cabinetry: heavy, predictable volume, and a transit that suits production lead times. A container move exposes crates to humidity swings, stacking load and several handling points between our warehouse and yours. Our packing follows the logistics and door-to-door delivery service described on this site:

Packing decisionWhy it matters on site
Crate by room, then by unit groupCrates can be routed straight to the right floor; no sorting warehouse needed.
Edge protection on finished panels, corner guards on doorsMost acrylic claims are edge damage, and guards are cheaper than a replacement door plus freight.
Hardware boxed with its own unit and marked on the crate labelDoors and their hinges travel together, so nothing waits for a missing box.
Unit number printed on the crate and repeated on the drawing referenceInstallers match crate to drawing without opening anything.
Dunnage and stacking plan recorded with the container photosIf damage occurs, the loading evidence supports the insurance claim.

Container fill is worth planning with your freight forwarder rather than leaving to us. Full containers for a whole villa or apartment block are usually the most economical. For a phased renovation, we can hold completed crates and release them across separate sailings so nothing sits in storage at your end.

Stage 3 — Documents That Clear Without Delays

Customs delays cost more than freight. Before the containers move, the following should be issued and shared with your clearing agent:

  • Commercial invoice with values stated per line, matching the packing list;
  • Packing list by crate, with crate count, weights, dimensions and unit numbers;
  • Bill of lading for sea freight, or air waybill when a small urgent batch is flown;
  • Certificate of origin where your import rules call for it;
  • Any import permit or declaration your authority requires for the destination.

Duties, taxes and Incoterms are commercial decisions between buyer and seller. We quote against the term you specify — FOB, CIF or door-to-door — and we will not tell you that landed cost is fixed until your own broker has confirmed the tariff line for your country. Ask your broker early; a single phone call about cabinetry classification usually saves a container of detention charges.

Stage 4 — Sequence the Delivery Around the Site Programme

Cabinets arrive into a building that must be watertight, level and dry. Before booking arrival, confirm on your side:

  • Floors screeded and cured, walls plastered, and the building sealed against rain;
  • First-fix services — water, waste, power — in their final positions, matching the drawings we produced from;
  • A clear route from the delivery point to the installation area, with lift or hoist capacity for long panels;
  • Storage that is dry and lockable, sized for the crate volume on your packing list.

For multi-unit projects we schedule deliveries by unit or floor rather than sending everything at once. That keeps the site unblocked and makes each handover a smaller, signable event. The same staged approach supports the wider turnkey interior project solutions we supply, where cabinetry is only one part of an order that may also include wardrobes, vanities, lighting and flooring.

Stage 5 — Receiving, Installation and the Snag List

The receiving check should happen in the first days after discharge, while a freight claim is still open:

  • Count crates against the packing list before signing off;
  • Photograph any damaged crate externally before opening it;
  • Open a sample of crates per container and check panel faces and edges;
  • Verify unit numbers against the drawings, not just total quantity.

Installation follows the room sequence in the packing list. Our installation and after-sales support service covers on-site guidance, inspection with a snag list, spare parts and replacement for damaged panels. For an export order, agree in advance which party supplies the fixing labour and who signs each stage off; that single line in the contract prevents most disputes.

Common Failure Points and How to Avoid Them

Failure pointPrevention agreed before production
On-site dimensions differ from the drawingsOne named party re-measures after plaster; revised drawings re-issued and signed.
Colour or sheen mismatch between batchesApproved sample panel kept on site; one batch per room where possible.
Hardware not matched to door weightHardware schedule confirmed with the door specification, not left to selection later.
Edge damage found at handoverCorner protection specified in the packing standard; receiving check within days of discharge.
Container arriving before the site is readyDelivery window confirmed against your programme; crates held and released in phases if needed.

A Short Checklist for Your Next Enquiry

Send these with an enquiry and the quotation can be built on real numbers rather than assumptions:

  • Drawings or room dimensions, with the finish reference you want;
  • Quantity by unit type, and how the order is phased across units or floors;
  • Destination port or site address, and your preferred Incoterm;
  • Your target on-site arrival date, not just a production date;
  • Whether you need installation support or supply only.

Enquiries go to PHILLIP by phone or WhatsApp on +86-13928214007, or by email at santerson@qq.com. Send the drawings and we will return a production schedule and a delivery plan you can put into your programme.

Frequently Asked Questions

Can a replacement door be ordered after delivery?

Yes. Made-to-measure doors can be re-produced against the stored drawing reference and shipped as a small consignment. Because it travels again, agree the damage-reporting window at receiving so replacements are handled while freight claims remain open.

Which Incoterm should I choose?

Choose door-to-door when you want one party accountable to the site address; choose FOB or CIF when your own forwarder handles the main carriage and clearance. We quote on either basis — the choice usually follows how much control your team already has over freight in your country.

Should cabinets and wardrobes ship together?

They can, provided the packing list separates them by room and the installation dates are close. If joinery installs weeks after the kitchen, phased shipments reduce on-site handling and storage risk.