A wardrobe drawing that looks finished in a presentation pack can still be unbuildable. Before an oak solid wood wardrobe enters production, the design team and the buying team need to agree on the same set of decisions: what is actually solid oak, where the piece sits relative to walls and services, how it will be opened, what goes inside, and who signs off each stage.

Most wardrobe disputes do not start in the workshop. They start in a handover meeting where the designer says "oak joinery" and the buyer hears "the same detail as the previous project". This article sets out the alignment points we ask clients to close before we quote, so that the drawing pack, the purchase order and the finished installation describe the same piece of furniture.

1. Agree what "oak" means for this project

The phrase covers several different build-ups, and they behave differently once on site. In our catalogue they sit in separate collections, and the distinction matters when a buyer compares quotations from different suppliers:

  • Solid oak components: doors, drawer fronts and frames cut from solid stock, with the grain running continuously across each element. Movement across the grain has to be allowed for in panel construction, which is why frame-and-panel detailing is common on our classic paneled solid wood wardrobes.
  • Oak veneer on a stable substrate: a sliced oak face bonded to an engineered board. It keeps the figure of oak while reducing movement, which suits large uninterrupted door leaves and full-height panels such as our natural oak veneer wardrobes.
  • Oak-look decorative boards: printed or embossed laminates. Cost-effective and consistent, but they are not the same specification and should never be substituted silently.

Write the construction into the drawing rather than relying on a finish name. A line reading "solid oak door leaf, 18 mm thick, painted white" or "oak veneer, clear matt lacquer, book-matched" removes most of the arguments before they begin.

2. Fix the reference lines before the layout

Made-to-measure casework only works if both teams work from the same measured reality. Before we set out carcass widths, we ask for confirmation of:

  • The finished floor level and whether screed, underfloor heating or the final floor covering are already in place when the wardrobe is installed.
  • Squaring and plumb tolerance on the wall faces the carcass touches. A 15 mm deviation along a four-metre run changes every door gap if it is not absorbed by a scribe or a filler panel.
  • The build-up above the head of the wardrobe: ceiling lining, curtain box, shadow gap, or a soffit to be built by others.
  • Skirting and architrave treatment at the base, which buyers often assume is removed but which the site trade may not have scheduled.

On new-build villas the practical question is sequencing. If the wardrobe is measured off a bare structural wall and installed after decorating, the dimensions on the drawing are no longer the dimensions on site. Both teams should agree in writing which state of the room the measurement refers to.

3. Decide the opening system with circulation in mind

The door type governs the plan, not the elevation. A hinged leaf needs its swing radius kept clear; a sliding leaf needs a track zone and a wall to return into; an open wardrobe needs dust control handled another way.

Opening typeWhat the designer commits toWhat the buyer confirms
HingedClear swing in front of each leaf, handle clearance from the opposite wall or bed edge.Hinge brand and loading class, number of leaves per access point, door weight limit.
SlidingTrack position, overlap between leaves, whether the return is a wall or an end panel.Track and runner specification, service access to the top track, room for leaf travel.
Walk-in / openSightlines, lighting positions, and how hanging rails span between supports.Whether doors are in scope at all, and who supplies any glass partitions.

Where the room is tight, our wooden sliding door wardrobes keep the oak elevation while removing the swing requirement. Where a bedroom benefits from an alcove treatment, hinged and corner layouts are covered under our classic wooden hinged wardrobes.

4. Specify the interior against how it will actually be used

Interior zoning is where an owner's brief and a designer's elevation usually drift apart. The alignment exercise is simple: list what is being stored, in what quantity, and who reaches it daily.

  • Hanging zones: short-hang for shirts and jackets, long-hang for coats and dresses. Rail height should be set from the user's reach, not from a default drawing block.
  • Drawer banks: shallow for accessories, deep for knitwear. Deep drawers need a runner rated for the loaded depth, and the front must be sized so contents clear the carcass base.
  • Shelving: fixed shelves are cheaper but often wrong; adjustable shelving on standards costs little more and forgives changing wardrobes.
  • Tall and awkward zones: the top compartment above hanging height needs a defined purpose, otherwise it becomes dead space that still carries joinery cost.

Where storage demand is heavy rather than decorative, drawer-led layouts in our drawer focused modular wardrobes show how a bay can be organised around pull-out storage instead of shelving.

5. Set the finish schedule and the samples that prove it

A finish name on a schedule is not a finish. For oak the variables are the cut of the veneer, the stain or oil system, sheen level, and how the grain behaves at edges and profiled details. We ask buyers to approve physical samples before production release, because a sprayed lacquer reads differently on a flat panel than on a routed profile.

Agree in advance which sample governs: door face only, or door face plus interior carcass lining plus drawer front. That single decision avoids the common complaint that the inside of the wardrobe does not match the presentation board.

6. Lock the interface details that cause site problems

  • Integrated lighting: where fittings sit, how they are wired, who supplies the transformer and where it is accessible for maintenance.
  • Mirrors and glass: whether glazing is supplied with the casework or by a local glazier, and the fixing method.
  • Floor protection and thresholds: relevant where the carcass crosses a junction between two floor finishes.
  • Wall fixings: substrate behind the wall matters for anchor selection; a stud wall, brick leaf and reinforced block each need different detailing.
  • Delivery route: lift dimensions, stair turns and door widths determine whether a full-height side panel can be delivered in one piece or must be jointed on site.

7. Put sign-off stages into the programme

Our cooperation steps follow a simple sequence: project brief and design proposal, then quotation and detail confirmation, then production and shipment with follow-up. The two points that need signatures from both sides are the confirmed drawing pack and the approved finish sample. Anything released without them gets changed later at a cost.

The alignment checklist in one page

  • Construction stated per component: solid, veneer or decorative board.
  • Measured state of the room agreed and recorded.
  • Opening system checked against circulation and hardware specification.
  • Interior zoning written from the owner's storage list.
  • Finish samples approved for exterior and interior faces.
  • Lighting, glazing, wall fixings and delivery route assigned to a named party.
  • Drawing pack and sample signed off before production release.

Where the whole bedroom fit-out is being procured as one package, coordinating casework and joinery with a single manufacturer removes a layer of interface risk. Our custom minimalist bedroom wardrobe range is built to project-specific dimensions with material and finish options selected per project, and our wider product catalogue covers the flooring, wall panels, lighting and joinery that meet the wardrobe on site.

Send us the room drawings, the finish schedule and the storage brief, and we will return a construction proposal with the gaps flagged before anything is released to production. Contact PHILLIP by email at santerson@qq.com or by phone / WhatsApp on +86-13928214007. Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).