Glass and glossy wall panels are one of those specifications that look simple on a mood board and turn complicated on site. A reflective surface shows every uneven substrate line, every mis-set joint and every panel that arrived two millimetres off the opening it has to fill. If you are specifying Santerson Glass & Glossy Panels for a villa, apartment or hospitality room, the checklist below covers what a complete buying brief actually needs: the survey data, the finish decision, the substrate conditions, the coordination with services, and the delivery and installation terms that stop a wall system from becoming a variation order.

Start With What the Product Page Actually Offers

The Santerson paneling range is listed as configurable rather than stocked to fixed sizes. The Glass & Glossy Panels listing states made-to-measure sizing, material and finish options, and a layout specified for each space. The same configuration logic runs across the rest of the Paneling Systems collection, where Matte Lacquer Panels, Textured Panels and Stone & Marble Panels sit alongside the glass option.

That single fact sets up the first two items on your checklist. First, you are buying a made-to-order item, so the panel schedule has to be signed off before production starts and there is little room for an on-site adjustment once panels are cut and finished. Second, the detail page carries limited technical data, so anything that matters to your building code or your client's specification sheet has to be confirmed with the supplier in writing for the exact configuration you chose. Marketing language such as "glossy" does not tell you the substrate, the coating system, or how the panel behaves in a wet area.

Checklist Item 1: Room, Substrate and Survey Data

Write down what is going behind the panels and what the wall actually measures today. Reflective finishes amplify substrate faults, so a survey taken with a straightedge and a level is worth more than a dimension lifted from a drawing.

  • Room-by-room locations, panel heights and total area per wall, including ceiling-to-floor or partial-height runs.
  • Existing substrate type and condition: masonry, plasterboard, existing tile, or timber framing, plus whether it needs packing, levelling or a new base layer.
  • Squareness of the wall and floor levels at both ends of each run, so panel joints and trims can be set to a consistent line rather than following a slope.
  • Opening sizes for doors, windows, niches and any reveal you want framed, recorded as finished opening dimensions rather than structural ones.

If the same wall also carries Integrated TV Panels, a mirror cabinet or built-in joinery, survey those elements at the same time. Panel lines and furniture lines need to resolve together, and this is where a supplier that also manufactures cabinetry can save you a coordination meeting.

Checklist Item 2: Finish, Glass Type and Where It Will Be Used

Decide the finish before you ask for a price, because "glossy" covers very different products with very different handling requirements.

DecisionWhat to confirm in writing
Glass versus glossy laminate or lacquer panelThe actual material being supplied, its substrate board, and the edge treatment on all four sides.
Glass type and safety requirementWhether the configuration uses toughened or laminated glass, and where impact or safety glazing is required in your project. The sliding-panel listings in the same collection note that glass type and safety requirements must be confirmed for each project.
Sheen level and colour referenceA physical sample with a named reference, plus how the finish reads under your chosen lighting. Glossy surfaces show fingerprints and edge wear far more readily than the matte lacquer option.
Wet or humid locationsWhether the selected panel and its edges are approved for bathrooms, vanity walls and splashback use, and what fixing and joint sealant is recommended.
Moving panelsIf you want sliding rather than fixed panels, confirm the track, hardware, load rating and clearance needed at floor and ceiling. The Sliding Panel Systems collection covers Glass Sliding Panels, Textured Sliding Panels and closet panels as separately configured systems.

Checklist Item 3: Services, Fixings and Detailing

This is the section most enquiries skip, and it is where glass walls fail after installation rather than at delivery.

  • Positions of power outlets, switches, data points, integrated lighting and any backlit or media wall detail, dimensioned from a fixed corner on every elevation.
  • Cable routes and access: cut-outs in a finished glossy panel are difficult to trim neatly on site, so holes should be produced during production from your setting-out drawing.
  • Fixing method and substrate preparation, including whether battens, adhesive or a concealed clip system is specified, and who supplies each part.
  • Edge trims, cornices, skirting returns and inside or outside corners, listed as part of the order rather than assumed.
  • Expansion and movement allowance at floor and ceiling lines, particularly in new buildings still settling.

Ask for a setting-out drawing back from the supplier showing panel joints, cut-outs and trims against your dimensions. Comparing that drawing with your survey is the cheapest inspection you will make on this scope.

Checklist Item 4: Commercial Terms for Made-to-Order Panels

  • A panel schedule listing every piece by reference, size, finish and edge detail, with quantities per wall.
  • What happens to the order if a dimension changes after approval, and the cut-off date for revisions before production starts.
  • Packaging and protection for reflective panels, container loading arrangement, and who carries risk in transit. Santerson's logistics service covers freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, but Incoterms, duties, insurance and transit time should be confirmed case by case for your destination.
  • Inspection on arrival: check panel counts against the packing list and look for edge damage before signing, since replacement of a made-to-measure panel is a new production run, not a shelf swap.
  • Installation responsibility. The company lists on-site installation, snag inspection, spare parts and maintenance as services; confirm availability in your city and the exact terms before relying on them.
Practical rule: if a wall system has no signed setting-out drawing attached to the quotation, it is not yet a complete order. Get the drawing, then compare it line by line with your survey.

Checklist Item 5: One Supplier for Panels and the Rest of the Fit-Out

Paneling rarely stands alone. In a bathroom it meets vanities, basins and shower screens; in a living room it meets media walls and storage; in a bedroom it meets wardrobes. Santerson is positioned as a one-stop furniture and building materials supplier, with paneling systems, custom cabinetry, wardrobes, doors, flooring and lighting all under one production and coordination process. For project buyers that means one set of drawings to reconcile and one delivery window to manage instead of several.

The company has operated since 2008 as a China-based manufacturer, with published project references including villa work in Willoughby, Perth, North Turramurra, Melbourne and Sydney. If your project is in Australia, ask for the reference details relevant to comparable wall work and confirm scope before treating those cases as evidence of what you will receive.

A Five-Minute Pre-Enquiry List

  • Elevations for every wall to be panelled, with finished dimensions and a fixed reference corner.
  • Substrate description and current condition for each wall.
  • Location of outlets, switches, lighting and any media or mirror element.
  • Finish decision, glass type if applicable, and the wet or dry status of each location.
  • Your delivery destination and required site date, so freight and production can be planned together.

Send those five items with your enquiry and you will get a panel schedule and quotation that can actually be compared with competing offers. Omit them and every supplier will price a different interpretation of the same wall.