A single pedestal basin looks simple on a specification sheet. It is the room behind it that makes the order complicated: how many bathrooms, which trap each one uses, whether the basins, toilets and showers come from one series or six different suppliers. This guide walks through quantity planning and product coordination for the Freestanding Ceramic Pedestal Basin 1004S, a square floor-standing basin used in villa, apartment and hotel bathroom work, so that purchasing teams can lock quantities once instead of re-ordering on site.
What the 1004S actually is
The 1004S is a freestanding stand basin in a clean square form, made from vitreous ceramic with a dense glossy glaze that resists staining, limescale and yellowing. It is fixed to the wall through a back panel, which adds stability without needing a vanity carcass or counter. A compact 400 mm square footprint (400×400×850 mm on the product page) means it occupies barely more floor area than a wall-hung basin while still sitting on the floor, and it reserves a tap hole for a single faucet.
That combination is why project teams shortlist it: no joinery to fabricate, no stone counter to cut, no vanity to level against an uneven slab. In guest bathrooms, staff washrooms, villa powder rooms and budget hotel rooms, a stand basin usually lands at the lowest installed cost of any basin type on the bathroom sanitary fixtures range.
Step 1: Count basins from the room schedule, not the drawing count
Work from a room-by-room schedule rather than a floor plan. For each bathroom record four things: basin type required (freestanding stand basin, wall-hung basin or counter basin), tap hole requirement, trap type (floor or wall), and whether the fixture sits in a wet or dry zone. Then apply three rules that repeatedly cause re-orders:
- Count spare positions as well as fixed ones. Guest suites with two basins, plant rooms and staff areas often get value-engineered late; leaving those lines blank on the order means a half-pallet top-up later at higher freight cost per piece.
- Add project spares to the first purchase. Ceramic is fragile in transit and sites damage fixtures during other trades' work. Order basins for the room count plus a spare allowance agreed with the contractor, so replacements arrive with the main shipment instead of as air freight.
- Split the quantity by trap and rough-in type. Two identical-looking basins can need different wall fixings and waste connections. Grouping them into one line hides that difference on the packing list.
Step 2: Lock the plumbing interface before you choose the style
Style is decided in minutes; the interface takes weeks if it is left late. For every bathroom confirm:
- Drain location. Floor drain or wall drain, and the distance from the finished wall. The matching Washdown One Piece Toilet 1004A, for example, supports both a P-trap wall drain and an S-trap floor drain with different rough-in distances, which is exactly the kind of detail that must be matched to the existing pipework in a renovation.
- Water supply and tap hole. The 1004S reserves a tap hole for a single faucet. If the design calls for a two-hole or deck-mounted mixer, that is a different product, not an accessory.
- Wall fixing condition. A back-panel wall fix needs a solid or properly boarded substrate behind the tile. On stud or cavity walls, note the reinforcement requirement on the plumbing drawing before the wall is closed up.
- Waste and overflow specification. State the waste type on the order line so it ships with the basin rather than being bought locally at a markup.
Step 3: Coordinate the rest of the bathroom around one series
Mixing shapes and glazes across fixtures is where bathrooms stop looking designed. The 1004S belongs to the 1004 sanitary series, which gives purchasing teams a matched set without separate design decisions:
| Fixture | Series item | Where it goes |
|---|---|---|
| Freestanding stand basin | Freestanding Ceramic Pedestal Basin 1004S | Powder rooms, guest bathrooms, staff washrooms, standard hotel rooms |
| Wall-hung basin | Wall Hung Ceramic Basin 1004B | Tight bathrooms where clearing the floor matters for cleaning and visual lightness |
| One-piece toilet | Washdown One Piece Toilet 1004A | Most bathroom types; the integrated body removes the tank-to-bowl gap where dirt collects |
| Wall-hung bidet | Wall Hung Bidet 1004F | Markets and villa projects where a bidet is specified |
| Shower set | Gun Grey Digital Display Rain Shower System | Rooms where a digital thermostatic display and handheld sprayer are specified |
Two practical points on coordination. First, glaze colour and sheen are batch-sensitive: order the full quantity of each ceramic item in one production run wherever the programme allows, so every piece carries the same surface. Second, keep finish decisions consistent across trades. A matte gun grey shower set beside a high-gloss white basin is a deliberate design choice only if it appears on the design board; otherwise standardise.
Step 4: Build an order sheet a factory can price without guessing
A purchase line for bathroom ceramics should carry, at minimum:
- Model code and product page link, not a description in your own words
- Quantity per model, split by trap or rough-in variant where one model covers two
- Room or block reference, so the packing list arrives sorted for site distribution
- Finish and faucet requirement (single hole, mixer type, exposed or concealed)
- Packaging and pallet instruction for ceramic freight, plus the spare allowance
- Delivery terms and destination, since door-to-door pricing depends on them
The same sheet doubles as the site checklist at handover: each line becomes a count-off item, and any shortage is visible on day one rather than at practical completion.
Step 5: Sequence procurement with the rest of the fit-out
Ceramics are small but they gate the wet trades. Fix the basin, toilet and shower schedule before wall set-out, because substrate reinforcement, waste positions and shower valve heights all depend on which fixture is chosen. As part of interior fixtures, bathroom products are also easier to consolidate with the finishes around them — vanities, mirror cabinets, wall panels, lighting and flooring from one supplier means one consolidated shipment, one packing list and one point of contact when something is short.
For villa and hospitality work in Australia, that consolidation matters most on freight: bathroom ceramics travel badly as a standalone order, and combine efficiently with heavier items such as cabinetry, flooring and lighting in the same container. The logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading; agree Incoterms, duties and delivery address with the supplier in writing for each project rather than assuming a standard term.
Common questions from purchasing teams
Can we mix the 1004S stand basin with the 1004B wall-hung basin in one project? Yes — they share the 1004 series design language, and using the stand basin where walls are solid and the wall-hung basin where floor clearance matters is a normal value-engineering split. Keep the faucet and waste specification consistent between them.
Is a stand basin suitable for a small bathroom? The 400 mm square footprint is designed for compact rooms, and because it fixes to the wall through a back panel it does not need a vanity carcass. Confirm clearance to the door swing and adjacent fixture before setting out.
What is the minimum order for a project? Minimum quantities vary by product and shipment, so state your room count and ask for a consolidated quotation across the series instead of ordering model by model.
Send us your bathroom schedule
Share the room-by-room fixture list, trap types and destination port, and our team will return a consolidated quotation for the 1004 series together with the vanities, mirror cabinets, lighting and flooring around it — produced in one run and shipped as one consignment. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com, or use the contact page.