Open wardrobes read well on a rendering and poorly in a variation order. The reason is rarely the joinery itself; it is that nobody wrote down what "glass" means, who measures the opening, and which interface governs the interior layout. If your project includes Glass Open Wardrobes as part of a villa or apartment fit-out, this is the paperwork we ask procurement teams to lock down before the order is released.
1. The product record: name, category and reference image
Start with a single line item that matches the supplier's own catalogue entry, not an internal nickname. Our Glass Open Wardrobes item sits in the built-in furniture range within the Open Wardrobes collection, alongside Metal Frame Open Wardrobes, Minimalist Open Wardrobes and Wood Tone Open Wardrobes. Record the product URL or SKU, the collection name and one reference image per item.
Why it matters: when a site team queries "the open wardrobe", they may be pointing at three different carcass systems in the same drawing set. A catalogue reference removes that argument before it costs a day on site.
2. Dimensions: who measures, and against which finished surface
Open wardrobe units are made to measure, so the dimension sheet is the contract. Document for each unit:
- width, height and depth, plus the maximum single-piece size that fits the service lift or stairwell;
- whether heights are taken to finished floor and finished ceiling, and who is responsible for those tolerances;
- obstructions: skirting, cornices, air-conditioning returns, sprinkler heads, downlights, curtain boxes;
- the date of measurement and the name of the person or contractor who took it.
Second-fix trades move things. A dimension recorded at first fix is a hypothesis; a dimension taken after wall and floor finishes are complete is data. Write down which one you have.
3. Glass: what to specify, even when the doors are gone
An open wardrobe still carries glazing somewhere in the scheme, and the surrounding glass work has to be coordinated with it. Specify each glazing element separately:
- type of glass — clear, frosted, smoked or ribbed — using the same names your supplier uses on its own product pages;
- frame system and finish, for example aluminium frame in a black or bronze tone;
- where glazing is load-bearing or exposed to impact, the safety-glass requirement written by the design consultant, not assumed by the supplier;
- edge treatment and visible hardware on any adjacent glazed partition or display niche.
For bathrooms and dressing rooms in the same package, matching glazing tone across wardrobes, partitions and vanity fronts is a detail that gets missed at tender stage and fixed with tape on site. Put the glass schedule in the same document as the wardrobe schedule.
4. Interior layout: shelves, drawers, hanging zones, lighting
With no doors, the interior is the visible surface. Document the layout per unit rather than per room:
- long-hang and short-hang heights, trouser pull, tie or jewellery tray, shoe shelf depth;
- open shelf spans and whether a mid-span support is acceptable;
- drawer bank position and count, and whether drawers face into the room;
- integrated lighting: fitting type, sensor or door-switch trigger, transformer location and how it will be accessed for maintenance.
Anything a user can see through an open front should appear on a dimensioned elevation with a finish callout. A plan symbol alone is not a specification.
5. Materials, finishes and the sample record
Our configuration options are project-specific: made-to-measure sizing, material and finish choices, and a layout tailored to each space. That flexibility only works if the selection is captured. For every unit record:
- carcass and door-adjacent board material and surface — melamine, lacquer, acrylic, veneer or solid wood;
- decor name or code from the supplier's sample range, not a colour adjective such as "light oak";
- edge treatment on all visible edges, which for open units is every edge;
- the signed physical sample, its reference number and the date it was approved.
6. Interface, delivery and installation responsibilities
Open wardrobe carcasses sit between several trades. Name the owner of each interface in the procurement log:
- floor and wall flatness, and who rectifies it before the units arrive;
- fixings into the substrate, especially for wall-mounted open wardrobes; a wall-mounted unit needs the substrate type and load path confirmed by the local structural engineer;
- electrical first-fix for interior lighting, and who supplies the transformer;
- delivery route, storage location, container or crate labelling per room, and the installation sequence relative to flooring, paint and joinery.
Our scope covers design coordination, manufacturing, freight and door-to-door delivery, then on-site installation support with inspection and snagging. The part only your local team can own is the substrate, structural fixings and any work governed by local building regulations. Record that split explicitly so nobody assumes the other side has it.
7. Change control and sign-off
Close the log with three items: a revision-controlled drawing set where every wardrobe is tagged to a unit code; a change register showing who requested each layout or finish change, when, and whether it affects price or lead time; and a handover sheet listing the approved samples, as-built dimensions and the spare-parts contact for future maintenance.
A procurement file that answers those seven points turns an open wardrobe from a site risk into a straightforward made-to-measure item. If you are assembling a wardrobe, cabinetry or wider fit-out package for a villa or hospitality project, send us the drawings and the room schedule and we will return a specification to review against this checklist.