A cabinet quotation goes wrong long before the drawing is checked. It goes wrong at the brief, when a buyer writes "matte melamine, grey, as per photo" and leaves everything that actually drives cost and fit to be guessed. The result is a sample that looks nothing like the approved render, or a run of doors that arrives with the wrong reveal. Below is the short list of decisions a manufacturer needs up front when you are specifying custom matte melamine cabinets for a villa, apartment or hotel fit-out.

Start with the room, not the door sample

Melamine panel behaviour is ordinary; what makes a project awkward is the interaction between a flat matte surface and an imperfect building envelope. Send the manufacturer what you actually have on site: measured drawings or a survey of the walls the run will sit against, floor levels at both ends of the run, and the position of services, windows and skirting that the carcase has to clear. A made-to-measure workshop can scribe a cabinet to an out-of-plumb wall; it cannot do that from a plan drawn on a grid.

Also state who is doing the measuring. If your builder is supplying dimensions, ask them to record finished floor level and finished wall face, not structural lines, and to note where tiling or plasterboard will change those faces after the cabinets are ordered.

Name the surface in a way a factory can price

"Matte" is a sheen description, not a specification. Two panels that both read as matte can differ in how they take fingerprints, how they feel at the edge, and how they age under a cooker extract. In your brief, separate three things:

  • Panel type. Say whether you want a melamine-faced board or another substrate with a matte surface, and confirm what the manufacturer is quoting. Our matte melamine, textured melamine and wood grain melamine lines sit in the same collection but read very differently once installed.
  • Colour reference. Give a physical sample or a named colour standard, and say whether you are matching to that sample or approving from a render. A grey that photographs well can look flat against pale stone benchtops in a north-facing kitchen.
  • Edge treatment. State how the panel edges should be finished and whether the edge colour should match the face exactly or sit slightly darker. On matte doors this is the detail people notice first when the run is complete.

Fix the layout logic before drawings are issued

The brief should carry the storage logic, not leave it to the draughtsman. List the appliances with their model numbers and clearance requirements, say which doors you want hinged and which sliding, and mark where you want tall pantry units, drawer stacks and open niches. For a handleless look, decide now between a routed rail profile and a touch-to-open mechanism: they need different door thicknesses and different gaps to the adjacent wall.

If your project also has wardrobes in the same finish, brief them together. Matte finish melamine wardrobes ordered on the same panel batch as the kitchen keep the grain direction and tone consistent from room to room, which is nearly impossible to recover when the two are bought separately.

Agree the sample gate in writing

Before production starts, ask for a physical sample of the door, an edge detail, and one drawer or door assembly with the hardware fitted. Review it under the same lighting you plan to install, next to your benchtop and splashback material. Record what you approved, with a photograph and a date, and put that approval number on the purchase order.

What a complete brief contains

ItemWhy the manufacturer needs it
Measured survey and finished levelsDetermines scribing, plinth height and whether tall units need packing out
Panel type and named colour referenceSets price, lead time and what the approved sample is judged against
Edge and profile detailAffects the look of the completed run and the tooling used
Appliance schedule with modelsFixes ventilation gaps, housing sizes and door weights
Hardware brand and opening methodDetermines soft-close specification and handleless clearances
Quantities by unit typeLets the factory group panels into one batch for consistent tone
Delivery address and who receives goodsChanges packaging, container plan and the handover paperwork

Logistics details belong in the brief too

Cabinetry arrives in a sequence that has to match the site programme. Tell the manufacturer the installation date, the access at the property, and whether goods should be palletised by room so fitters can open one zone at a time. For projects outside China, we handle freight forwarding, export paperwork and door-to-door delivery as part of the service scope, so the receiving arrangement on site needs to be agreed at quotation stage rather than at the delivery date.

If you are buying cabinets alongside other fit-out items, group them. Kitchen joinery, vanities, wardrobes and wall panelling from one custom and OEM supplier means one drawing set to coordinate, one batch of finishes to approve and one delivery window to manage.

Before you send the enquiry: confirm your measured dimensions, name the panel and colour reference, list the appliances, and state the installation date. Those four items turn a rough price into a quotation you can compare against another supplier's.

Questions buyers ask at this stage

Can I order a single sample door before committing to a project?

Yes. A sample door and an edge detail are the fastest way to test a matte surface against your lighting and stone. Order them before the survey is final so the result does not hold up the drawing stage.

What if my site dimensions change after production starts?

Tell the factory immediately. A made-to-measure run can be amended while panels are still in the cutting queue, but once doors are faced and edged, changes mean remaking parts. This is why the survey gate matters more than the drawing gate.

Should wardrobes and kitchen cabinets be ordered together?

Where the same finish appears in both, order them on one panel batch. Tone and grain direction come out of the board run, not the design intent.