A materials schedule that lists "kitchen cabinets" as one line item will not survive the shop-drawing stage. Glass-front aluminium frame cabinetry sits at the meeting point of joinery, glazing and hardware, so it needs its own rows, its own dimensions and its own approval points long before production starts. Below is how procurement teams on villa and residential projects place these cabinets into a whole-project schedule without creating clashes between trades.

Why this cabinet type breaks the usual joinery line item

Standard cabinetwork is specified by panel material, door style and finish. A glass front aluminum frame cabinet adds three variables that ordinary kitchen cabinetry does not carry: the frame profile and its colour, the glass type, and the interface between the two. Each one has to be decided separately, and each one has a different lead time on most project programmes.

The second difference is tolerance. A framed glass door is only as good as the opening it sits in. When the cabinet run is measured from a drawing rather than from the finished floor, ceiling and wall faces, the frame ends up either rubbing against an out-of-plumb wall or leaving a visible shadow gap that no amount of site adjustment can close. That is why made-to-measure sizing should be recorded in the schedule as a site-verification step, not as an assumption carried forward from the design stage.

Where it belongs in the schedule structure

Split the item into four rows so that each one can be priced, approved and tracked on its own track:

  • Cabinetry row — run length, height and depth; carcass layout; which bays are glass-fronted and which are solid.
  • Frame row — profile type and finish for each elevation, recorded per bay rather than as one blanket description for the whole kitchen.
  • Glazing row — glass type per bay, including whether the interior face is visible from the room or backed by a shelf.
  • Interface row — adjoining finishes: worktop return, splashback edge, ceiling reveal, floor screed. This is where most site disputes start.

Keeping these rows separate also protects the budget. If the client changes one bay from clear to frosted glass during value engineering, only the glazing row moves; the carcass pricing and the frame pricing stay intact for comparison against the original quotation.

Reading the product family before you write the rows

SANTERSON's aluminium frame kitchen collection is built around project-specific dimensions, finish options and layouts rather than a fixed modular size. Within that family, the glass-front variants are differentiated mainly by the glazing and by how much of the cabinet interior stays visible:

SANTERSON productWhat changes on siteSchedule note to record
Glass Front Aluminum Frame CabinetsClear view into the bay, so contents and interior finish are part of the design intentInterior shelf material, shelf spacing and any integrated lighting must be fixed at approval
Frosted Glass Aluminum CabinetsDiffused light, contents obscuredSpecify glass orientation and whether the interior face still needs a finished panel
Smoked Glass Aluminum CabinetsTinted glazing that shifts the perceived colour of the frameRecord the frame colour against the tint, since the same profile reads differently behind smoked glass
Two Tone Aluminum Frame CabinetsFrame finish differs from door or panel finish across the runList each finish zone separately; do not merge into a single "two tone" description
Minimalist Black Aluminum Frame CabinetsSlender dark profile that emphasises sightlines and joint qualityNote the reveal at wall and ceiling junctions, where a dark profile shows every irregularity

The same family logic applies elsewhere in the fit-out. Glass-front tall cabinets are used in the same way on bathroom and utility runs, and glass-front display units appear in living areas — which means one approval sheet covering glazing type can serve several rooms if the schedule is organised by material rather than by floor. For a fuller view of what sits inside the kitchen scope, see custom kitchen cabinets for residential and hotel projects.

Sequencing: what has to be decided before the cabinet order

Glass-front cabinetry carries more predecessors than a solid-door run. The following need to close before the order is released:

  • Floor levels and ceiling set-out confirmed. Made-to-measure dimensions can only be taken once the finished floor height and the ceiling line are fixed.
  • Services located. Integrated lighting, sockets inside glazed bays and any appliance housings must be shown on coordinated drawings, because a visible cabinet exposes every cable that a solid door would hide.
  • Glass type signed off with a physical sample. Tinted and frosted glazing read very differently in a catalogue photograph from how they behave against daylight in the completed room.
  • Adjoining trades briefed. The worktop fabricator, tiler and plasterer all terminate into the frame; each needs the same dimension set.

Practical rule: if a bay has a glass front, treat its interior as a visible surface. Anything that would be hidden behind a solid door — shelf edges, cable runs, wall patches, fixing plugs — becomes a finish item and belongs in the schedule with its own line.

Coordinating it as one package instead of several

On whole-house and villa projects, cabinets, wardrobes, wall panelling, doors and flooring are usually bought from different suppliers with different drawing conventions. The glass-front cabinet then has to reconcile with a wardrobe frame from one vendor and a floor threshold from another. Working through turnkey interior project solutions keeps those interfaces inside one production and coordination process, so the frame profiles used in the kitchen can be matched to the ones used in the wardrobes and display units rather than approximated on site.

This matters most where a single sightline crosses several products — an open-plan kitchen running into a dining wall with glazed display cabinets, for example. One coordinated drawing set removes the risk that each supplier interprets the same elevation slightly differently.

Delivery and installation entries in the schedule

Glazed units are the part of a cabinet order most likely to arrive damaged, so the schedule should show packing and inspection as activities rather than assuming they happen automatically. SANTERSON handles logistics and door-to-door delivery, including container loading and customs documentation, and provides installation and after-sales support covering on-site fitting and inspection. Two entries are worth adding explicitly:

  • Goods-in check for glazing. Count and inspect each glazed door on arrival, while replacements can still be arranged before the rest of the fit-out closes around them.
  • Snag list for frame alignment. Sightline, door parallelism and gap consistency are checked after installation; they are the items most affected by site tolerances rather than factory work.

A short checklist before the schedule is frozen

  • Each glass-front bay listed individually, not grouped as "glass doors to kitchen".
  • Frame finish and glass type recorded as two separate attributes.
  • Made-to-measure dimensions flagged as site-verified, with the verification date in the programme.
  • Interior of glazed bays specified: shelves, back panel, lighting.
  • Adjoining finishes named on the same drawing as the frame.
  • Arrival inspection and post-installation snagging shown as scheduled activities.

Send us your cabinet schedule. SANTERSON manufactures glass front aluminum frame cabinets and the wider aluminium frame kitchen collection to project-specific dimensions, layouts and finishes, and coordinates them with the rest of the interior fit-out from production through delivery and installation.