A single wall-hung basin rarely fails a project on its own. What goes wrong is the paperwork around it: one tap hole ordered for a three-hole deck, a waste type that does not match the pipework, or 40 basins delivered when the room schedule called for 36 plus spares. This guide walks through how to quantify and coordinate the Wall Hung Ceramic Basin 1004B so the order arrives complete, consistent and installable.

What You Are Actually Ordering

The 1004B is a vitreous ceramic wall-mounted basin with a glossy glaze and a trapezoid outline. The product page lists it at 510 mm wide, 420 mm deep and 380 mm high, fixed to the wall through a back panel, with a single tap hole for one-faucet installation. Those four facts drive almost every downstream decision:

  • The single tap hole means basin mixer taps only — no pillar-and-cross sets, no integrated deck showers.
  • The wall-fixed back panel means solid or reinforced backing at the fixing line. Stud partitions, tile build-up depth and the position of any in-wall cistern all affect whether that fixing is sound.
  • The 510 × 420 mm footprint sets the clear wall width you need per station, plus elbow room for the user.
  • The glazed surface keeps cleaning simple, but it does not make the basin a rough-in-free product. Waste and supply positions still have to be set before tiling.

Sizes, trap type and rough-in dimensions should always be re-read from the technical data sheet for the batch you are buying, not from a brochure or a previous project drawing.

Step 1: Count Basins by Room Type, Not by Building

Quantity planning starts with a room-by-room schedule rather than a single headline number. For each room type, list the fixture count and then confirm which rooms can carry the 1004B:

Room typeBasin count per roomWhat to confirm before you lock the quantity
Guest bathroom (villa or apartment)1Backing at the fixing line, single-hole tapware, mirror and light position relative to a 510 mm width.
Ensuite / master bath1 or 2Two basins need enough clear wall for both footprints plus shoulder clearance, and two separate supply sets.
Guest cloakroom / powder room1Small rooms may suit the matching pedestal option instead — see Step 4.
Hotel guest bathroom1 per room, repeated across room typesRoom-type mix and repetition count; identical finish across all floors.
Public / common washroom1 per station in the layoutPartition widths, accessibility clearances, and traffic durability of the surrounding finishes.

Once each room type is counted, multiply by the number of rooms of that type. On a hotel or multi-unit villa job this multiplication is where errors hide, so have the schedule checked against the door schedule and the sanitary-ware layout drawing before it becomes a purchase order.

Step 2: Add Spares and Breakage Allowance Deliberately

Ceramics travel long distances, and a small percentage of units are written off in transit or cracked on site after the fact. Rather than assuming a figure, decide the allowance with your supplier against the actual order size and handling route:

  • Transit spares — enough to replace any units rejected at goods-inward inspection without halting the wet trades.
  • Handover spares — a small set kept by the facilities team for future replacement. On hospitality jobs, discontinued models become expensive quickly, so matching spares bought with the original order are usually cheaper than a later special order.
  • Site-damage cover — decide who carries this risk and how replacements are called off, before installation begins.

Ask for the same glaze batch or at least confirm colour consistency across batches. Ordering spares months later can bring a slight shade difference in the glaze, which is visible when an old basin sits next to a new one under the same vanity light.

Step 3: Coordinate the Items That Decide Whether It Installs

Quantity planning is only half of coordination. Each of the following has to be specified once and applied consistently across every station using the 1004B:

Item to coordinateDecision needed
Basin tapwareSingle-hole basin mixer only; agree spout reach against the 420 mm basin depth so water lands in the bowl, not on the rim.
WasteConfirm the waste type and whether a pop-up or free-flow outlet is required, then set it before the pipework first fix.
Wall backing and fixingsSolid timber noggins, steel backing or reinforced board at the fixing line, positioned to the finished tile face rather than the bare wall.
Supply and waste heightsSet-out dimensions taken from the technical sheet and marked on site before tiling; changing them afterwards means breaking finished surfaces.
Mirror, sconce and shelf positionsCentred to the basin station, with the mirror clear of the tap spout swing.
Silicone and fixings kitNeutral-cure silicone for glazed edges; keep the fixing kit matched to the wall build-up on each room type.

Practical rule: freeze the sanitary-ware set-out drawing before any bathroom wall is tiled. Every change after that point costs tile, waterproofing and time.

Step 4: Coordinate Within the 1004 Series for a Consistent Look

Where several fixture types appear in the same building, mixing series is what makes a bathroom look assembled rather than designed. The 1004 sanitary series lets you keep one silhouette across the room and across the project:

  • Washdown One Piece Toilet 1004A — one-piece body with a square-rounded outline, offered with P-trap and S-trap rough-in options so the same model suits both wall-drain and floor-drain layouts. Confirm which trap type each bathroom uses before ordering.
  • Freestanding Ceramic Pedestal Basin 1004S — a compact square stand basin, also wall-fixed by a back panel, useful in cloakrooms and smaller bathrooms where a full-width wall-hung basin crowds the room.
  • Wall Hung Bidet 1004F — where the specification includes a bidet, it matches the wall-hung geometry and keeps the floating look consistent along the wall.

On multi-unit work, write the series reference into the schedule rather than individual product names. That way substitutions are visible as what they are — a change of series — instead of slipping through as a like-for-like swap.

Step 5: Order Through One Coordinated Package

Splitting ceramics, tapware, vanities, lighting and wall finishes across several suppliers multiplies the coordination load: separate lead times, separate packing lists, separate damage claims. Sourcing the sanitary set together with bathroom and interior fixtures from a single one-stop supplier for furniture and building materials keeps one packing list, one container plan and one point of contact for shortages. SANTERSON's stated scope covers design consultation and specification, manufacturing, freight with customs paperwork, installation support and after-sales service including spare parts — useful when the same job needs basins, vanity units, mirror cabinets, shower sets and lighting to arrive together.

For hospitality and villa jobs in Australia, this also means one document trail: commercial invoice, packing list and shipment tracking tied to a single room-by-room schedule, so goods can be checked against the schedule at each delivery rather than reconstructed from memory.

A Pre-Order Checklist

  • Room-by-room basin schedule signed off against the door schedule and layout drawing.
  • Technical data sheet read for the actual batch: overall size, fixing centres, waste type, supply positions.
  • Backing detail confirmed for every wall build-up where the 1004B appears.
  • Tapware confirmed as single-hole, spout reach checked against 420 mm depth.
  • Spare quantity agreed with the supplier for transit loss, site damage and handover stock.
  • Series decision recorded: which rooms take 1004B, which take 1004S, and why.
  • Set-out drawing frozen before tiling; sign-off recorded on site.
  • Delivery split agreed per floor or per building so stock is not stored in wet areas.

Confirm Your Quantity and Set-Out Before You Order

Send us your room-by-room sanitary schedule, the wall build-up detail and the trap arrangement for each bathroom. We will quote the 1004B with the matching 1004 series items, flag any set-out conflicts, and arrange a single coordinated delivery to site.

SANTERSON — furniture and building materials manufacturer, Foshan, China. Phone / WhatsApp: +86-13928214007 (PHILLIP). Email: santerson@qq.com