A rustic solid wood wardrobe rarely fails because of the timber. It fails because six people signed off on three different drawings, and nobody agreed who was answering for grain, finish, size and installation. The checklist below puts names, dates and evidence against every decision that matters on a villa or apartment joinery package.

Who Signs What on a Wardrobe Package

Before any panel is cut, write down who holds each decision. In practice one person often wears two hats; the point of the table is that nobody holds two decisions at once.

DecisionRecommendsApprovesInformed
Make-to-measure dimensions and room setoutSite surveyor / installerClient representative or architect of recordInterior designer, procurement lead
Layout: doors, drawers, hanging zones, shelf mixInterior designerEnd user or owner's representativeManufacturer, installer
Timber species, panel construction, finish systemManufacturer (custom & OEM team)Design leadClient representative, maintenance contact
Budget, variations, purchase order releaseProcurement / quantity surveyorProject owner or developerDesigner, manufacturer
Delivery window, site access, installation sequenceLogistics coordinatorPrincipal contractor / site managerManufacturer, client representative
Handover inspection and defect listInstallerClient representativeProcurement lead, after-sales contact
One approver per decision. If the same person recommends and approves, add a second reviewer for anything that changes price or dimension.

The Five Approval Gates

Gate 1 — Brief and room setout

Sign off the wall lengths, ceiling heights, skirting, cornice lines, door swings and any recesses the wardrobe has to clear. A made-to-measure joinery item is only as good as the survey behind it, so the person who measured should be named on the sheet, with the date of measurement.

Gate 2 — Layout drawing

The end user signs the internal layout: hanging heights, drawer bank position, shelf spacing, mirror or glass fronts, and where the unit stops. Ask them to walk through a normal morning against the drawing. A wardrobe approved on plan alone gets changed after handover.

Gate 3 — Material and finish sample

Rustic solid wood is graded by eye, so approval has to be physical. Issue the selected species and finish as a board or door sample, not a colour chip on a screen. The design lead signs the sample, keeps one copy of it, and records the sample reference on the purchase order. Grain character, knot pattern and tone variation are exactly what the rustic look is selling — confirm how far that variation is allowed to run across a full bank of doors before production starts.

Gate 4 — Shop drawing for manufacture

The manufacturer's confirmed dimensions, construction detail and hardware schedule go back to the approver as one document. This is the version that gets stamped "for production". Anything after this stamp is a variation with a number on it.

Gate 5 — Delivery, installation and handover

The site manager approves access dates; the client representative signs the inspection sheet. Defects are written down with an owner and a date against each line, not agreed verbally at the wardrobe.

Evidence to Attach to Each Gate

  • Signed drawing sheet with revision number and date, in one shared folder rather than six email threads.
  • Photographed finish sample with its reference written on the back.
  • Purchase order restating dimensions, species, finish and hardware exactly as approved.
  • Delivery note naming who accepted the goods on site and what condition they arrived in.
  • Handover sheet listing each unit, each defect, the responsible party and the agreed close-out date.

Variations: Where Approvals Break Down

Three variations cause most of the argument on joinery packages: a dimension that changes after the survey (a floor level lifted, a new skirting detail), a finish swapped because a sample looked different in site light, and a layout change requested once the user sees the carcass going up. Handle each the same way — written request, costed response, one signature from the person who holds budget authority, then re-issue to production.

A supplier running custom and OEM work can absorb small changes cleanly if they arrive before the shop drawing is released. After release, treat the change as a priced variation with its own approval line. That discipline protects both sides: the client sees the cost of a late decision, and the manufacturer does not absorb rework silently.

Handover Sign-Off Sheet

Keep it short enough that people actually complete it:

  • A Dimensions on site match the approved shop drawing.
  • B Finish, tone and grain character match the signed sample.
  • C Doors align, close squarely, and hardware operates as specified.
  • D Internal layout matches the approved layout drawing.
  • E Remaining defects listed with owner and date; nothing left blank.

How a One-Stop Supplier Reduces the Sign-Off Load

Wardrobes rarely sit alone on a project. They share a wall line with wall panel systems, meet the flooring, and often align with interior fixtures in the same bathroom or bedroom run. When those items come from separate suppliers, each approval has to be reconciled against three different drawings — that is where dimensions and finishes get lost.

SANTERSON works as a furniture and building materials supplier for villa, hospitality and apartment projects, covering design coordination, custom and OEM production, door-to-door logistics and installation support under one project file. For a joinery package that means one shop-drawing set carrying the wardrobe, panelling and fixture interfaces together, so each gate above has a single document to sign rather than three.

Related collections in the same solid wood family include Oak Solid Wood Wardrobes, Walnut Solid Wood Wardrobes and Classic Paneled Solid Wood Wardrobes. Dimensions, species and finish are specified per project, so confirm the specification for your own units before releasing production.

Send us the room setout and target handover date, and we will return a wardrobe layout, material options and a shop-drawing schedule built around your approval gates. Enquiries: contact SANTERSON.