A swim spa quote that looks complete on the first read is often the one that causes the most trouble on site. Two quotations for the same model can differ by a wide margin because one includes pumps, control systems and freight while the other lists only a shell and expects everything else as an add-on. Before you sign anything for Outdoor Swim Spa WS-130BⅣ-U, work through the eight checks below using this WS-130BⅣ-U product page as your reference, and put every answer in writing on the quotation itself.

1. Confirm you are comparing the exact model code

Model codes in this range are close enough to be mistyped and different enough to change the specification. In the catalogue, WS-130BⅣ is listed with a swim training system, while WS-130BⅣ-U is listed without one in its captured specification block. Both entries carry the same catalog shell size of 9950 × 3000 × 1430 mm, so a buyer skimming dimensions will not see the difference at all.

Ask the supplier to restate the full model code in the quotation header and in the line-item description, and check that the product page link they send matches the code you intend to buy. If your project needs swim training, ask explicitly whether it is included, optional or excluded on the code being quoted.

2. Match the equipment list item by item

The specification block published for WS-130BⅣ-U lists the following. Put these rows into your comparison sheet and require each supplier to fill in quantity, model name and power for every row.

Item shown in the catalogueWhat to demand on the quote
Catalog dimensions 9950 × 3000 × 1430 mmShell, deck and plant-room clearances; access route for delivery and crane or forklift needs
Control system: 1 setController model, display location, low-voltage wiring run to the pump room
Water pump: 4 pcsPump make, flow rate and which jet zone each pump feeds
Filter pump: 1 pcFiltration media type, cycle time, service access space
Jet total: 23 pcsJet layout drawing and body material; confirm jets are fitted, not optional
LED lights: 5Fitting positions, driver location, replacement part number
Total power 11.85 kWWhether heating is included in that figure or added separately by a heat pump
Features shown: water jets, LED lighting, ozoneWhether ozone generation is standard and what consumables it needs
Catalogue note: the published figures for this model come from the product page and are not a fixed engineering promise. Treat them as the starting point of the discussion, and require the supplier to confirm the exact configuration in writing before payment.

3. Separate standard equipment from optional accessories

The catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options for this range, with availability and compatibility varying by model. A low headline price usually means one or more of these has been moved out of the base scope.

  • Heat pump. Ask whether heating is in the quoted price, what the sizing assumption is, and who supplies the electrical supply to it.
  • Insulation. Relevant to running cost wherever the spa sits outdoors; confirm what is insulated, and to what build-up.
  • Sand filtration. Confirm whether the quoted filter pump works with cartridge or sand media, since the plumbing differs.
  • Steps and access. Steps are often quoted as an accessory while the deck detail is left to the local builder; agree who owns that interface.

4. Put the electrical scope on the table early

Total power is the number most buyers check and the one most often misread. The catalogue shows 11.85 kW for this configuration, but a quotation should still state supply voltage and phase, circuit protection, dedicated earthing, cable size assumptions and where the supplier's responsibility ends and the local electrical contractor's begins. Electrical work on site is normally carried out by others; if that handover point is not written down, it becomes a variation.

Also ask what happens in a power cut: pump and filtration restart behaviour, and whether any part of the control system needs an uninterruptible supply.

5. Check water treatment and daily maintenance duties

Ozone is listed as a feature for this model. Ask what dosing or sanitisation remains the owner's responsibility, what consumables cost over a year, and how often filters and ozone components need replacement. A quotation that includes UV sterilization as an option should say whether it replaces or supplements the ozone system.

Request a maintenance schedule with named parts and intervals. It is a fair request from any experienced supplier, and a vague answer tells you something useful about after-sales support before you commit.

6. Test the delivery and installation terms

A swim spa arriving on a pallet with no unloading plan is a project risk, not a saving. For international orders, check that the quotation states the Incoterm, packaging and container loading arrangement, customs documents such as commercial invoice and packing list, and whether delivery runs door to door or only to port. The logistics and door-to-door delivery service described on our site covers freight forwarding, paperwork and shipment tracking, but the exact terms for your site are always confirmed project by project.

  • Who unloads, and with what equipment?
  • Is a site survey or installation guidance included, and is any installer travel costed?
  • What inspection record is signed at handover, and how are snags logged?

7. Read the warranty and spare-parts section closely

Ask what is covered by shell, equipment, and labour respectively; how a claim is raised across time zones; and which parts are held as spares versus made to order. Warranty wording on marketing pages is not a contract, so request the terms for your configuration in writing, including exclusions such as water chemistry damage from incorrect dosing.

8. Confirm the supplier handles the rest of the project too

A swim spa rarely sits alone. Deck finishes, screening, outdoor furniture, poolside loungers and lighting all touch the same interface drawings. A single turnkey supplier for villas and hospitality projects reduces the number of coordination meetings, because one party owns the schedule across categories instead of several vendors protecting their own scopes. Our team works as a China furniture and building materials manufacturer covering outdoor furniture, interior fixtures, wall and ceiling finishes and poolside products in one programme, with custom and OEM work handled through the same production coordination.

If you are comparing more than one quotation for this model, send both suppliers the same specification sheet and the same site conditions. Different answers to identical questions are far more revealing than different prices.

Quote review checklist

  • Full model code repeated in the header and line items, matching the product page
  • Every pump, jet count, light and control unit listed with make and power
  • Options priced separately: heat pump, UV, sand filtration, insulation, steps
  • Electrical handover point defined, including who supplies the dedicated circuit
  • Maintenance schedule with named consumables and intervals
  • Incoterm, packaging, customs documents and delivery address stated
  • Unloading, installation and handover inspection responsibilities assigned
  • Warranty terms for your configuration, with exclusions listed

Planning a villa or resort project that includes a swim spa? Send us the model code and your site conditions and we will quote the configuration line by line, including what is standard and what is optional. Talk to SANTERSON about your project.