A media wall in a hotel lounge, serviced-apartment living room or villa guest suite looks simple on a drawing: a screen, some shelving, a run of closed cabinetry. On site it is one of the most coordination-heavy elements in the fit-out, because it sits at the junction of joinery, electrical work, low-voltage cabling, lighting and wall finishes. This guide sets out how buyers and project managers specify and procure Santerson Integrated Media Storage for a hospitality project, from the first room-by-room schedule through to delivery and installation.
Why media storage walls need their own procurement package
In most hospitality schedules, joinery is grouped by type: wardrobes, vanities, kitchen cabinets, wall panelling. Media and storage walls are often left in the general "built-in furniture" line and defined late. That is where problems start. A media wall carries a screen, sometimes a soundbar or speakers, devices that must be hidden but still reachable, ventilation for equipment, cable routes to a rack or sideboard, and display shelving that guests will use and staff will clean.
A configurable system such as Santerson Integrated Media Storage is part of the Integrated Storage Walls collection, where finish, layout and dimensions are specified per project rather than chosen from fixed catalogue sizes. That flexibility is the reason it works across guest rooms, suites and lounge areas, and the reason it needs a proper specification early. Treating these walls as their own package, with a dedicated schedule and drawing set, keeps them aligned with the electrical and AV work instead of being reconciled on site.
Step 1: Build a room-by-room wall schedule
Before requesting anything, produce one line per location. Hospitality projects rarely repeat a single design; a serviced-apartment unit, a suite and a lobby lounge all need different arrangements. The schedule should record:
- Room or area type and the number of units affected.
- Clear wall width and floor-to-ceiling height, plus the position of structural columns, skirting, switches and existing outlets.
- Screen size range and mounting method: recessed into the joinery, fixed to a backing panel, or fronted by sliding panels.
- What must be stored, and whether it should be visible or concealed: luggage, glassware, linen, minibar stock, equipment or guest belongings.
- Where the media wall connects to other built-ins in the same room, so reveals and shadow gaps line up across the run.
Once that schedule exists, it becomes straightforward to decide which collection each location belongs to. The Integrated Storage Walls range covers walls where storage is the primary function; the Media & TV Walls range covers arrangements built around the screen itself.
| Project situation | System worth specifying |
|---|---|
| Storage is the main job, with a screen integrated into a full-height wall of open and closed compartments | Santerson Integrated Media Storage |
| A single run that must both hide clutter and show display pieces | Santerson Mixed Open & Closed Storage |
| Recessed shelving to break up a long wall and carry lighting or objects | Santerson Open Display Niches |
| Screen-led composition running to ceiling in a lounge, lobby or master suite | Santerson Full Height Media Walls |
| Screen concealed behind panels when the space is not in use | Santerson Sliding Panel TV Systems |
| Balanced display and closed storage in a lounge or guest living room | Santerson Storage & Display Combo |
Step 2: Fix the interface details before pricing
Configurable systems are quoted against a specification, so vague drawings produce unreliable numbers. The details below should be settled with your design team and confirmed in writing before you ask for a firm price.
Screen recess and ventilation
State the screen size range rather than one exact model, unless the display has already been selected. A recess cut for a specific panel cannot easily absorb a substitution later. Confirm how the back of the recess is ventilated and how the screen is supported: a timber backing frame, a fixed bracket or a mount set into a structural substrate. Where the wall finish continues into the recess, agree the reveal width so the frame reads consistently across every room type.
Cable routes and equipment storage
Decide where devices live: on an open shelf, behind a hinged or sliding door, or in a separate cabinet with the media wall. Doors and closed compartments keep equipment out of sight but need ventilation cut-outs and enough clearance for a technician to reach connections. Specify the position and quantity of back-of-wall cable drops, socket outlets and low-voltage points on the joinery drawing, not only on the electrical drawing. Where integrated lighting is part of the design, Santerson Integrated Cabinet Lighting should be coordinated at the same stage, since driver positions and switching need to be resolved before panels are cut.
Finishes and their surroundings
Media walls rarely stand alone. They abut Santerson Textured Panels, veneer panelling, stone cladding or painted plaster, and the joint between them is where quality shows. Choose finish and material for the wall system at the same time as the adjacent surfaces, and record the transition detail: shadow gap, trim bead, or butt joint. For a project ordering other built-ins from the same supplier, matching veneer and lacquer across wardrobes, vanities and media walls is one of the clearest arguments for grouping them in a single package.
Step 3: Specify made-to-measure, not catalogue sizes
The Integrated Storage Walls listings describe made-to-measure sizing with material and finish options, which suits hospitality work where room dimensions vary between unit types and floor levels. Two practical points follow:
- Take dimensions from the finished face of the wall, after flooring, ceiling set-out and any wall build-up are resolved. A 15 mm difference in floor finish changes a full-height run.
- Group identical room types into one dimension set, then list exceptions separately. Repeatable sets keep production and quality control consistent; long exception lists drive cost and lead time up.
Where the same layout repeats across many rooms, ask for a prototype or first-article wall before full production. A single assembled unit reveals door alignment, panel weight, handleless edge detail and how the screen recess reads in real light, and corrections cost far less at that stage than across dozens of rooms.
Step 4: Place the order through a coordinated workflow
SANTERSON is a China-based furniture and building materials manufacturer working on turnkey villa, hospitality and office projects, with custom and OEM service covering bespoke design, prototyping and material selection. For an overseas buyer, the practical value of that structure is fewer counterparties: the same team handling joinery can also supply wall panelling, lighting accessories and other fixtures for the same room.
A workable sequence for a media storage package looks like this:
- Brief and design proposal: send the room schedule, elevations and interface notes; receive layout and finish proposals to review against the interior design intent.
- Quotation and detail confirmation: check that the priced specification covers backing frames, ventilation provisions, cut-outs for sockets and low-voltage points, and the transition details to adjacent finishes.
- Production and inspection: agree which items are checked before packing, and how assembled sections versus flat packs are separated by room type.
- Logistics: freight forwarding, customs documentation and container loading are arranged centrally. Confirm the delivery address for each phase of a phased hotel project, and label packages by room or unit number so site teams can distribute them without opening crates.
- Installation and handover: on-site installation support, snag inspection and replacement of damaged components are described as part of the after-sales scope. Agree in advance which party fixes the wall systems to the structure and who completes the electrical connections.
Import terms, duties, transit times and warranty coverage vary by destination and should be confirmed for each project rather than assumed from marketing material.
Step 5: Procurement checklist for a media storage package
- Room-by-room schedule with widths, heights, screen size range and storage requirements signed off by the design lead.
- Elevations showing screen recess, ventilation, socket and low-voltage positions, and lighting driver locations.
- Finish schedule matched to adjacent panelling, stone and paint, with transition details drawn.
- Confirmed made-to-measure dimensions taken from finished wall faces, with repeat sets and exceptions separated.
- Priced specification listing backing frames, hardware, cut-outs and any integrated lighting.
- First-article approval before series production for repeated layouts.
- Packing list keyed to room or unit numbers, with a spares allowance for doors, hinges and shelf pins.
- Written agreement on scope split: who installs, who connects, who inspects and signs off.
Materials, dimensions, hardware and electrical options for these wall systems are set per project. Confirm the selected specification with the SANTERSON project team before ordering. See the Integrated Media Storage product page, the service pages and the contact page.
A media wall specified as a coordination package rather than a furniture item arrives ready to install, lines up with the electrical work around it, and reads as part of the architecture instead of a unit dropped into a hotel room.