A sideboard looks simple on a drawing until it has to fit a real wall, clear a radiator or door swing, match the veneer used in the kitchen and arrive intact three thousand kilometres away. That is why our classic sideboards are made to measure rather than shipped in fixed sizes: the carcass dimensions, internal layout and finish are all set from your project information. The quality of the quotation you receive depends almost entirely on how much of that information you send with the enquiry. This guide sets out exactly what to prepare, what we will ask you back, and what a proper quote for a made-to-measure sideboard should contain.

Before You Write: Decide What the Sideboard Has To Do

Two projects can order a cabinet of identical width and still need completely different products. A dining-room piece used twice a year for table linen needs shallow shelving; a buffet in an open-plan kitchen that holds glassware, a wine chiller and small appliances needs load-rated shelves, ventilation and electrical provision. Settle these points internally before you send anything:

  • The room and the wall. Which space it serves, whether the wall is straight or includes a reveal, skirting, socket or switch plate.
  • Storage priority. Crockery, glassware, linen, bottles, small appliances or a mix — and how much of each.
  • Daily or occasional use. This drives hardware quality, soft-close fittings and how the worktop is edged.
  • Whether it must match existing joinery. If the sideboard sits beside our kitchen cabinetry, we can match carcass and door materials, so say which run it belongs to.
  • Budget band. Not a precise figure, but whether you are specifying a contract-grade piece or a feature item for a show home. It determines how many finish options we shortlist for you.

The Six Items That Make an Enquiry Quotable

Send these six and we can usually price the piece in one pass. Missing any of them means another round of questions before a number appears.

ItemWhat to includeWhy it changes the price
Location and delivery addressCountry, city, port or site address; whether delivery is to a builder's compound, apartment floor or resort site.Determines packing specification, freight mode and whether crate reinforcement is needed.
QuantityNumber of pieces, and whether identical units repeat across villas or guest rooms.Repeated units share tooling and jigs; one-offs are priced individually.
Opening dimensionsWidth, height and depth you want, plus clearances for doors, radiators and traffic routes.Carcass size drives board usage, panel counts and hardware load ratings.
Reference image or drawingA sketch with dimensions, a mood image, or a photo of the piece you are trying to match.Tells us whether mouldings, arches or panel profiles are required — these are hand-worked, not CNC-standard.
Material and finish directionSolid wood, veneer, lacquer or melamine; matte or high-gloss; a colour name, RAL reference or sample photo.Finish is often the largest single cost variable between two otherwise identical cabinets.
Internal layoutDrawer versus door split, shelf heights, whether you need a wine rack, cutlery trays or an appliance bay.Drawer stacks and specialist inserts cost more than open shelving.

How to Describe the Finish Without Getting It Wrong

Finish is where remote projects most often go astray, because a screen colour is not a specification. Three practical rules:

  • Name the surface, not just the colour. "Warm oak veneer, matte open-pore lacquer" gives us something to produce; "brown wood" does not.
  • Give a reference where one exists — a RAL code for lacquer, or a physical sample you can post to our Foshan workshop. For matching an existing run of cabinetry, tell us the project; if it is one we already supplied, we can work from the recorded specification.
  • State the sheen and the edge treatment. High-gloss doors need a different edge and polishing process than matte; a rounded "classic" profile needs a different one again. Our buffet cabinets and classic paneled pieces are offered in both, so the choice is yours to make rather than ours to assume.

If you are specifying across several rooms, list every item that shares the finish — sideboard, tall cabinet, media unit, wardrobes. Ordering them together means one batch of material and one lacquer run, which is how a whole-house scheme stays visually consistent.

What Happens After You Send the Enquiry

Our process follows the same steps we use on villa and hospitality projects: a brief and design proposal first, then quotation and detail confirmation, then production, shipment and follow-up.

1. We read your information and come back with questions

Expect queries about wall conditions, floor finish levels (they decide the plinth height), and whether services need to be routed behind the carcass. This stage is short and it prevents change orders later.

2. We propose a layout and confirm details

You receive a dimensioned proposal showing elevations, internal layout and the selected materials. Drawings are confirmed before anything is cut, and this signed-off set becomes the reference for both production and inspection.

3. The quotation

A made-to-measure quote should itemise: carcass and door materials, finish specification, hardware brand and type, worktop if any, internal fittings, packing specification, freight mode and Incoterms, and what is excluded. If a number arrives without those lines, ask for them — vague quotes are where project disputes begin.

4. Production, then logistics

Once the order is placed we manufacture in our factory and arrange freight by sea, air or rail with the customs paperwork your import requires: commercial invoice, packing list and certificate of origin. Tell us at enquiry stage whether you want door-to-door delivery to site or collection at port; it changes both cost and packing.

5. Installation and after-sales

For projects where we support on-site installation, wall conditions must be complete before the cabinets arrive — a set-back plaster line or an unresolved floor level will delay fixing. Snag lists, spare parts and replacement are handled through the same contact who quoted you.

What a Good Quote Should State in Writing

  • Dimensioned elevations for each unit, with tolerances noted for on-site variation.
  • Carcass board thickness and edge banding, door construction and panel profile.
  • Finish system by layer — primer, colour, sheen level — not a colour name alone.
  • Hardware make, hinge type, drawer runner rating and soft-close provision.
  • Packing method: carton, crate or foam-and-crate for glazed or high-gloss doors.
  • Incoterms, port of loading, and which party handles destination customs clearance.
  • What is excluded — site measurement, installation, plinth scribing, electrical work.
Two things we ask clients to confirm rather than assume: exact dimensions and selected specifications are verified per project before production, and any import duty, local building requirement or installer arrangement in your country is confirmed for your specific site. We will tell you plainly when something in a drawing cannot be built as drawn.

Where Classic Sideboards Sit in a Whole-House Scheme

Sideboards are rarely ordered alone. In the villa projects we supply, they usually sit between kitchen cabinetry and bedroom joinery, which means one supplier handling carcasses, doors, wardrobes, media walls and wall panelling keeps the veneer tones and lacquer sheens consistent. If you are furnishing several rooms or several units in a development, send the full room list with your sideboard enquiry and we will quote it as a package — classic sideboards included — rather than as isolated items. As a China-based furniture and building materials manufacturer, we supply both the furniture and the finishes around it, so a single specification covers more of the job.

A Short Example: Two Enquiries, Two Very Different Quotes

Enquiry A: "Please quote a sideboard, 1800 mm, oak." We can only return an indicative range and a list of questions. Nothing is fixed.

Enquiry B: "Melbourne villa, dining room. Two units, 1800 mm wide by 850 mm high by 450 mm deep, one with three drawers over two doors, one with adjustable shelving for crockery. Rift-cut oak veneer doors, matte lacquer to match the kitchen we specified on the North Turramurra project, stone worktop 20 mm, skirting scribed, delivery to site, drawings attached." This is quotable in one pass, and it is the difference between a price you can put in a budget and a number you cannot trust.

Send us your sideboard enquiry

Include the six items above — location, quantity, dimensions, reference drawing, finish direction and internal layout — and we will come back with a proposal and an itemised quotation. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or through our contact page. Enquiries receive a response within 24 hours during business days.

Frequently Asked Questions

Can you match a sideboard to kitchen cabinets from another supplier?

We can work to a posted physical sample or a stated colour reference, and we will tell you where a close-but-not-identical match is the honest answer. Matching a run of cabinetry we supplied ourselves is straightforward, since the specification is on file.

Do you produce one-off sideboards, or only project quantities?

Both. Single bespoke pieces for a house and repeated units across a development are manufactured on the same lines; minimum order quantities are discussed per project rather than imposed as a fixed number.

What if my wall is not straight or the floor level varies?

Tell us at enquiry stage. We can design in an adjustable plinth, a scribed filler, or a shadow gap that absorbs variation — but only if we know before the carcass is cut.

Who installs the sideboard after delivery?

Either your trades or ours, depending on the project. Where we support installation, fixing requirements are issued with the drawings so wall preparation, floor levels and any services are finished before the units arrive.