A double basin countertop looks simple on a drawing and complicated on site. Two basins, two sets of taps, an overflow arrangement, a waste and trap below the timber, plus a stone surface that has to survive daily use in a family bathroom or guest ensuite. If your quotation only says "double vanity with stone top", it is not a quotation yet — it is a placeholder.
This guide walks through the items we ask buyers and builders to confirm when they request a Santerson double basin countertop. Everything here is made-to-measure, so the point is not to find a cheaper line item but to make sure the line item matches the room you are actually building.
1. The dimensions that change everything
Start with the wall-to-wall measurement and the position of every fixed element: the door swing, the towel rail, the toilet centre line, the shower screen edge and any recess or boxed-in pipework. A countertop drawn to a rounded number will not fit a room built to those same rounded numbers.
- Overall length, depth and thickness. Ask for the finished size of the top, not just the cabinet size, and confirm whether the thickness includes the front edge profile.
- Basin centres. The distance between the two basin centres decides whether both users have elbow room. Confirm this against your plan, not against a standard catalogue spacing.
- Setback from the wall and any upstand. Decide whether you want a square rear edge, a small upstand or a sealed mitre, especially behind a tap that splashes.
- Cut-outs for taps, waste and overflow. Ask which of these are shown on the shop drawing and which are assumed to be site-made.
- Splashback return. If the top returns into a side wall, get that return dimension in writing; it is one of the most common site surprises.
2. How the basins are actually mounted
"Double basin" describes the count of bowls, not how they sit. The mounting style changes the height of the counter, the joinery below and the tap spout reach you need.
| Style | What to check on the quote |
|---|---|
| Undermount | Cut-out size and corner radius, the fixing method under the stone, clearance for the basin body inside the cabinet, and whether the waste tail is included. See our undermount basin range. |
| Vessel (above counter) | Finished rim height above the counter, spout height and reach, and whether the counter needs a recessed shelf or a solid support frame. |
| Integrated | Whether the bowl is carved from the same block as the top, how the flat base of the bowl drains, and who seals the joint — there should be none. |
Our integrated basin option removes the joint that usually fails first, but it needs a shallower, better-drained bowl geometry than most people expect. Ask for a section drawing before you approve it.
3. Surface material and finish, stated precisely
Write the material down by name in the quotation. "Stone top" is not enough; the same words cover very different budgets and very different maintenance. Our stone and marble surfaces are supplied with made-to-measure sizing and selectable finishes, so the specification should record exactly what you chose.
- The material family and, where relevant, the slab or block reference.
- Finish: polished, honed or textured — and whether all exposed edges match the surface.
- Edge profile and arris, with a drawing, because "bullnose" means several different shapes.
- Sealing or treatment applied at the factory versus what your installer must do on site.
- Vein direction or grain direction if the pattern matters to the design intent.
4. Tapware, waste and trap clearances
The countertop supplier rarely supplies the taps, so this is where two trades disagree on site. Confirm on the drawing:
- Hole diameter and position for each tap set, and whether concealed mixers need a box behind the wall.
- Spout reach relative to basin depth, so water lands in the bowl and not on the rim.
- Waste type — pop-up or click-clack, with or without overflow — and whether the wastes are included.
- Trap and pipework route below the counter, including the clear height left for a drawer or basket underneath.
5. What sits under the top
A double layout is often specified as part of a wider joinery package. If your project also needs the cabinet, vanities and matching storage, ask whether the quote covers one coordinated set or several separate items from different ranges. Our double vanity is configured to the same dimensions and finish options as the tops, which keeps the two elements aligned on height, overhang and hardware.
Check explicitly for: load support for a heavy stone top, whether drawers or doors sit below each basin, the position of any electrical outlet or shaver socket, and how the unit is fixed to the wall when the pipework is in the way.
6. Packaging, delivery and site handling
Stone tops are broken more often in the last ten metres than in the ocean crossing. A good quotation states how the item travels and what happens if it arrives damaged.
- Packaging method: crated, foam-faced, edge-protected, and whether the top is packed flat or upright.
- Delivery term — port, door or room-of-need — and who provides unloading labour and equipment.
- Inspection window on arrival, with photographs before the crate leaves the site.
- What replacement of a damaged top costs and how quickly it can be remade; a made-to-measure item is not off-the-shelf stock.
SANTERSON handles freight forwarding, export paperwork and door-to-door delivery as part of the order, so we can arrange the shipment alongside the rest of the fit-out rather than leaving you to coordinate a separate stone courier. Terms and transit arrangements are confirmed per project.
7. Installation responsibility and the snag list
Decide in advance who levels the cabinet, who sets the top, who seals the perimeter, who connects the wastes and who signs off the finished installation. Put that split in the quotation.
A practical acceptance check before you sign: level front to back and side to side; no rocking at any corner; basins seated with even clearance all round; every waste holding water before the sealant cures; taps centred on their holes; silicone joints neat and continuous; and no chip or scratch on visible edges. We provide installation support and after-sales service, including inspection and spare parts, and we ask customers to raise snags with photographs while the item is still on site.
8. The line items that get missed
| Frequently omitted | Why it matters |
|---|---|
| Cut-outs for taps, waste and overflow | Site cutting on stone risks chipping and voids the finish warranty discussion. |
| Splashback return and upstand | Extra material and a second profile; often quoted only after the order is placed. |
| Reinforcement under cut-outs | Long tap banks weaken a thin slab unless they are supported. |
| Basket, waste and trap set | Two basins means two of everything; confirm whether they are in scope. |
| Matching vanities and hardware | Finish mismatch between top, cabinet and handles shows up immediately after handover. |
| Spare sealant and touch-up kit | Cheaper to keep on site than to source three months later. |
A quick way to read the quote. If the document answers six questions — exact finished dimensions, basin mounting style and centres, named material with finish and edge profile, tap/waste/overflow provisions, who installs and who seals, and how damage in transit is handled — it is a real quotation. If any of those six are missing, the gap will be paid for later by whoever is standing in the room when the top arrives.
Ordering as part of a wider fit-out
Bathrooms are rarely bought alone. Villa and hotel projects we supply usually combine sanitary ware with vanities, wall and floor finishes, lighting and joinery, which is where a single supplier starts to save real coordination time. Our bathroom sanitary fixtures range covers basins, toilets, bidets and shower systems, and our custom and OEM service covers bespoke sizing, material and finish choices with flexible order quantities. Send us the room dimensions, a plan or a marked-up photograph of your current vanity, and we will return a specification you can compare line by line against any other quotation.
Frequently asked questions
Can the countertop be made to a non-standard depth?
Yes. The top is configured per project, so depth, length and thickness are set from your drawing rather than from a fixed catalogue size. Share the finished wall-to-wall dimension and the position of existing pipework before we prepare the shop drawing.
Are the basins included with the countertop?
It depends on the configuration you choose. Undermount and vessel bowls are separate items fixed to the top; an integrated bowl is formed from the same material as the top. The quotation should name which option applies and list the wastes, baskets and traps separately.
What drawing do you need before production?
A dimensioned plan and one elevation showing tap positions, basin centres and any wall returns. We issue a shop drawing for your approval; production starts once that drawing is signed back.
Can the top match a vanity we already have?
Often, yes — send a photograph with measurements and the existing material named. Matching an aged or discontinued finish is where we will tell you honestly what can and cannot be reproduced.
Contact SANTERSON to have a double basin countertop specified for your project. We are a China-based furniture and building materials manufacturer supplying bathroom, kitchen and interior products for residential, villa and hospitality projects worldwide, with made-to-measure production and door-to-door delivery arranged per order.