A wardrobe quote that looks complete on the surface can still leave weeks of rework later. Two suppliers can price the same bedroom very differently: one quoted carcass height, the other quoted room height; one included doors in the unit rate, the other listed them separately; one shipped flat-packed, while the other arrived assembled. Before you sign anything for paneled hinged wardrobes, read the quotation line by line against the drawing and make sure every item below is written down rather than assumed.

1. Confirm the quote is built on your measured opening, not a standard module

Hinged-door wardrobe pricing moves sharply with height and depth, so a figure based on a "typical" module tells you little about your wall. Ask the supplier to state room height, finished wardrobe height, and carcass depth and door thickness separately, and to show where skirting, cornice, air-conditioning ducts or power points have been allowed for.

  • A dimension schedule that lists each unit by position (Unit A, Unit B) rather than one total metreage.
  • A note on how out-of-square walls and uneven floors are handled: scribing, packers, or an adjustable plinth.
  • The clear opening width the doors need to swing, checked against beds, door handles and light switches.

Our paneled hinged wardrobes are made to measure, with the layout, material and finish specified per project, so the drawing and the quotation should reference the same numbers. If they do not match, request a revised quote before production is scheduled.

2. Read the door construction line carefully

The word "paneled" covers several different build-ups, and each one behaves differently after years of daily use. Establish which you are actually buying:

Item in the quoteWhat to confirm in writing
Panel constructionFramed panel with a raised, recessed or flat centre; whether frame and centre share the same substrate and finish.
SubstrateEngineered board, solid timber or moulded profile, and which part of the door each applies to.
FinishLacquer, melamine, veneer or paint; sheen level; whether physical samples are supplied before production.
Edge treatmentEdging on visible panel edges and on any cut-to-size adjustment made on site.

If a project mixes styles, check the related collections in the same family (shaker panel wardrobe and raised panel wardrobes) and confirm that door thickness, hinge positions and finish match from room to room. Otherwise one house can end up with three slightly different whites.

3. Check which hardware is included and which is optional

Hardware is where a competitive-looking quote quietly becomes an expensive one. Ask for make, model and load rating on the line item instead of the word "premium".

  • Hinges: soft-close or standard, cup diameter, and whether they are included in the door price or billed per piece.
  • Handles or integrated pulls: finish, length, and whether matching options exist for other cabinetry on the project.
  • Interior fittings: rails, shelves, drawers, runner type and lighting provisions, each marked as included, optional or excluded.
  • Fixings suited to the actual wall build: masonry, timber stud and plasterboard each need different anchors.

For a multi-apartment or villa package, ask for hardware as a schedule with quantities. That makes substitutions visible and keeps later rooms consistent with the first one.

4. Compare interiors, not just external dimensions

Two quotes for identical external sizes can differ widely because the interiors are not comparable. Ask the supplier to state shelf count and depth, hanging-rail heights, drawer numbers, and whether tall units carry storage above the door line. If your brief calls for a mix of open and closed storage, that should be quoted explicitly rather than left to "standard internal layout".

Where the design includes display niches or glazed fronts in some rooms and solid doors in others, each variation needs its own line item with a drawing reference.

5. Match the finish schedule to the rest of the joinery

Wardrobes rarely stand alone; they read against interior fixtures such as vanities, tall cabinets and wall panelling. The quote should use the same finish codes as the rest of the project, and state whether one code covers carcass exterior, door faces, shelves and any matching trim.

Veneer and wood-effect surfaces vary between batches. If your schedule includes natural oak veneer wardrobes next to melamine or lacquered units, ask that the samples attached to the quote carry the reference numbers already approved for the rest of the fit-out.

6. Make the commercial terms as specific as the technical ones

These points should appear on the face of the quotation, not in a later email:

TermWhy it matters for wardrobes
Delivery basis and IncotermsSets who pays freight, insurance and duties, and where your risk ends.
Packaging specificationDoors and panels are the parts most often damaged in transit; ask how they are protected and racked.
Shipment planTells you whether one late item holds up the whole fit-out.
Payment stagesDeposit, pre-shipment balance, and any retention tied to a snag list.
Replacement policyHow a mis-measured or damaged unit is re-made, and who covers freight in both directions.
Quote validityBoard, hardware and freight costs move; an expired quote gets repriced without discussion.

For cross-border orders, ask which documents travel with the shipment (commercial invoice, packing list, certificate of origin) and who prepares customs paperwork. Suppliers that handle furniture logistics and door-to-door delivery as part of the package save you from chasing a freight forwarder while a container sits at the port.

7. Get drawing sign-off scheduled before production starts

A supplier worth appointing will not begin cutting until you have approved shop drawings showing dimensions, door elevations, hinge positions and interior layouts. Confirm that this step exists, how many revision rounds are included, and how the price changes if a dimension moves after sign-off. It is the cheapest place to catch an error: once production has started, the same mistake costs a re-made unit plus freight both ways.

If you have not yet appointed anyone, ask each bidder to set out their one-stop furniture and building materials scope (design coordination, custom production, delivery, installation and after-sales support) and to say plainly which parts sit inside the number on the quote and which are priced separately.

Pre-signature check: measured dimensions shown on a drawing; door build-up and finish named; hardware listed with quantities; interior layout itemised; finish codes shared with the rest of the joinery; Incoterms, packaging and replacement terms written out; drawing sign-off booked before production. If any line is missing, request it in writing before paying a deposit.
Send us your drawings. SANTERSON manufactures made-to-measure paneled hinged wardrobes and the wider wardrobe, cabinetry and interior fixture ranges used on villa, hospitality and office projects. Email santerson@qq.com, or contact PHILLIP on WhatsApp +86 139 2821 4007 with your floor plans, and we will return an itemised quotation you can compare line for line against your other bids.