A swim spa of this size is not a catalogue item you can order from a photograph. Before a quotation for the Outdoor Swim Spa WS-S07M becomes a purchase order, the questions you put to a supplier decide whether the shell arrives on your deck in one piece or sits in customs for six weeks. The checks below are the ones worth insisting on.

Start with the specification sheet, not the model name

Model codes across an outdoor swim and hydrotherapy range look almost identical and mean different things. For the WS-S07M, our catalogue lists a shell of 7000 × 2200 × 1480 mm, one control system, three water pumps, one filter pump, forty jets in total, two LED lights and a total power figure of 10.75 kW, with water jets, LED lighting, ozone and four water columns shown as features. Ask any supplier to restate those same lines in their own quotation and compare line by line. Where a number differs from your brief, get the difference explained in writing before prices are compared.

One detail matters more than the others on this model: the captured specification sheet does not list a swim training system for the WS-S07M. If your project brief calls for counter-current swimming rather than hydrotherapy jets and water columns, that gap needs resolving with the factory before you commit — either the equipment is added to the configuration, or a variant built around a swim training system is the better starting point.

Confirm what is included and what is optional

Optional accessories in this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a supplier who quotes only the base shell has not quoted your project. Ask for two columns: equipment included as standard, and options priced separately with their effect on power draw and on the electrical supply your site can provide.

Electrical requirements belong in the same conversation as the total power figure. A factory that sells swim spas alongside other building and outdoor products will normally have already dealt with this question for export orders, and can tell you what needs to be prepared on site before delivery day.

Judge the supplier by how the whole order travels

A 7-metre shell crossing an ocean is a logistics project. Our own scope runs from design consultation and material selection through manufacturing, quality control, project management and site coordination to final installation and handover, with freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery handled in the same contract. That single point of responsibility is what keeps a swim spa, the outdoor furniture around it and the deck under it arriving on the same schedule instead of in three separate consignments.

Ask specifically who prepares the commercial invoice, packing list and certificate of origin; how the container is loaded and braced; and who signs off the delivery at your site. Vague answers here are the clearest warning sign in this category.

Check that configuration changes are actually possible

Site dimensions rarely match a catalogue drawing exactly. Our customizable shape outdoor spa work covers square, round, oval and curved layouts on an acrylic shell with structural reinforcement, which is the kind of flexibility to test any supplier against: can they rework a footprint, move an access step, or change a finish to match adjacent paving, and what does that do to lead time and price? Custom and OEM work — prototyping, bespoke finishes, private labelling — should be described concretely, with the minimum order quantity stated rather than implied.

Compare the range, not one product page

A supplier holding a deep range makes substitutions easy when a site condition changes. Within our swimming pools and swim spas catalogue, the 7-metre format also appears as WS-S07B and WS-S07B-T; that variant lists a swim training system, forty-four jets, three LED lights plus twenty-six small LED lights, one water pump and a total power figure of 8.75 kW on a shell of 7000 × 2200 × 1365 mm. Being able to move between close configurations inside one supplier's range is worth more than a marginally lower price from a single-model trader.

Where the brief asks for an extended swimming channel with a separate relaxation area, see also our long outdoor swim spa with hydrotherapy and relaxation pool.

Specifications quoted above, as captured in our catalogue

ModelWS-S07M
Catalogue dimensions7000 × 2200 × 1480 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total40 pcs
LED lights2
Total power10.75 kW
Features shownWater jets, LED lighting, Ozone, Waterfall, 4 water columns
Figures above are transcribed from the catalogue page for this model. Included equipment, electrical requirements and optional accessories vary with the selected configuration, so confirm them for your own order before a quotation is signed.

What to send in your enquiry

  • Site photos, the deck or slab dimensions and how the shell will reach its final position.
  • The intended use: hydrotherapy and water features, counter-current swimming, or both.
  • The electrical supply available on site, and whether a heat pump or insulation package is needed for the local climate.
  • Your preferred delivery terms and destination port or address.

Send those four items and a serious supplier can come back with an itemised configuration instead of a brochure. For villa and resort work, we cover this scope together through turnkey project solutions, so the swim spa is specified alongside the rest of the outdoor and interior package rather than bolted on late.

Talk to us about your swim spa specification

Send your site dimensions, intended use and electrical supply, and we will confirm which configuration of the WS-S07M range fits — including included equipment, options and door-to-door delivery. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use the form on our contact page.