Glass paneled wardrobe doors look simple on a drawing and complicated on site. The panel is only part of the assembly: there is a frame, glass, hinges or sliding gear, an internal layout, wall and ceiling finishes that must meet the unit cleanly, and — in a multi-bedroom project — several rooms whose dimensions are never quite identical. This guide walks through how we set out quantities for Glass Paneled Wardrobes and how those units are coordinated with the rest of the joinery, so a buyer or contractor can price and order the package once instead of revisiting it every time a drawing changes.

Start From Rooms, Not Doors

The most common estimating error is counting wardrobe doors. A door cannot be ordered on its own; it belongs to a carcass, and that carcass belongs to a wall opening with constraints at the top, the side and the floor. We build the quantity sheet from room schedules instead:

  • Room by room. Each bedroom, dressing room or hallway niche is listed separately with its clear width, height and depth, plus what sits above, beside and below the unit.
  • Carcase count per room. Width divided by practical module width gives the number of sections. A single wide run is split into modules so doors, shelves and hanging rails line up sensibly.
  • Door count follows the modules. Hinged doors are sized to each module; sliding panels are counted as leaves with an overlap allowance, which changes the leaf width but not the opening it covers.
  • Internal layout per room, not one standard fit-out. A guest room rarely needs the same drawer stack as a master bedroom used year-round.

Because these units are made to measure, with finish, layout and dimensions specified for each space, the schedule is what fixes the price. Two villas with the same number of bedrooms can produce very different quantities once ceiling heights, corner returns and internal fit-outs differ.

A Quantity Sheet That Holds Up

For a wardrobe package we ask for the following lines to be priced as separate items. Keeping them apart is what lets you substitute or re-order one element later without repricing the whole job.

Line itemHow it is measuredWhat usually changes it
Wardrobe sections (carcasses)Number of modules per room, each with width, height and depthCeiling height, skirting, services that force a setback
Glass paneled doorsNumber of leaves or hinged doors, with panel style and glass type noted for each roomDoor style change from hinged to sliding; arch or profile detail added late
Frame and profilesLinear metres around openings plus glazing beadsGlass thickness, edge detail, reveal depth
Ironmongery and gearHinges per door leaf, or sliding tracks and hangers per opening; handles and closers as listedDoor weight and height; soft-close options
Internal fit-outRails, shelves, drawer stacks and shoe trays counted per roomClient storage brief; wardrobe depth available
Lighting and accessoriesPer door or per compartment as specified on the drawingWhether wiring is run before or after installation
Site adjustment and installationPer room, with an allowance for scribe cuts on out-of-square wallsOlder buildings, plaster variation, floor levels

Practical rule: every quantity line should carry a room reference and a drawing revision number. A wardrobe order that says "12 doors" cannot be checked against a site condition; a line that says "Bedroom 3, left wall, drawing rev C" can.

Coordinating the Wardrobes With Everything Around Them

Glass-fronted paneled doors reflect light and show every line next to them, so the surrounding trades matter more than with a plain painted door. Three interfaces decide whether the finished work looks built-in or bolted on.

Walls, ceilings and floors

Decide early whether the unit runs to the structural ceiling or stops below a cornice, and who fills the gap. If plasterboard finishes against the wardrobe, that interface needs to be on both the joinery drawing and the plasterer's setting-out sheet. Floor levels and screed thickness determine whether the base is scribed on site or set proud of the finish floor.

Flooring and adjacent cabinetry

Where a wardrobe shares a wall with custom built-in kitchen cabinets or a matching storage wall, the two should be ordered from one schedule with the same board material, edge treatment and finish reference. Two separate orders from two schedules is where colour and grain mismatch begins.

Glass type and door style as a set decision

Clear, frosted, ribbed and smoked glass all behave differently in a paneled door: they change how much of the interior is visible, how fingerprints read, and how the panel catches light from a window. Choose glass and door style together per room rather than at the end of the job. If the doors slide instead of hinging, compare options in the Glass Sliding Door Wardrobes range before the schedule is frozen, because the track and the reveal are part of the wall build-up.

Keeping a Multi-Unit Package Manageable

Apartment blocks and villa portfolios repeat the same bedroom types, which makes coordination easier but mistakes more expensive. Our usual sequence for a package order:

  • Type drawings first. One approved detail per room type, with dimensions left as variables, so variations are priced as deltas rather than new designs.
  • One finish schedule for the whole job. Panel profile, board material, glass type and ironmongery referenced by code, applied consistently across rooms.
  • A typical unit approved before the full run. One wardrobe built and reviewed catches door alignment, glass tint and handle choice while only one room is committed.
  • Release in site-ready batches. Rooms are manufactured and delivered in the order the site can actually receive and install them, which keeps unpacked units out of damp rooms.

What We Need From the Buyer to Quote Accurately

  • A room schedule or marked-up floor plan showing each wardrobe location with clear opening dimensions.
  • Ceiling and finish-floor levels, plus construction type for walls the units fix to.
  • Door style and glass preference per room, or a shortlist to be advised on.
  • Internal fit-out notes per room: hanging lengths, drawer counts, shelf depths.
  • Delivery destination and site access, which affects packaging and batch sizes.

With those items we return made-to-measure sizing, a material and finish selection, and a layout drawn for the actual space. Dimensions and selected specifications are confirmed for each project before production starts.

Common Quantity Mistakes Worth Avoiding

  • Ordering doors without the frame schedule. The glazing beads, seals and profiles around a glass panel are what make the door read as paneled.
  • Ignoring out-of-square walls in older buildings. A scribe allowance costs little; an under-sized carcass on site costs far more.
  • One internal layout copied to every room. Hanging heights and drawer counts should follow how each room is used.
  • Choosing glass after the interior is fixed. Frosted and ribbed panels hide a busy interior; clear glass does not, and the fit-out then has to look deliberate.
  • Splitting wardrobe and cabinetry orders across schedules. Finish matching becomes guesswork.

Questions Buyers Ask About This Range

Can glass paneled doors be used on sliding as well as hinged wardrobes?

Yes, with the right gear. Sliding leaves need tracks above and below and an overlap allowance, so the wall build-up and the reveal are set before the unit is made.

How many rooms can be ordered in one package?

Any number. Multi-unit work is handled through type drawings per room type and released to site in batches, so the finish stays consistent while delivery follows the programme.

Are internal layouts included in the quantity sheet?

They are priced as their own line — rails, shelves and drawer stacks counted per room — so a change to storage layout changes one line rather than the whole wardrobe price.

Can the same finish be carried through to other built-in joinery?

Yes. Where a project needs storage beyond bedrooms — hallway runs, dressing rooms and display niches — Combination Modular Wardrobes can be scheduled against the same finish codes, so the built-in furniture arrives as one coordinated package rather than several unrelated orders.

Ordering With SANTERSON

SANTERSON has manufactured furniture and building materials for project customers since 2008, with custom and OEM production covering bespoke sizes, panel profiles, board materials, glass types and finishes. For a wardrobe package we work from your room schedule through design confirmation, production, door-to-door delivery and installation support, which keeps built-in furniture coordinated with the rest of the fit-out instead of arriving as separate purchases.