A wall hung toilet 1038W looks simple on a specification sheet: a rimless ceramic pan, fixed to a wall, with a concealed cistern behind it. The submittal pack that supports it is what actually decides whether the product can be installed on site without rework. Below is the document set we ask consultants, contractors and procurement teams to prepare when this type of wall mounted WC enters a residential, boutique hotel or commercial restroom package.

What the Wall Hung Toilet 1038W Submittal Pack Must Contain

Why a wall hung toilet needs a fuller submittal than a floor standing WC comes down to how it is supported and connected. A floor standing toilet carries its own weight on the finished floor, and the waste connection usually runs into the slab. A wall hung pan transfers load to a framing and carrier system inside the wall, and the waste runs horizontally through that wall. Two consequences follow, and both need documenting rather than assuming:

  • The support structure is part of the product decision. The pan, the concealed cistern and the carrier frame are supplied and installed as one assembly. A submittal that shows only the ceramic leaves the structural question open.
  • The rough-in is fixed once the wall is closed. Outlet position, pipe size and framing depth must be agreed before the stud wall is boarded, which is why the dimensional drawing belongs in the submittal and not in a later site query.

For the 1038W specifically, our own product page records a P-trap wall drainage arrangement with a 180mm figure and a compact pan intended for smaller bathrooms. Treat those details as the starting point for coordination and confirm them against the technical sheet issued with your order before any setting-out drawing is released.

Item 1: Product Identification and Scope of Supply

Start the pack with a one-page cover that states exactly what is being submitted. Include the model number, product name, the room types or floors it applies to, and the quantity band for the package. Then list the scope of supply line by line, so nothing sits in an assumed gap between trades:

  • Ceramic wall hung pan, including colour or finish code
  • Concealed cistern and its actuator plate, with single or dual flush stated
  • Carrier frame or support rail, with fixing method to stud, masonry or timber framing
  • Wall waste connection and offset connector
  • Seat and cover, if included in the quoted package rather than ordered separately
  • Spare parts and consumables held for handover, such as seals and flush mechanism service kits

A short scope-of-supply table removes most disputes before they reach site. State plainly which items are supplied by us and which are provided by others, for example the tiling substrate, the access panel to the cistern, or the seat if it is being sourced separately.

Item 2: Dimensional Drawing and Setting-Out Levels

This is the drawing that trades work from. It should show, on a single sheet:

  • Overall pan dimensions and projection from the finished wall face
  • Centre line of the waste outlet and its height above the finished floor
  • Centre lines and heights of the water inlet and cistern connection
  • Framing depth required, including the thickness of the finished wall build-up
  • Position of the actuator plate relative to the finished floor and finished wall face
  • Minimum clear approach and clearance in front of the pan, checked against your room layout

Give every dimension from the finished floor level and the finished wall face, not from the structural substrate. On a refurbished villa or a hotel guest bathroom where the wall build-up varies from room to room, dimensions taken off the substrate are the most common cause of a pan sitting proud of the tiling or an actuator plate landing in a cut tile.

Confirm the trap type and rough-in for each bathroom before ordering. The 1038W is described with a wall outlet arrangement; where a project has floor outlets, a two piece washdown toilet 1038A with S-trap and P-trap options is usually the more direct fit, and switching products after framing is expensive.

Item 3: Material and Finish Documentation

For a rimless ceramic pan, the material section answers three practical questions: what the body is, how the surface behaves in daily use, and what the finish looks like once installed under project lighting.

  • Body material. The 1038W is described as vitreous ceramic with a seamless glaze. State the material on the submittal so that cleaners, facility managers and future replacement orders reference the same specification.
  • Glaze and cleaning regime. Note the recommended cleaning agents and, just as importantly, the ones to avoid. Abrasive pads and strong acidic descalers damage glaze, and a maintenance note in the submittal prevents damage that appears at handover.
  • Rim design. A rimless bowl has no concealed rim channel for dirt and limescale to collect in. Record this on the submittal because it changes the cleaning routine and the inspection points during snagging.
  • Colour and hardware finish. Include the seat, cover and actuator plate finishes so they can be checked against the tapware and basin finishes in the same room.

Item 4: Performance Data to Request Rather Than Assume

Flush performance figures vary with cistern type, water pressure and supply arrangement. Rather than copying numbers from marketing material into your specification, request the data sheet that matches the cistern actually being supplied, and check these items:

Data pointWhy it matters for coordination
Full flush and reduced flush volumesDetermines the supply sizing and whether the package contributes to a project water-efficiency target.
Minimum and maximum operating water pressureSupply pressure changes across the floors of a villa or hotel block; a pan that performs well at one pressure can flush poorly at another.
Flush noise characteristicsRelevant where bathrooms share a wall with bedrooms or hotel corridors; also affects the wall build-up and insulation detail.
Trap seal depthAffects odour control in guest bathrooms that sit unused between occupancies.
Static load rating of the carrier frame and pan assemblyGoverns fixing detail to the framing system; read it as a combined figure for the assembly, not for the ceramic alone.
Flush mechanism service accessDetermines the size and position of the access panel your joiner or tiler needs to leave open.

If a figure is not on the sheet, do not let it enter the specification as an estimate. Ask us for the tested value with the cistern combination you are ordering.

Item 5: Installation Method Statement and Responsibility Split

Wall hung WCs pass through several trades in a short window, so the submittal should include an installation sequence that names who does what. A workable sequence runs:

  • Framing stage. Carrier frame installed to the specified height, braced into the framing system, with the waste pipe routed and supported.
  • First fix sign-off. Rough-in dimensions checked and recorded before the wall is boarded. This single check prevents most rework.
  • Boarding, waterproofing and tiling. The cistern box and access panel are set out so the actuator plate lands on a whole tile where possible.
  • Second fix. Pan hung on the studs, cistern connected, seat fitted, actuator plate attached.
  • Commissioning and snagging. Flush cycle tested at both volumes, waste joint checked under pressure, glaze inspected after grout cleaning.

Where a project is being furnished and fitted out as one package rather than item by item, this responsibility split is easier to control. Our own service range covers custom and OEM service, logistics and door-to-door delivery and installation and after-sales support, so the same team that produced the submittal can be the one coordinating delivery to site and the fixing stage. Confirm the scope, terms and response commitments for your specific project in writing; do not rely on general service descriptions as guarantees.

Item 6: Coordination With the Rest of the Bathroom Suite

A wall hung pan rarely specifies itself alone. The submittal should show how it sits alongside the other sanitaryware in the same room, because shape, mounting method and finish have to read as one set:

  • Basin. A matching wall mounted washbasin keeps the floating look consistent and leaves the vanity floor clear. See the wall hung basin 1038WB, fixed by a back panel so no floor area is occupied.
  • Bidet, where the project specifies one. A wall mounted bidet follows the same framing logic as the pan, so both rough-ins should appear on the same setting-out drawing. The wall hung bidet 1004F is one option for European-style villa and boutique hotel bathrooms.
  • Shower and tapware. Flush plate finish should be checked against shower controls and basin mixers at the same review, not later. Where the guest bathroom also takes a wall mounted shower set, such as a modern rainfall shower system with handheld sprayer, its valve body and slide bar sit inside the same wall build-up, so those rough-ins belong on the same drawing as the pan and basin.
  • Cabinetry, wall panels and flooring. Pan height and actuator plate position interact with wall panelling heights and vanity units. Fix these levels once, across all room types, in a single schedule.

For guest bathroom packages on hospitality work, this coordination is where most value sits. Our bathroom fixtures for hotel projects range groups ceramics, showers and related fixtures so a project can specify one coordinated set instead of matching separate suppliers.

Item 7: Commercial Terms, Lead Time and Spares

Close the submittal with the commercial information a procurement reviewer needs to approve it:

  • Packed quantity, carton dimensions and pallet or container loading arrangement for the package volume
  • Production lead time stated from confirmed order, and separately from approved submittal
  • Delivery terms and destination, with customs documentation listed
  • Inspection and packing photographs before shipment, where your project requires them
  • Spare parts availability for flush mechanisms, seats and seals across the project's maintenance period
  • Replacement policy for transit damage, with the evidence required to make a claim

For multi-unit work such as a villa refurbishment or a hotel floor repeat, order in one batch where possible. Batches split across production runs can vary slightly in glaze tone and hardware finish, which is visible once several identical bathrooms are opened up side by side.

A Quick Pre-Approval Checklist

Before the pack goes out for review, confirm each line below is present. A missing item here usually surfaces as a request for information after the wall has been closed:

  • Model, finish and full scope of supply, including what is excluded
  • Setting-out drawing with dimensions from finished floor and finished wall face
  • Confirmed trap type and rough-in for every bathroom type
  • Cistern, carrier frame and actuator plate identified as part of the assembly
  • Performance data sheet matching the cistern actually being supplied
  • Access panel size and position shown on the wall build-up detail
  • Cleaning and maintenance note, including products to avoid
  • Coordination drawing with basin, bidet and tapware finishes
  • Lead time, packing data, delivery terms and spares plan

Send us the drawings. If you are specifying a wall hung WC for a villa, hotel guest room or commercial restroom, share the bathroom layout and existing drainage positions and we will return the technical sheet, setting-out detail and a quotation for the complete set, including cistern, frame and matching basin.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Contact page