A quotation for classic French double doors often arrives as a single line item with a unit price and a lead time. Two suppliers can look interchangeable on that page, while one is quoting a made-to-measure timber door with glazed panels and hardware, and the other is quoting a hollow slab with an optional frame and no glass at all. The difference only surfaces on site, when the opening is out of square, the reveal is narrower than the drawing assumed, or the astragal bars do not match the sample you approved.

Assessing a manufacturer’s proposal is therefore not about reading the number in the price column. It is about confirming that every element of the door set has been priced, dimensioned and specified before production starts. The checklist below follows the order in which decisions actually get locked in, from opening dimensions through to delivery and installation.

1. Confirm What the Quoted Scope Covers

Before comparing prices, list what is included for each door set. In our work on villa and residential projects, this is the single most common source of variation between proposals.

  • Leaf only, or leaf plus frame? Ask whether the price covers the sash, the surrounding jamb and architrave, or only the door leaves.
  • Glass included or priced separately? French doors are defined by their glazing. Confirm whether the glazed panels, the internal glazing bars and any decorative glass are in the quoted amount.
  • Hardware listed line by line. Hinges, handles, keep plates, locks, door closers and threshold pieces should appear as separate items, not folded into a lump sum.
  • Finishing scope. State whether the doors are supplied primed, lacquered or painted, and which side of the finish is covered.
  • Ancillary items. Transoms, side panels, mullions and any arched head detail should be itemised where they exist on the drawing.

A usable proposal states these items explicitly. Where a supplier leaves them out, ask for a written revision rather than assuming they will be added later at no cost.

2. Check How Dimensions Are Taken and Confirmed

Classic French double doors are almost always made to measure. A proposal that quotes from drawing dimensions alone, without a site-verified opening, transfers the risk of error onto the buyer once production begins.

Good practice is a two-stage check: nominal dimensions for the quotation, then confirmed dimensions before cutting. Ask which stage your price is based on, and who signs off the final sizes. For older buildings and renovated villas in particular, openings rarely sit plumb and parallel, so the finished door set has to be dimensioned against the actual reveal.

Also confirm the orientation of the opening pair — which leaf is active, which hand the hinges fall on, and whether the doors swing into or out of the room. These details change hinge loads and hardware selection, and they are cheap to fix on paper and expensive to fix after assembly.

3. Read the Material and Construction Specification

The words “French doors” describe a form, not a build. Ask what sits behind the description:

ElementWhat to ask for in the proposal
Core and frame constructionSolid timber, engineered stiles and rails, or a hollow core — stated plainly, with the section sizes.
Finish systemThe specified finish family and whether painted, veneered and laminated options are available for the same model.
GlazingGlass type and thickness, and whether single or double glazed units are offered for the opening.
Glazing barsBar width, spacing and whether bars sit inside the sealed unit or on the surface.
Threshold and sillIncluded material and height, especially where the doors meet flooring or an external level.

Where a supplier offers custom and OEM work, they should be able to confirm material choices such as wood, metals, engineered stone and laminates at specification stage rather than only after an order is placed. If the proposal cannot answer these questions in writing, treat it as incomplete.

4. Match the Door Set to Its Position in the Plan

The same classic profile behaves differently across a project. A pair leading from a living room onto a terrace carries traffic and weather exposure that an internal study entrance does not. Review each position on your door schedule against the proposed build, and ask where specification should change.

Design intent matters as much as performance. If the architecture calls for a traditional panelled elevation, classic French double doors in a painted or wood-tone finish usually sit best with panelled joinery and skirting of the same profile. Where the same room reads better with a lighter sightline, modern slim frame French doors keep the daylight while reducing the visual weight of the stile. A manufacturer who understands the project will flag these substitutions rather than quoting the schedule exactly as received.

Door sets rarely stand alone on a fit-out. They are read against wardrobes, panelling and cabinetry in the same line of sight, so ask how the proposed finish is matched to other joinery packages, and whether the same supplier or partner is producing those elements.

5. Verify Samples, Drawings and Approval Stages

Ask what approvals sit between quotation and production, and get them in writing:

  • A dimensioned shop drawing per door set, showing elevations, hinge hand and glazing layout.
  • A physical or photographic finish sample for the colour and grain you have selected.
  • Confirmation of glass pattern and bar spacing at actual scale where the design is visually sensitive.
  • A stated cut-off point after which changes attract cost or delay.

For projects that also involve interior design coordination, this stage is where drawings and production information are reconciled. Suppliers offering interior design services typically work through a project brief and design proposal, then quotation and detail confirmation, before production begins — which is the same sequence you should expect for doors.

6. Compare Delivery, Packaging and Installation Terms

Glazed made-to-measure doors are fragile and dimensionally unforgiving, so logistics belong in the assessment, not after it.

  • Packaging method. Ask how leaves, frames and glazed units are crated and separated, and how they are protected on multi-model shipments.
  • Delivery terms. Confirm whether the price is ex-works or delivered to site, and who handles freight and documentation for cross-border shipments.
  • Sequencing. Doors must arrive after wet trades and flooring levels are complete. Confirm how production timing is aligned with your programme.
  • Site support. Ask whether installation or on-site guidance is offered, and what happens if an opening on site does not match the confirmed dimension.

Suppliers running a turnkey model handle production, logistics and installation as one chain. That matters for door packages because a measurement error can otherwise be blamed across three contracts. Where the supplier offers turnkey interior project solutions, ask specifically who is accountable for site verification of openings.

7. Read the Commercials Carefully

A fair comparison needs the same basis on both sides of the sheet:

  • Price per door set, plus separately priced frames, glass and hardware.
  • What is excluded — subframe, sill, ironmongery not listed, site adjustments, spare keys.
  • Payment stages tied to drawing approval and release for production.
  • Lead time stated from which milestone: order, payment, or approved drawings.
  • Treatment of spares and replacement parts after handover.

Where quantities exceed a single villa — an apartment scheme or a hospitality project, for example — ask whether minimum order quantities apply to the door line and whether hardware can be matched across models so that one specification covers several positions.

8. Red Flags in a Door Proposal

  • A price with no dimensioned drawing attached, or a drawing without your confirmed opening sizes.
  • “Frame included” with no jamb section, material or finish stated.
  • Glass described as “standard” with no thickness or type.
  • Hardware omitted entirely and left to site purchase.
  • Lead time quoted from enquiry rather than from approved drawings.
  • No defined change cut-off, so every revision is priced ad hoc later.

Practical test: take the two most recent proposals and ask each supplier the same three questions — what is excluded from the price, who confirms final opening dimensions, and when does the lead time start. The answers reveal more about the quality of the offer than the headline figure.

Conclusion

A sound proposal for classic French double doors reads like a build specification: scope itemised, dimensions confirmed twice, materials and glazing named, approvals scheduled, and delivery and installation terms defined. Assess it against those points rather than unit price alone, and most cost surprises disappear before production begins.

If you are sourcing door sets alongside other joinery, flooring and interior fixtures from a furniture and building materials manufacturer, consolidating the specification with one supplier reduces coordination risk across packages.

Product finishes, dimensions, glazing options and service scope are confirmed per project. Contact details for enquiries: SANTERSON, PHILLIP, +86-13928214007 (WhatsApp), santerson@qq.com.