A request for quote on white shaker cabinets usually arrives at a factory with one line of text: "white shaker, 10 linear metres, please quote." The price that comes back is almost always wrong for the kitchen actually being built. Not because the supplier is careless, but because shaker cabinetry is priced by decisions, not by door style. This guide sets out what a buyer should put in the enquiry so the quotation can be compared line to line across suppliers, and so nobody discovers the extras after production has started.
Why Shaker Quotes Are Hard to Compare
A shaker door is simple: a flat centre panel with a square frame around it. That simplicity is exactly why buyers assume it is standard. In practice the same door drawing can sit on three different cabinet bodies, with four different finishes and two entirely different hardware sets, and each combination changes the price materially.
When the enquiry only names the door style, every supplier fills the gaps with their own default. One quotes a painted MDF door on a particleboard box; another quotes the same-looking door on a moisture-resistant substrate with soft-close runners. Both look correct in the email. Neither is comparable until the specification is written down.
1. The Door Itself: Profile, Substrate and Paint System
State the door construction in the RFQ rather than leaving it to the supplier's standard range. For white shaker specifically, four points decide both cost and how the door ages:
- Frame radius and centre panel. A tight square arris and a flat centre read as modern; a softened edge and a raised or recessed centre read as traditional. Ask for the profile drawing, not just "shaker".
- Substrate. MDF takes paint smoothly and is the usual choice for a sprayed white door. Plywood and solid timber frames move differently in humid rooms. Specify which one you are being quoted.
- Finish system. Say whether you want painted, lacquered, melamine or PVC-wrapped. A wrapped white panel and a sprayed white panel photograph identically on a sample card and wear very differently at the edges over years of use.
- Sheen. Matt, satin and high gloss are different products with different prices and different tolerance for fingerprints. For busy family kitchens and hotel rooms, low sheen is usually the practical choice; see our white matte cabinets range.
Ask for a physical sample of the exact door you are being quoted, in the exact finish, before you sign. A colour chip is not a door.
2. Cabinet Body, Not Just Door Front
The most common surprise on a cabinetry invoice is the body. Many quotes priced by "linear metre" cover doors, carcasses in one board thickness and nothing else. Specify:
- Carcass material and board thickness, and whether the same board is used inside tall and wall units.
- Whether back panels are fixed or structural, and how wall units are hung.
- Finish inside the cabinet — painted interior, plain board edge, or matched colour. Painted interiors cost more and are worth pricing deliberately rather than discovering later.
- Toe kick, scribe fillers, cornice and any panels needed to make units flush with an uneven wall on site.
For hotel and apartment work, ask the supplier to state which of these are included in the unit rate and which are measured separately. Our custom built-in kitchen cabinets are quoted as complete sets with matching hinges, drawer slide rails, support legs and connecting brackets listed, so the comparison between bidders stays honest.
3. Hardware: Name It or Pay for It Later
Hardware is where a low quote becomes a mid-priced one after delivery. Put the following in the RFQ as line items:
| Item | What to specify |
|---|---|
| Hinges | Brand or grade, soft close yes/no, opening angle, integrated or clip-on |
| Drawer runners | Full extension or partial, load rating, soft close, runner height for deep drawers |
| Handles | Handleless profile, integrated pull, or supplied knobs and pulls — and who supplies them |
| Adjustable shelves | Number per unit, pin system, span before a shelf bows under load |
| Appliance integration | Ventilation gaps, door fixings, and cut-outs for ovens, refrigerators and dishwashers |
If you want a handleless look on a shaker door, say so explicitly. Handleless is a different door profile and a different carcass detail, not a hardware swap — see the handleless minimalist kitchen cabinets page for how we build that detail.
4. Layout, Dimensions and the Numbers a Supplier Needs
A quotation without dimensions is an estimate, and estimates move. Attach what you actually have:
- A dimensioned plan of the kitchen, including ceiling height, window sill heights, and the position of soil stacks, flues and switchboards.
- The appliance schedule — oven, hob, extractor, refrigerator, dishwasher models or their external dimensions. Tall units have to be built around these; our integrated appliance tall cabinets are made to the appliance you nominate rather than to a generic housing.
- The worktop thickness and material, because it sets the height of base units and the reveal on the scribe.
- Whether corner units should be lazy Susan, pull-out or shelf-and-door. Corner hardware changes both price and usable storage; see pull out corner cabinets.
- Lighting intent: under-cabinet strip, in-cabinet lighting for glass-fronted units, and where the transformers will sit.
If you are ordering a run of identical units for apartments or guest rooms, send one typical unit detail plus the total count. Repeaters are where made-to-measure pricing should start to work in your favour.
5. Quantity, Project Type and Delivery Terms
The same cabinet priced for one villa and priced for forty apartments is not the same price. Tell the supplier:
- Total linear or square metres, and the number of bathrooms, kitchens or units in the package.
- Project type — private residence, serviced apartment, boutique hotel — because it sets the wear standard you should be specifying.
- Delivery terms: ex-factory, FOB, CIF or delivered to site, and who handles customs clearance on your side.
- Packaging standard for ocean freight, and how cartons are labelled against unit numbers on the drawings.
Ask for the quotation broken into cabinet sets, hardware, packaging and freight. A single lump figure cannot be compared with a competing bid, and it hides exactly the items most likely to change.
A Simple RFQ Checklist Before You Send
- Door profile drawing attached, with frame radius and centre panel type stated.
- Substrate, finish system and sheen named for every door in the package.
- Carcass material, board thickness and interior finish specified.
- Hinges, runners and handles listed as separate priced lines.
- Dimensioned plan plus appliance schedule attached.
- Worktop material and thickness declared.
- Corner and special units called out by mechanism.
- Lighting positions marked on the drawings.
- Quantities, project type and delivery terms stated in writing.
- A physical finished sample of the door required before order confirmation.
What You Should Receive Back
A usable quotation on white shaker cabinetry arrives with a priced elevation drawing, a unit-by-unit schedule, the hardware list, the finish specification, and freight shown separately. If any of those are missing, the quote is incomplete — ask for it in writing before you treat the number as comparable.
SANTERSON has manufactured furniture and building materials since 2008 and supplies cabinetry for villa, apartment and hotel projects worldwide. Send us a plan, an appliance schedule and the finish you want, and we will return a quotation itemised to the unit, so it can be compared line by line with anything else on your desk.
Send us your kitchen drawings
Share your dimensioned plan, appliance list and preferred white finish. We will quote the shaker cabinetry as a complete, itemised package — doors, carcasses, hardware, packaging and freight priced separately.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com