A matte lacquer wall panel only looks finished once the sheen, substrate, edge treatment and site conditions have been agreed in writing. Below is the checklist our project team uses with architects, contractors and villa owners who are specifying Santerson Matte Lacquer Panels for residential wall systems, so that what arrives on site matches what was drawn.

Start With the Panel Schedule, Not the Sample Card

Matte lacquer panels in our paneling systems range are made to measure: finish, layout and dimensions are set per project rather than chosen from a fixed catalogue size. That flexibility is the advantage and the risk. A small sample card tells you what a colour looks like on your desk; it does not tell you how joints will read across a full wall or how the panel meets the ceiling line. Before production begins, we ask buyers to confirm a panel schedule that records, for every wall:

  • Finished panel size and setting-out drawing, with joint widths and their positions relative to doors, reveals and fixed furniture.
  • Panel thickness and substrate for each location, since the same finish can be applied over different board types depending on the fixing method.
  • Edge and trim detail: square edge, shadow gap, or a concealed trims detail that matches our Integrated Door & Paneling work, where a door is hidden in the same panel face.
  • Total quantity plus spares for future maintenance, and how spare panels will be matched to the original batch.

Sheen, Colour and Texture Are Three Separate Decisions

"Matte" is a family of appearances, not one appearance. When we prepare a quotation we confirm each of these separately, because two panels can share a colour name and still look different on the wall:

Detail to confirmWhat to specify in writing
Sheen bandThe agreed sheen level for the batch, and the physical reference panel it was approved against. Matte surfaces scatter light differently across a large wall than across a small card.
Colour basisReference code or approved physical sample, plus whether the colour is solid, metallic or wood-effect, since these build up differently in lacquer layers.
Surface feelSmooth matte or a textured finish. Where a tactile surface is wanted, our Santerson Textured Panels are the closer comparison point.
Application methodNumber of lacquer coats and curing process used for the batch, so panels made in separate production runs can be compared fairly.

We recommend approving a full-size panel, not an offcut, before mass production starts. It is the only reliable way to judge how the finish behaves under your own lighting.

Confirm the Substrate and Where the Panel Will Sit

Finish performance depends on what sits beneath it. For each wall, we ask buyers to state the use of the room and the fixing background, then we match the board and construction accordingly. Points that regularly cause problems when they are left open:

  • Moisture and humidity. Rooms such as laundries, powder rooms and pool-adjacent corridors need a substrate and edge sealing chosen for those conditions. Tell us the room type; do not assume one board suits the whole house.
  • Impact areas. Hallways, stairwells and children's rooms put different demands on an edge than a bedroom feature wall.
  • Background flatness. Made-to-measure panels bridge small deviations, but a badly prepared wall still shows through at the joints. Agree who prepares the wall and to what tolerance before delivery.
  • Integration with services. Switches, sockets, air diffusers, curtain recesses and lighting must appear on the setting-out drawing so cut-outs are machined in the factory rather than cut on site.

Decide How Joints, Corners and Transitions Are Handled

The visible quality of a panelled wall is mostly about its joints. We ask buyers to sign off these details on the drawing:

  • Inside and outside corner treatment: mitred, radiused, or a trims detail.
  • Transition to floor, ceiling, skirting and adjoining materials such as stone or joinery. Where a wall mixes finishes, our Santerson Stone & Marble Panels are often paired with matte lacquer, and the two thicknesses have to be reconciled at the junction.
  • Expansion allowance along long runs, and where the movement joint is placed so it falls in a shadow line rather than mid-field.
  • Whether concealed doors sit in the same plane as the panels, which fixes both the door leaf construction and the gap dimension early.

Fixing Method and Site Sequence

Tell us how the panels are intended to be fixed — adhesive, batten system or a mechanical clip detail — because that choice changes panel thickness, edge profile and the setting-out grid. Then agree the site sequence: first fix and services signed off, background prepared, panels delivered into a clean dry space, and a defined order of installation so that trades working after the panels do not damage them.

Our installation and after-sales support covers on-site guidance, inspection with snag lists, spare parts and maintenance advice. Availability, warranty terms and response arrangements are confirmed for each project rather than assumed.

Documentation to Receive Before Shipment

Ask for these items in the pre-shipment pack, and check them against your own drawing before goods leave the factory:

  • Approved full-size panel reference, signed and dated, with batch number.
  • Final setting-out drawings showing dimensions, joint positions and cut-outs.
  • Packing list keyed to room or wall codes, so panels arrive labelled for the sequence of installation.
  • Fixing specification and approved adhesive or batten system.
  • Cleaning and maintenance instruction for the matte lacquer surface.

A Practical Rule for Closing These Details

If a detail is not on an approved drawing or in the signed panel schedule, it is still open. Close sheen, substrate, edge profile and joint dimensions before production starts; change orders after that point cost both time and matched batches.

How Our Team Supports the Specification

As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we handle matte lacquer panels together with the joinery, doors and other wall finishes in the same package, which keeps thicknesses, colours and joints consistent across trades. Under our Turnkey Interior Project Solutions service, the workflow runs through consultation, design and planning, production, logistics, installation and after-sales, with door-to-door delivery arranged by sea, air or rail.

Send us your wall elevations, room schedule and target completion date. We will return a panel schedule with finish options, substrate recommendations for each location, and a quotation you can compare line by line against your drawing.

Confirming your finish details? Share the setting-out drawings and room schedule for your project and our team will prepare a panel schedule and quotation for Santerson Matte Lacquer Panels, with full-size sample approval before production begins.

Materials, substrate options, dimensions, finish specifications, installation scope and after-sales terms are confirmed per project. The details in this article describe our standard specification process, not fixed technical guarantees.