A swim spa of this size is not a catalogue item you simply drop into a purchase order. Before we put the Outdoor Swim Spa WS-PC06ST-L into production, both sides need to agree on the shell that arrives, the equipment inside it and the services that carry it from our workshop in Foshan to your site. The checklist below is what we confirm on every project so the unit fits the slab, the power supply and the handover date.
Start With the Shell: Footprint, Water Depth and Site Access
The catalogue entry for this model lists a shell of 6390 × 2400 × 1470 mm. Treat those figures as the starting point for three separate site checks rather than one number to copy into a drawing.
- Structural opening and slab. Confirm whether the spa sits on a prepared slab, a raised deck or a recessed pit, and have your engineer verify the load path for a full shell. The finished height of 1470 mm also sets parapet, guardrail and step heights around it.
- Swim channel versus relaxation end. A shell of this external length is shared between the swim training station and the jetted seating area, so the continuous swim run is shorter than the model name implies. If lap distance is the priority, ask us to compare the internal layout against the longer configurations in our swimming pools and swim spas range before you commit.
- Delivery route and crane. A one-piece acrylic shell of this size needs a clear path from the truck to the final position. Confirm gate widths, overhead cables, tree cover and whether a crane or hiab is required on site — and who books it.
Lock Down the Equipment List in Writing
The specifications published for WS-PC06ST-L show one control system, one swim training system, one filter pump, six water jets, four LED lights and ozone sanitation, with a total power figure of 6.55 kW. Two things follow from that list, and both belong in your confirmation document.
First, the captured specification sheet for this model does not state a separate water pump. Do not assume one is included or excluded — we confirm it against the configuration you select, because the swim training unit and the jet circuit draw different supply requirements.
Second, 6.55 kW is the baseline for the standard build. Options such as a heat pump, UV sterilisation, upgraded filtration, additional insulation or steps change both the equipment list and the electrical load. We issue the revised specification with your selected options so your electrician sizes the circuit, protection device and any isolator from real numbers instead of a catalogue average.
| Item to confirm | Why it matters before production |
| Shell dimensions and finish colour | Sets the slab, deck edge and surrounding finishes; exterior cladding is fixed once the shell is finished. |
| Included pumps and swim training unit | Determines jet performance, swim current and the electrical load your site must supply. |
| Heat pump and insulation package | Drives running cost and how quickly the water reaches the temperature you specify. |
| Control system placement | The control panel needs a dry, accessible position with cable runs agreed in advance. |
| Ozone and any UV sterilisation | Affects the maintenance routine your facilities team will follow after handover. |
| Steps, seating and access details | Changes entry height and must match local barrier requirements at your site. |
Confirm Power, Water and Drainage on Your Side
The most common cause of delay is not the factory — it is a site that cannot yet supply what the equipment needs. Before we schedule production, we ask for the supply details: available phase and voltage, the distance from the main switchboard to the spa, the earthing arrangement, and where the drain and overflow will discharge. We also need the water source for filling and, for hotels and villas with several wet services, how the spa circuit is separated from them.
These details decide cable sizes and whether a local distribution box is required. Send them with your purchase order and the engineering coordination happens in parallel with manufacturing rather than after it.
Agree How Much Customisation You Actually Need
If the standard shell does not suit the space, our Custom & OEM Service covers bespoke sizing and configuration, and the range also includes customised-shape outdoor spas for terraces and gardens where a rectangular shell will not sit. What we need from you is the constraint: the maximum length or width, whether the unit must be split for access, and the finishes that have to match adjacent work.
For projects combining several product groups — spa, outdoor furniture, bathroom ceramics, lighting, cabinetry — it is worth deciding the whole package at once. Our Turnkey Solutions team coordinates design, production and delivery across those categories, so one specification round covers everything rather than several separate orders arriving on different dates.
Fix the Logistics and Handover Sequence
A swim spa arrives as project cargo, not a parcel. Our Logistics & Door-to-Door Delivery service handles freight booking, packaging and container loading, export paperwork and delivery to the site address, with shipment tracking through to arrival. What you confirm in return is the delivery window, the unloading arrangement and who prepares the base before the truck arrives.
Then agree the commissioning sequence. Our Installation & After-sales Support covers on-site installation, inspection and snag lists, spare parts and maintenance guidance. For a swim spa, the practical items are the same every time: who sets and levels the shell, who connects power and water, who runs the jets and controls for the first fill, and what is inspected before you sign off.
A simple rule of thumb. If your confirmation sheet answers six questions — exact dimensions and finish, complete equipment list with options, electrical and drainage supply, customisation scope, delivery route and unloading, commissioning and sign-off — production can start without a change order later. If any one of them is still open, it is cheaper to resolve it on paper than on site.
Before You Sign the Production Order
Specification figures on this page are transcribed from the product listing for WS-PC06ST-L and apply to the standard configuration. Optional equipment, electrical load and dimensions for a customised shell are confirmed in your project documents, and local barrier, electrical and plumbing requirements are the responsibility of your designer and installer at the site address. Send us the drawings and supply details with your enquiry and we will return a specification sheet matched to them.
Send us your spa layout
Share the site dimensions, available power supply and the options you want, and we will confirm the configuration for WS-PC06ST-L or a closer fit from the swim spa range.