A swim spa quote is easy to compare on one number and hard to compare on everything else. If you are sourcing an Outdoor Swim Spa WS-S06 for a villa terrace, a resort garden or a private residence project, the quoted price tells you very little until the line items behind it are written down. The checklist below follows the order we suggest using when you review a supplier quotation, so two offers for the same model can actually be put side by side.

1. Confirm the exact model code and configuration variant

Model codes in this product family carry suffixes, and the suffix changes what you receive. Before anything else, check that the quotation names the base unit as WS-S06 rather than a related variant from the same series, and that the model code appears on the drawing, the packing list and the invoice in the same form. A quote that says only "swim spa, 5.8 m" is not comparable with one that states the full model designation.

2. Read the dimensions as shell size plus site tolerance

The catalogue entry for this model lists overall dimensions of 5820 × 2220 × 1110 mm. Treat those figures as the manufactured shell, and then check what the quote says about working clearance, access width to the site, and how the unit is split for transport. Ask the supplier to confirm the delivered package sizes against your doorway, gate and crane or forklift access. A dimension that fits on a terrace plan can still fail at the property boundary.

3. Match pump, jet and lighting counts line by line

The specification block shown on the product page records two water pumps, one filter pump, 56 jets in total, two LED lights together with 18 small LED lights, and a control system counted as one set. It also lists water jets, LED lighting, ozone, a waterfall and four water columns among the displayed features. Use those entries as your comparison sheet: count each item in both quotations, and ask any supplier whose numbers differ to say plainly whether their lower price comes from fewer jets, a different pump arrangement or omitted lighting.

One point deserves particular care. The captured specification for this model does not list a swim training system. If your project brief assumes lap swimming against a jet or current, raise it in writing and have the supplier confirm what is included, what is optional and what is not offered for this configuration. Do not let an assumption travel from the marketing page into the purchase order.

ItemWhat the catalogue showsWhat to ask the supplier
Dimensions5820 × 2220 × 1110 mmDelivered package sizes and site access route
Water pump2 pcsDuty, brand and whether spares are quoted
Filter pump1 pcFiltration cycle and media type
Jets56 pcs in totalJet layout drawing and seat-by-seat placement
LED lighting2 lights plus 18 small LED lightsColour options and control grouping
Total power6.35 kWSupply voltage, phase and circuit protection
Control system1 setLocation of the control panel and access for service

4. Separate standard equipment from priced options

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should appear in the quotation as its own line with a price, not buried inside a lump sum. Insulation and a heat pump are the two items most often dropped to make a headline price look competitive, and both change running cost through the year. Steps and entry arrangement also affect how an older guest or a child actually uses the spa, which matters on hospitality projects.

5. Put the electrical requirement in writing early

A total power figure of 6.35 kW is only useful once voltage, phase and protection are agreed. Ask the supplier to state the required supply on the quotation, then send that figure to your electrician before the slab, conduit and isolator positions are fixed. Where a local contractor will handle connection, confirm in writing which side of the isolator the supplier is responsible for. This single clarification removes most of the cost surprises reported on outdoor water features.

6. Check what arrives with the spa

Ask for a packing list in the quotation itself. It should show the control system, pumps, filtration components, any quoted options, spares and consumables such as filter media. If you are managing several villas or a resort phase, spare pumps and jet components held on site reduce downtime far more cheaply than an emergency shipment later.

7. Freight, duties and delivery scope

Compare quotations on the same delivery term. One supplier may quote a port price while another quotes door-to-door, and the difference is not always freight: it can be inland haulage, offloading equipment, customs paperwork or insurance. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, shipment tracking and the paperwork side of import, but duties, local permits and site preparation remain with the buyer in most arrangements. Ask each supplier which of these they handle and which they do not.

8. Installation, handover and after-sales terms

The quotation should say who sets the unit, who levels and connects it, and what happens at handover. Look for a defined inspection or snag list, warranty scope with named exclusions, and how replacement components are supplied. Our installation and after-sales support page describes on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance; ask any supplier for the equivalent detail in writing before you compare prices.

9. When a different shape or size is the better answer

Not every site suits a 5.8 m rectangular shell. Where the terrace is narrow, irregular or set into a landscape scheme, a Customizable Shape Outdoor Spa with square, round, oval and curved options may fit better than a standard catalogue unit, and it is worth asking for both prices. Where the brief calls for an extended swimming channel alongside a hydrotherapy seating area, compare against a Long Outdoor Swim Spa with Hydrotherapy and Relaxation Pool instead of forcing this model into a role it was not configured for. A supplier who offers both answers is usually the easier one to work with.

Figures quoted in this article are transcribed from the WS-S06 catalogue entry on our product page. Equipment and options vary by configuration and production batch, so confirm every number against the current quotation before you order.

Send us the model code, your site dimensions and the options you want priced, and we will return a quotation with each item on its own line so it can be compared directly with any other offer. More of this product family is listed under Swimming Pools and Swim Spas, and you can reach the team through our contact page.