A ten-metre swim spa is not an impulse purchase. Before a purchase order is raised for the Outdoor Swim Spa WS-S10-T, the procurement team, the designer and the site contractor all need the same information on paper: what actually arrives in the crates, what the site has to provide before those crates land, and who signs off on each item. Below is the review list we would work through with a buyer, ordered by the point in the programme at which each risk becomes expensive to fix.

Scope first, price second. On a configurable product such as this one, most disputes trace back to a line item that was never written down - an omitted pump, an assumption about who supplies the steps, or an electrical arrangement nobody confirmed until the cable was already in the ground.

1. Confirm which configuration you are actually buying

The WS-S10-T sits inside a configurable swim and hydrotherapy range rather than being a fixed specification, and the catalogue lists it alongside close variants such as the Outdoor Swim Spa WS-S10. The difference between those two pages matters commercially: the -T model carries a swim training system, and that single item changes the pump arrangement, the control panel and how the shell can be used for lap swimming. Ask for a written configuration sheet with every included item named, and compare it line by line against the quotation you intend to sign.

Baseline items shown in the catalogue record

ModelWS-S10-T
Catalogue shell dimensions10000 × 2200 × 1420 mm (L × W × H)
Control system1 set
Swim training system1 set
Water pump2 pcs
Filter pump1 pc
Jet total76 pcs
LED lighting1 fitting plus 40 small LED lights
Total power (catalogue figure)7.65 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Treat the figures above as catalogue data to be verified against your own quotation, not as a purchase specification. Where a number drives a design decision - the 7.65 kW load in particular - get the confirmed value for the exact build you are ordering before any electrical designer sizes a circuit.

2. Site and civil risks: the ten-metre footprint

A 10 m × 2.2 m shell with a 1,420 mm water depth is a structural and access question long before it is a plumbing question. Work these through with your engineer and builder:

  • Support structure. Confirm the load path for a fully filled spa on your chosen setting - slab, deck frame or sunken pit - and get that detail signed by a local structural engineer. Catalogue dimensions are external shell dimensions; they do not tell you what your substructure must do.
  • Working clearance. Measure the delivery route as well as the final position: gate widths, turning radii, overhead lines, and whether a crane or a long-arm lift is needed to place the shell.
  • Drainage and overflow. Agree where backwash, drainage and any overflow discharge to, and confirm that with the site plumber before the slab is poured.
  • Plant access for life. Pumps, filters and the control system need ongoing access. A design that buries the equipment bay behind a finished wall will cost you dearly at the first service visit.

3. Electrical and services risk

The spa is shown with a 7.65 kW total power figure, two water pumps, a filter pump, a control system and an ozone sanitising system. Every one of those needs a supply, protection and bonding arrangement designed by a local electrical contractor to the rules that apply at the site. The specific risks we see on swim spa projects:

  • Circuit sizing based on a catalogue figure rather than the confirmed load of the ordered configuration.
  • No provision for a heat pump or UV sterilisation option that is added later, after the cable has been run.
  • Control system placement left undecided until handover, leaving no weather-protected, accessible location.
  • Bonding and equipotential provisions around the shell not coordinated with the surrounding paving or decking.

Ask for the confirmed electrical requirements of your configuration in writing - supply voltage, phase, circuit count, protective device expectations and control interlocks - and hand that sheet to your electrical designer rather than passing on a brochure number.

4. Options and accessories: write them into the order or accept their absence

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each is a separate commercial decision with a different lead-time consequence:

  • Heat pump and insulation govern running comfort in cooler months. Specify them at order stage; retrofitting insulation around an installed shell is awkward and rarely tidy.
  • Sand filtration versus the standard filter pump changes both the plant footprint and the maintenance routine for whoever looks after the spa day to day.
  • Steps and access affect the deck level. If steps are not supplied, the site contractor has to design and build an equivalent - usually at a higher cost than the accessory.
  • UV sterilisation and ozone overlap in function. Decide which sanitising approach the operator wants rather than buying both by default.

Availability and compatibility of options vary by model, so confirm each one against your configuration before the order is placed. Anything not listed on the signed specification should be assumed excluded.

5. Logistics and handover risk

Oversized water features behave differently in transit from ordinary furniture, and the practical risks are worth pricing properly. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site - but the Incoterms, duties, insurance cover and delivery scope for your address should be agreed case by case rather than assumed. Confirm who is the importer of record, who books the crane, and what "delivered" means at your gate.

Then agree the receiving protocol before dispatch: a joint inspection against the configuration sheet while the packaging is still intact, with any shortage or damage photographed on the day. That single step resolves most claims that would otherwise be argued about weeks later.

6. After-sales and spares

A swim spa has seventy-six jets, two pumps, a filter pump, a control system and lighting - all of which are service items for the life of the asset. Before ordering, ask what happens when something fails: which parts are held as spares, how replacements are shipped, what the warranty covers and what it excludes, and who performs installation and commissioning on site. Our installation and after-sales support page describes on-site installation, inspection and snagging, warranty coverage, spare parts and ongoing maintenance; the applicable terms for your project should be confirmed in writing for your configuration and delivery location.

A pre-order checklist for the procurement file

  • Signed configuration sheet naming every included item, including whether the swim training system is supplied.
  • Confirmed electrical load and supply requirements for that exact build, issued to the electrical designer.
  • Structural sign-off for the support slab or deck, based on a filled-shell load.
  • Written list of options purchased and, equally important, options deliberately excluded.
  • Agreed Incoterms, importer of record, insurance and delivery point at site.
  • Named installation and commissioning party, with warranty terms and spare-parts arrangements in writing.
  • Ancillary items confirmed: steps, fencing or barrier requirements, paving interface, plant access.
If you are specifying a swim spa as part of a wider villa or resort package, it is usually simpler to coordinate the shell with the surrounding outdoor furniture, paving and interior fit-out from the outset. Our turnkey interior project solutions cover design, production, logistics and installation as one programme, which removes most of the interface risk described above.

Next step

Send us the site drawing, the intended setting for the shell and the options you are considering, and we will return a configuration sheet with confirmed equipment and electrical requirements for that build - so your team signs off on one document instead of three.

For full product details see Swimming Pools and Swim Spas, or contact our project team to start a configuration review.