A floating TV unit looks simple on a mood board and complicated on site. The cabinet has to carry a television, hide equipment, sit level on a finished wall and still read as a clean architectural line. Because the piece is fixed to the wall and usually built to fit one specific opening, a purchase decision cannot rest on a catalogue photograph. This guide sets out what buyers, designers and builders should settle before a floating TV unit is quoted, so the order arrives with dimensions, finishes and support details already agreed.
Why a floating TV unit is a built-in decision, not a loose furniture purchase
Santerson lists floating TV units within its built-in furniture range. That category matters more than the style name. Built-in work is made to measure for a room, coordinated with wall finishes and installed once, so changes after production start are expensive or impossible.
The catalogue entry for these units describes three configurable points: made-to-measure sizing, material and finish options, and a layout tailored to the project. Those three lines are where the buying decision is actually won or lost. Everything else — hardware brand, edge detail, lighting — hangs off them.
Settle the wall before you set the cabinet
Wall support is the first technical question, and it is rarely visible in a rendering. A floating unit transfers its own weight plus the television, speakers and any equipment stored inside into the wall behind the finish. Before drawings are issued, confirm with the builder or site engineer:
- the wall construction — masonry, stud partition, timber frame or a decorative panel build;
- where noggings, blocking or a steel backing frame will be added, and by whom;
- the finished wall line after plasterboard, panelling or stone, so the cabinet depth is measured to the true face;
- the position of sockets, TV outlet boxes, data points and any existing conduit.
Santerson's product pages for these configurable systems state that dimensions, mounting, hardware and electrical details should be confirmed per project. Treat that as a working instruction: the fixing method is part of the order, not an assumption left to the installer on the day.
Choose the layout from the equipment list, not from a picture
Write down what has to live in and around the unit: television size and its mounting pattern, soundbar, console, set-top box, games consoles, router, speakers, and anything with cables that must be reachable for servicing. Open shelving needs cable routes and ventilation; closed compartments need access for a remote signal or an infrared-friendly front.
The same collection includes close relatives worth comparing at the same time, because the decision is about the wall as a whole rather than one cabinet:
| Option | Where it works | What to confirm |
|---|---|---|
| Floating TV Units | Living rooms and bedrooms where a clear floor line is wanted, and where wall cleaning and under-floor heating grilles stay unobstructed | Wall support, finished wall line, cable drop position |
| Freestanding TV Cabinets | Rented properties, rooms with light stud partitions, or layouts that may move later | Floor level, door and skirting interference, tip restraint |
| Wall Mounted Media Walls | Feature walls that need to absorb the television and storage in one composition | Full wall build-up, panel joints, access to service boxes |
| Integrated LED Media Units | Display shelving and niches lit from within the carcass | Driver location, dimming control, replacement access, circuit details |
| Integrated Media Storage | Rooms where media has to disappear into a general storage wall | Door swing and clearance, ventilation for closed equipment |
Comparing these as one family prevents the common regret of ordering a floating cabinet and then discovering the wall needs a full panel build, or that equipment cannot be reached without removing a door.
Specify finishes against the room, not the sample card alone
A floating unit reads as a horizontal band across a large wall, so grain direction, sheen and edge profile are visible from across the room. Santerson's built-in ranges are offered with material and finish choices, and the same surfaces often appear in wardrobes, media walls and joinery elsewhere in the property. Where a project repeats a decor, ask for the finish to be quoted consistently across those items so the bedroom and living-room cabinetry match.
- Order a physical sample and view it in the room's own light at different times of day before signing off.
- Decide the edge treatment — square, eased or mitred — since this is what makes a carcass look like joinery rather than flat-pack.
- Agree how visible hardware works: push-open, handleless groove or a specified hinge and runner brand.
- Note the surfaces that will be touched daily, such as shelf fronts and drawer faces, and choose a finish suited to that wear.
What to have ready when you request a quotation
A made-to-measure enquiry moves faster when the following is supplied in one pack. Santerson's design and project service covers space planning, drawings and production coordination, so a documented brief turns into a workable drawing rather than another round of questions.
- A dimensioned wall elevation with the finished floor and ceiling levels, plus the position of the TV centre line.
- The equipment list with each item's dimensions, weight and ventilation needs.
- Sockets, data points and service-box locations marked on the drawing.
- Wall construction details and the agreed support or backing method.
- Two or three finish references, and any matching cabinetry already specified in the property.
- The room's photographs, including skirting, cornice and adjacent openings.
Reading a quotation properly
Before comparing prices, check that every quote covers the same scope. A low figure often excludes what makes the unit work on site.
- Overall dimensions stated as width, height and depth, with the depth measured to the finished face of the wall.
- Carcase and front material, finish code and edge treatment written out, not just a colour name.
- Hardware schedule: hinges, runners, fixings and any specified brand or model.
- Whether lighting, drivers, control gear and cable are included, and where the driver is located for access.
- Packaging, delivery address and how the units are handed over on site.
- What the supplier needs from the builder, and by when — this line protects the programme more than any other.
Fitting the unit into a wider project
Media walls rarely stand alone in a villa or apartment fit-out. When cabinetry, wall panelling, doors and flooring come from one supplier, finishes and reveal details can be coordinated on a single drawing set, which reduces the risk of mismatched decors between trades. Santerson works as a one-stop furniture and building materials supplier, covering design coordination, production and door-to-door delivery for residential and hospitality projects, and buyers sourcing for Australian developments can review the published project cases before shortlisting.
For a single floating cabinet, that breadth is optional. For a living room where the media wall, sideboard, wardrobes and doors all repeat one woodgrain, coordinating them in one order is usually simpler than reconciling three suppliers' interpretations of "oak effect".
A short decision checklist
- Wall build-up and support method agreed with the site team, in writing.
- Finished wall line and floor level confirmed before dimensions are locked.
- Equipment list complete, with ventilation and servicing access resolved.
- Cable routes, sockets and driver location shown on the drawing.
- Finish approved from a physical sample in site conditions.
- Hardware schedule and edge treatment stated in the quotation.
- Delivery date checked against plastering, painting and flooring dates.
Send Santerson your wall elevation, equipment list and finish references, and the team can turn them into a specification for your floating TV unit or full media wall. Contact details are on the contact page.