A laundry area in a residential project looks like a small job on the drawing until the quotation comes back. The cabinet has to fit an appliance that has not been delivered yet, survive humidity and daily use, and still line up with the joinery finishes used elsewhere in the dwelling. That is why a Laundry & Storage Combo should be shortlisted like any other built-in item, and why the manufacturer you choose matters more than the picture in the brochure. The steps below are what a buyer or contractor should confirm before comparing quotations.
1. Confirm the manufacturer actually builds made-to-measure laundry joinery
Many suppliers list a laundry unit as a standard catalogue size. For an apartment or villa bathroom project, that is usually the wrong starting point. Santerson's Laundry Integration range — the Laundry & Storage Combo, Stacked Laundry Units, Compact Laundry Solutions and WasherDryer Cabinets — is described as made-to-measure, with material and finish options and a layout tailored to the project. Treat that as the minimum brief you put in writing:
- Dimensions taken from the finished site condition, not the architectural drawing alone.
- A stated appliance envelope — width, depth and height of the washer, dryer or stacked pair being installed.
- The finish family selected for the rest of the dwelling, so doors, panels and worktops match existing cabinetry.
Ask each manufacturer to return a shop drawing that shows these three items. If a supplier cannot produce a dimensioned drawing before quoting, the price you receive is not comparable with anyone else's.
2. Check what is included in the quotation
Shortlisting only works when every quote covers the same scope. For a laundry fit-out, request the following line items from each manufacturer and mark them as included, optional or excluded:
| Item to confirm | Why it decides the shortlist |
|---|---|
| Carcass, doors and worktop specification | Determines whether the unit can be matched to wardrobes and vanities supplied for the same project. |
| Aperture size tolerance | Appliance models change between order and delivery; the opening must accept the model actually installed. |
| Storage configuration | Hanging, shelving, drawer and hamper provisions are specified per unit — for dedicated options see Pull Out Laundry Hampers and Multi Function Tall Cabinets. |
| Service clearances | Water inlet, waste, power points and ventilation need to appear on the drawing before production starts. |
| Packaging and delivery terms | Built-in joinery damaged in transit cannot be replaced inside a normal project programme. |
3. Test the manufacturer's coordination ability, not just the price
Laundry joinery sits with wet-area trades, so the supplier who answers technical questions fastest usually costs less overall. During shortlisting, send each candidate the same three questions and compare the quality of the replies:
- Which finish samples can you send for this unit, and how long does that take?
- What drawing do you need from us before you can confirm the aperture for a stacked appliance set?
- Who signs off the final production drawing, and what happens if the appliance model changes after sign-off?
A manufacturer working under a defined workflow — brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up — will answer these in one consistent pack. Santerson describes that sequence on its interior design services page, along with drawing and production coordination and on-site guidance, which is the practical support a laundry area needs when it is one item among many in a whole-house package.
4. Prefer suppliers who can supply the surrounding fit-out as well
A laundry cupboard rarely stands alone. In the same dwelling you are also buying vanities, mirror cabinets, tall storage and wardrobes, and every one of those has to share a finish family and a door profile. Buying these from separate sources is where colour and grain mismatches appear. Santerson positions itself as a one-stop furniture and building materials supplier for residential, villa and hospitality projects, so the laundry unit, the bathroom joinery and the built-in storage can be produced under one specification and one shipment. The company has operated since 2008 as a China-based manufacturer with custom and OEM service, which matters when a project needs a bespoke door profile rather than a catalogue item.
5. Confirm logistics and installation before you sign
For overseas projects the shortlist should be filtered on delivery reality as well as manufacturing capability. Ask each manufacturer to state in writing how the units are packed and loaded, who prepares customs paperwork, and what happens on site after delivery. Santerson lists freight forwarding by sea, air and rail with door-to-door delivery, plus installation and after-sales support as separate services; the exact Incoterms, transit window and installation arrangement should still be confirmed for your port and site conditions rather than assumed from marketing copy.
Shortlisting checklist — five questions to send with every enquiry
- Can you build this unit to the site-measured dimension, and what tolerance do you hold?
- Which material and finish options are available for this laundry unit, and can samples be sent?
- Will you issue a production drawing for our sign-off before manufacturing?
- What is excluded from the quoted price — worktop, plinth, service cut-outs, hardware?
- Who delivers, who installs, and what is covered if a panel arrives damaged?
Putting it together
Shortlist on three things: made-to-measure capability, drawing discipline before production, and whether the same manufacturer can hold the finish consistent across the laundry, bathroom and storage items in the project. Price comparison is the last step, and it only becomes meaningful once every quotation carries the same drawings, tolerances and exclusions.
Send your dimensions, appliance model and finish reference to SANTERSON for a made-to-measure proposal on the Laundry & Storage Combo and the rest of the built-in joinery.
Product dimensions, finishes and specifications are confirmed project by project before production.