A ten-metre swim spa is not a piece of furniture you can drop onto a site plan at the end of a project. It carries water, power, drainage, structure and access requirements that have to be resolved while the drawings are still moving. The Outdoor Swim Spa WS-S10-T sits at the long end of our configurable swim and hydrotherapy range, and this guide sets out what design teams, contractors and villa owners should settle with us, and on paper, before the first drawing is signed off.
Start With the Catalog Envelope, Not the Picture
The published catalogue entry for WS-S10-T lists a shell of 10000 x 2200 x 1420 mm. That single line drives three separate drawing sets, and each one interprets it differently.
- Architectural: the 10 m length and 2.2 m width set the footprint of the deck opening, the position of the coping line, and how the surrounding poolside furniture, loungers and shade structures are laid out around it.
- Structural: 1420 mm is the overall shell depth. Whether that depth is taken as an in-ground recess, a semi-recessed installation or a fully above-ground installation on a plinth changes the slab, the perimeter beams and the retaining detail, and it must be drawn consistently across sections.
- Services: the plant is not free-standing decoration. The catalogue shows 2 water pumps and 1 filter pump on this model, which means dedicated circuits, protected containment near the shell, and a route for maintenance staff to reach each pump without crossing wet finishes.
A common failure we see in tender packages is a swim spa drawn as a generic "pool insert" with no plant room, no access hatch and no clear dimension chain from the finished deck level. Once the shell is on site, those omissions become variations.
What the Catalogue Shows for WS-S10-T
| Item shown in catalogue | Catalogue entry | Drawing implication |
|---|---|---|
| Model | WS-S10-T | Fix the model code on every sheet; sibling models share a footprint but differ in equipment. |
| Catalog dimensions | 10000 x 2200 x 1420 mm | Deck opening, coping set-out, plinth or recess detail. |
| Swim training system | 1 set | Defines the swim-current end of the shell and the clear swimming length available to users. |
| Jet total | 76 pcs | Seating and lounge positions relative to jet banks; affects user layout and handrail placement. |
| Water pump / filter pump | 2 pcs / 1 pc | Circuit count, equipment location, ventilation and access clearance. |
| Control system | 1 set | Position of the control interface relative to wet zones and to the owner's daily route. |
| LED lighting | 1 light; 40 small LED lights | Low-voltage routing, driver location, and coordination with landscape lighting. |
| Total power | 7.65 kW | Load to be declared to the electrical engineer and matched to the local supply and protection arrangement. |
| Features shown | Water jets, LED lighting, Ozone, Swim training system | Sanitisation strategy on the mechanical sheet must agree with what is actually supplied. |
The Sibling Model Question: WS-S10 and WS-S10-T
WS-S10 and WS-S10-T share the same 10000 x 2200 x 1420 mm envelope, so on a plan view they look interchangeable. They are not. The -T variant is the one whose catalogue entry includes a swim training system of 1 set; the non-T record does not list that item. If the client's brief says "lap swimming at home", the model code has to appear correctly in three places: the equipment schedule, the electrical load schedule (the swim current is a significant part of the declared power), and the purchase order. A mismatch discovered after the concrete is poured is expensive to correct.
Site Requirements to Close Out Before Delivery
Access and crane path
A ten-metre acrylic shell cannot be manoeuvred through a typical terrace gateway. Confirm the delivery route, the lifting point and the final set-down path on the site plan, and check overhead obstruction (power lines, pergolas, tree canopy) against the crane or HIAB reach. Where access is tight, this is the point at which a smaller model or a different installation level becomes the cheaper decision.
Structure and drainage
For recessed installations, the perimeter structure has to be designed for a full shell and for maintenance access, not just for the wetted area. Provide a drainage route for the drain-down and for any overflow, and keep the drain away from neighbouring planting if the site uses irrigation on a timer.
Power
The catalogue figure of 7.65 kW total power is what you declare to the electrical engineer, but it is not the whole story. Supply arrangement, cable route, isolation location and protection all sit with the local contractor, and any additional option such as a heat pump changes the load materially. Confirm the final equipment list before circuits are drawn.
Envelope and finishes
Deck level, coping detail and the transition into engineered flooring or external paving should be detailed at the same time as the shell, so that thresholds, fall to drain and slip rating are decided once rather than twice.
How This Fits Our Project Workflow
SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. A swim spa rarely arrives alone on our shipments; it travels alongside outdoor furniture, cladding, bathroom fixtures, lighting and cabinetry from the same package. That is an advantage if it is coordinated early and a problem if it is not, because the swim spa has the longest lead dependency of the group.
In practice we work through our interior design services and turnkey project solutions: space planning and layout, product specification, production coordination, then freight by sea, air or rail with door-to-door delivery, followed by installation support and after-sales service. For a swim spa the design-coordination stage is where the value sits, matching the model code, dimension chain and equipment schedule to your drawings before production starts.
Where a standard catalogue shell does not suit the site geometry, our range also includes customised-shape outdoor spas for gardens, terraces and leisure areas, and our custom and OEM service covers bespoke material, finish and configuration choices. Custom work changes lead times and documentation, so it should be raised at concept stage rather than at tender.
Pre-order checklist for the design team
- Model code confirmed on equipment schedule, electrical schedule and purchase order (WS-S10 vs WS-S10-T).
- Dimension chain drawn from finished deck level to shell base, with coping detail.
- Equipment list confirmed in writing: pumps, jets, control, lighting, sanitisation, plus any options.
- Declared load agreed with the electrical engineer, including any heat pump or added pump.
- Delivery route, lifting plan and set-down path marked on the site plan.
- Drain-down route and maintenance access clearance shown on sections.
- Surrounding poolside furniture, shade and paving coordinated with the shell footprint.
Next Step
Send us the layout drawing or the site constraint you are working around (access width, finished deck level, available supply) and we will confirm which configuration of the ten-metre shell fits it, what the delivered equipment schedule contains, and how it should be shown on your drawings. Browse the wider swimming pools and swim spas range or contact our project team to start that coordination.