An integrated basin reads as a simple item on a drawing: one piece, no visible seam, easy to wipe down. In procurement it is the opposite. The bowl and the counter are a single deliverable, so every dimension, material and drainage decision has to be closed out before production starts. A brief that describes only the look of the unit invites change orders later; a brief that specifies the assembly lets the factory quote once and build once.

The notes below follow how our team works with buyers on residential bathroom fit-outs, and they map onto the information we need for the Integrated Basin in the Countertops & Basins range.

What an integrated basin is, and why that changes the brief

In this assembly the bowl and the counter are formed from one piece of material, or machined so the junction is continuous. There is no separate rim to caulk and no lip where grout collects, which is why these units hold up well in bathrooms used several times a day.

That same construction moves work forward in the schedule. A Santerson Undermount Basin can be paired with a counter trimmed on site, and a vessel basin only needs an agreed outlet position. An integrated unit cannot be adjusted after the block has been machined: bowl position, overflow provision, tap deck, front edge profile, splashback return and cut-outs for the trap and wall fixings are all set at the factory. If any of them is unknown when production begins, the item either ships wrong or waits.

For that reason we handle integrated basins as a specified made-to-measure item rather than a catalogue purchase, in the same way we approach a Santerson Integrated Countertop Vanity, where counter, bowl and carcass are coordinated as one package.

The seven items the brief must state

Write these into the schedule for each bathroom type, room by room. Anything left as "to be confirmed on site" returns later as a variation.

Item to specifyWhat good looks like in the brief
Unit and wall dimensionsOverall length, depth, finished height above the floor datum, thickness of the visible front edge, and whether a splashback return or side upstand is required. State which dimension is fixed by the room and which can be adjusted.
Bowl position and countCentre line of each bowl measured from a fixed wall, plus clearance to the side wall so users are not crowded. Note whether one or two bowls are needed, as with a Santerson Double Basin Countertop.
Material and finishMaterial family, colour or grain reference, and surface texture. Where stone or marble is called for, confirm the slab reference you want matched against the Santerson Stone & Marble Surfaces used elsewhere in the same bathroom.
Tapware deckNumber of tap holes, hole spacing, whether a single-lever or wall-mounted mixer is used, and where the spout lands relative to the bowl. Wall-mounted mixers change the fixing and tail requirements behind the counter.
DrainageTrap type and outlet direction, waste position relative to the wall, overflow provision in the bowl, and the finished floor level so the plumber can check falls before installation.
Support and accessHow the unit is carried: vanity carcass below, steel framing, or wall brackets. State where inspection access to the waste is needed, and which services must be kept clear of the cut-out.
Quantities by room typeCount per bathroom or powder room, plus spares for the maintenance store on larger residential work. Group identical units so one machining file covers several rooms.

Tying the basin to the rest of the bathroom package

Integrated basins rarely fail on their own; they clash with something beside them. Before you issue the brief, settle the items that share the same wall and the same wet zone:

  • Mirror cabinet and lighting. Cabinet depth and the swing of its door must clear the splashback, and vanity lights should sit above the mirror rather than behind the user's head.
  • Vanity or storage below. A Santerson Floating Vanity or a closed carcass changes both the support detail and where the waste exits.
  • Toilet and shower zones. Set clearances for use and cleaning, and confirm the counter edge does not block a door swing or a shower screen track.
  • Wall finishes. Record the build-up of tiling or paneling on the back wall, because it moves the finished face the counter has to meet.
Practical rule: where tiling and joinery are carried out by separate trades, freeze the counter dimensions only after the set-out drawing has been checked against the tile setting-out. A 10 mm difference in adhesive or panel thickness shows up at the wall junction.

How a made-to-measure unit moves through procurement

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, serving villa, residential and project customers. Bathroom fixtures sit inside that scope alongside cabinetry, lighting, flooring and wall finishes, which means one supplier coordinates items that would otherwise be bought from several catalogues.

A typical sequence for a specified basin runs as follows:

  • Brief and drawings. You send room dimensions, elevations and the schedule above; we mark up anything missing before quoting.
  • Specification and quotation. Material, finish, machining details and quantities are confirmed in writing, so the price covers exactly what will be machined.
  • Production and inspection. Units are made to the approved file and checked against it before packing.
  • Freight and documents. We arrange sea, air or rail freight with commercial invoices, packing lists and the other import paperwork, delivered to site rather than to a port.
  • Installation support and after-sales. On-site installation, snag inspection, spare parts and maintenance support follow handover.

Because we arrange the freight leg, buyers should still confirm duties, Incoterms and delivery terms for their own country on each order; import costs and local compliance are not quoted as fixed assumptions.

Common specification mistakes and how to avoid them

Specifying the photograph instead of the dimensions

A reference image tells the factory the style you want, but says nothing about bowl offset or edge thickness. Attach a dimensioned elevation for each bathroom type.

Leaving tap holes to the installer

Machining after delivery risks chipping and compromises the finish. select the tapware before the unit is cut, and record hole spacing on the drawing.

Matching colour from a screen

Grain and veining vary between blocks. For stone and marble finishes, approve a physical sample or slab reference, then order every unit for the project against that same reference.

Ignoring the waste route until first fix

Where the trap has to fall determines both the cut-out and the cabinetry below. Give the plumber the counter section drawing before first fix, not at installation.

Releasing rooms one at a time

Identical bathrooms should be released as one batch against one machining file, so dimensions and finishes stay consistent across floors.

Before you send the enquiry: a short checklist

  • Dimensioned plan and elevation for each bathroom type, with datums stated
  • Bowl centre lines, bowl count, and overflow requirement
  • Material family plus approved colour or slab reference
  • Tapware selected, with hole count and spacing
  • Trap type, waste position and finished floor level
  • Support method and inspection access
  • Quantities by room type, plus spares if required
  • Delivery location and who handles import clearance

Can an integrated basin be supplied to non-standard sizes?

Yes. Made-to-measure sizing, material and finish options and a layout tailored to the project are how these units are produced; the dimensions simply need to be fixed before machining.

Are the counter and basin delivered as one item?

The unit is one piece, so it ships as one item. Where a vanity carcass, mirror cabinet or Vanity Lighting is ordered alongside it, the items are coordinated in production and consolidated for shipping.

What if a unit arrives damaged?

Report it with photographs on arrival. Replacement parts and re-manufacture are handled through our after-sales process, so keep the packing note together with the room schedule.

Send your room drawings, quantities and finish references to our project team, and we will return a quotation against the exact specification. For the wider bathroom range, browse Sanitary Fixtures / Bathrooms or the full Interior Fixtures catalogue.