A custom outdoor swim spa is not a catalogue item you simply order by model number. Before production starts on Outdoor Swim Spa WS-PC08U, the buyer and the factory need to agree on a written configuration sheet covering shell dimensions, equipment set, utilities and site preparation. The points below are what we ask project buyers, villa owners and contractors to confirm first, so the unit that leaves the factory matches the space it has to fit into.

1. Confirm the shell size against the real site condition

The catalogue lists WS-PC08U at 8000 × 3000 × 1500 mm (length × width × depth). That figure is the shell envelope, and it does not automatically include steps, handrails, plant space or the working clearance a technician needs for later servicing. Before we schedule production, please send us:

  • A dimensioned drawing of the terrace, deck, podium or garden area where the unit will sit, including parapets, columns and drainage gullies.
  • The support structure: whether the spa sits on a reinforced slab, a steel frame, or a timber deck with additional bearing members.
  • The access route from the delivery vehicle to the final position, including gate widths, lift capacities and any crane or hoist requirement for an elevated terrace.

Where the site cannot accept the standard footprint, we produce the spa to a customised shape and size. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved layouts with an acrylic shell and structural reinforcement, so an awkward courtyard or an irregular pool deck is a design question rather than a dead end.

2. Confirm the equipment set, not just the model code

Model codes group a family of configurations. The product page for WS-PC08U shows water jets, LED lighting and ozone, together with one control system, four water pumps, one filter pump, 33 jets in total, one LED light and a total power figure of 11.85 kW. Treat those numbers as the reference configuration for this model: what is actually fitted is decided by your signed order sheet, and equipment varies between variants in the same series.

ModelWS-PC08U
Catalogue shell dimensions8000 × 3000 × 1500 mm
Control system1 set
Water pump / filter pump4 pcs / 1 pc
Jet total33 pcs
LED lights1
Total power (reference)11.85 kW
Features shown on the product pageWater jets, LED lighting, Ozone

Please confirm the final equipment list and electrical requirements for your order before production begins.

3. Confirm which options are in scope

Catalogue-listed options for this series include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both the price and the site requirement, so decide them at quotation stage rather than during production:

  • Heat pump. Determines whether the spa is usable outside the warm season, and adds an electrical load plus a location for the unit itself.
  • Insulation. Worth specifying where the site runs cool most of the year or where running cost forms part of the owner's business case.
  • Filtration choice. Standard cartridge filtration against sand filtration changes the plant room space and the maintenance routine handed to the operator.
  • Steps and access. Internal steps, external steps or a beach entry each affect water depth and the deck detail around the rim.
  • Swim training system. Not listed for WS-PC08U on the product page. If a counter-current swim unit is required, we confirm availability on this shell or move to a variant of the range that carries it.

4. Confirm the utilities before the shell arrives

The most expensive rework happens when the spa arrives and the power, water and drainage are not ready. Please have your services engineer confirm:

  • Supply capacity. The reference total power for this configuration is 11.85 kW; your electrician should size the dedicated circuit, protection device and cable run against the confirmed final equipment list, in accordance with local wiring rules.
  • Water feed and, where specified, drainage, including the location of the fill point, overflow and any pump-out provision.
  • Control system placement, keeping the controller accessible for the operator while protected from weather and splash.
  • Water treatment plan, whether ozone is included in your configuration and what dosing the owner will run day to day.

5. Confirm finishes, lighting and how the spa sits in the wider project

A swim spa in a villa or resort project is rarely an isolated purchase. Cladding colour, coping detail and lighting temperature should be agreed with the same drawings used for the surrounding paving, pool and spa products, and poolside furniture, so the water feature reads as part of the design rather than an afterthought. Where a project needs more than exercise and hydrotherapy, compare this configuration with other shells in the outdoor swim spa range before you lock the specification.

6. Confirm the commercial and delivery terms in writing

Before production is released, we ask buyers to sign off on: the equipment sheet and any options; the finish schedule; the packing list and container loading plan; the agreed Incoterms and destination port or site address; and the sequence for installation support. Our Turnkey Solutions cover design coordination, production, logistics and after-handover support, which is how swim spas are usually handled together with cabinetry, outdoor furniture, lighting and other fit-out items on the same project.

A short pre-production checklist

  • Site drawing with final spa position, access route and support structure approved
  • Equipment sheet signed: pumps, jets, control, lighting, ozone, and any options
  • Electrical load confirmed against the signed equipment list and local wiring rules
  • Water supply, drainage and controller location fixed on site
  • Finish schedule and coping detail matched to the surrounding paving
  • Packing, freight terms and delivery address agreed in writing

Send us your site drawing and target configuration, and we will return a marked-up specification for WS-PC08U showing exactly what is included, what is optional and what your site team needs to prepare. That single document is what protects the production slot, the delivery date and the finished installation.