A rendering of a bedroom with floor-to-ceiling oak doors is a good starting point, but it is not enough for a manufacturer to quote. To move from a picture to a firm price and a production slot for Natural Oak Veneer Wardrobes, the brief has to carry dimensions, layout, material decisions and project conditions. The checklist below is the same information our own production team works from when a wardrobe enquiry arrives.

Why the Brief Changes Everything for Built-in Wardrobes

Wardrobes in this category are made-to-measure, not catalogue units. The product page for our built-in furniture range describes finish, layout and dimensions as project-specific choices, which means the quotation follows directly from what you send us. A brief that states only "oak wardrobe, 3 metres wide" leaves open the carcass build, the door type, the internal split and how the unit meets an uneven floor or a ceiling with services running through it.

That gap is where cost overruns appear. When dimensions are confirmed after cabinetry has entered production, panels have to be re-cut and the whole set waits. A complete brief at enquiry stage keeps the schedule intact and lets us tell you early if a detail needs a different solution.

Information We Need Before Pricing

Send what you already have; partial information is fine for a first pass. The items below are what we work through together, room by room.

Item in the briefWhy it matters to production
Room drawings or measured survey, including overall width, height and depthSets panel sizes and tells us whether the unit runs floor-to-ceiling or stops below a cornice
Obstructions: skirting, architraves, radiators, downlights, air-conditioning lines, switch platesDecides scribing, cut-outs and whether a filler panel is needed
Door type and opening direction: hinged, sliding, or an open layoutDetermines hardware, clearance in front of the unit and the door construction
Internal zoning: hanging rails, drawers, shelves, trouser rack, lightingDrives the carcass grid and the number of drawer units per bay
Veneer specification: cut, grain pattern and surface finishAffects panel matching, grain direction across doors and finishing time
Quantity and room schedule (how many wardrobes, in which rooms or units)Allows panels to be nested and finished in one batch, which stabilises both price and lead consistency
Destination, delivery address and site accessInfluences packing, panel size limits and container loading plan
Programme dates: drawing approval, production start, required on-site dateFixes the production slot and the sequence with other fit-out trades

Deciding the Veneer Before You Send the Enquiry

Oak is not one appearance. Within our wood veneer wardrobe collection, the same board construction can read very differently depending on how the veneer is cut and laid up. Quarter-cut and rift-cut sheets give straight, even lines that suit minimal bedrooms; crown-cut sheets show the broader figure and cathedral pattern people expect from traditional oak. Book-matched and slip-matched sequences change how continuous the grain looks across a run of doors.

Two practical points to settle in writing before production starts:

  • Grain direction on the doors, vertical or horizontal, and whether the sequence must match across adjacent units. State it on the elevation drawing rather than in an email sentence.
  • The surface treatment you are judging by. Colour and sheen on a veneer sample under workshop light will not match the same panel lit by bedroom downlights, so review samples in the destination room's lighting where possible.

If oak is not confirmed yet, ask for the wider comparison. The collection also covers Walnut Veneer Wardrobes, smoked and two-tone veneered layouts, and matte or high-gloss finishes, so a single enquiry can price several options and let you compare on cost as well as appearance.

Layout Details That Belong in the Drawings

Internal zoning is where day-to-day usability is won or lost. We build to your storage habits rather than a standard grid: hanging areas split between long garments and shirts, drawer zones at comfortable height, shelf spacing set by what is actually stored, and open display niches where you want them. If you work from the same plan for several bedrooms or apartments, tell us which rooms repeat and which differ; repeated bays are cheaper to produce and easier to keep consistent on site.

For a clean, handleless look, mention it at enquiry stage. Handleless fronts need a profile decision at the door edge and affect how doors clear each other on a corner run. Our custom minimalist bedroom wardrobe work follows the same route: flat panels, custom sizes, internal layouts and door styles specified per project.

How Our Custom and OEM Process Runs

The path from enquiry to delivered cabinetry follows the stages set out on our custom and OEM service page. You send the brief; we review it with you, prepare shop drawings for sign-off, then start production once the drawings and finishes are approved.

  • Brief and consultation. Drawings, photographs of the space and the room schedule go to our project team. We flag anything that conflicts with a made-to-measure build.
  • Design and specification. Elevations with dimensions, door elevations, internal layouts and the selected veneer and finish. This is the document your approval locks in.
  • Quotation and detail confirmation. Priced against the approved drawings, so later changes are visible as variations rather than surprises.
  • Production and quality control. Panels cut, veneered and finished to the signed specification, with inspection before packing.
  • Packing and delivery. Panels packed for transit and loaded to a plan that matches your site sequence; freight arrangements are set out on our logistics page.
  • Installation and after-sales. On-site guidance, inspection of snags and support afterwards as described under installation and after-sales services.

One habit saves weeks on multi-unit jobs: approve one wardrobe set first as the reference. Everything downstream — grain matching, door alignment, drawer heights, finish sheen — is then agreed against a real unit instead of a sample board, and the remaining sets follow an approved standard.

Questions to Answer in Your First Email

  • How many wardrobes, and are they identical or room-specific?
  • Is the unit built into a wall cavity, against a finished wall, or between floors as floor-to-ceiling joinery?
  • What sits above and beside it — cornice, ceiling services, an adjoining door opening?
  • Floor finish and level: tiled, timber, carpet; is the floor known to be out of level?
  • Any existing units to match or replace, and can you send photographs of them?
  • Do the wardrobes form part of a larger package with kitchen cabinetry, doors or wall panelling from the same project?

The last question matters more than most buyers expect. When wardrobes, wood veneer panelling and internal doors are ordered together, the veneer sheets can be selected from one batch, so grain tone and finish sit consistently through the room instead of being matched after the fact.

Sending the Enquiry

Send drawings, a room schedule and your finish preference to the contact details on our contact page. If you have only sketches at this stage, send those — we will convert them into shop drawings for your approval before anything enters production. As a China-based manufacturer of furniture and building materials working on villa, hotel and apartment projects, we handle the full scope from specification through delivery and installation support, so one enquiry can cover the wardrobes and the joinery around them.

Start your wardrobe enquiry

Share your drawings, quantities and finish preference, and our project team will come back with shop drawings and a quotation against them — including veneer options across the oak, walnut and smoked veneer collections.