Integrated door and paneling work looks effortless on site: one continuous wall surface, a concealed opening, no visible frame break. It is also one of the easiest scopes to mis-specify in a fit-out package, because the door leaf, the panels, the reveal lines and the wall build-up all have to agree before anything is cut. If you are pricing this scope for a villa, apartment or hotel room floor, the quality of your enquiry determines how quickly and how accurately we can quote it.

What an integrated door & paneling package actually covers

Our Integrated Door & Paneling range sits inside the Custom Partitions & Paneling collection. Each item is made to measure, with material and finish selected for the project and a layout drawn around the actual room. The same collection also covers Wall Panel Systems, Wood Panel Partitions and Custom Niche Paneling, so the door leaf, the surrounding panelling and any niche or reveal can be ordered as one coordinated set rather than three separate purchases from three different suppliers.

In practice a package usually contains: the panelling substrate and finish; the door leaf built to match that finish; concealed hardware (hinges, pivot or sliding gear, magnetic latch); a handleless or push-open solution where the design calls for it; trims and profiles at the transitions; and opening frames or blocking detail agreed with the wall builder. Where we also supply the adjacent joinery — wardrobes, vanities, media walls — the panel module can be carried across those items so the joint lines line up.

Information to send before we can price it

A quote request that contains the six items below usually comes back with a firm price and a fabrication proposal. One that only says "concealed door on a full-height wall" comes back with questions.

ItemWhat to provideWhy it changes the price
DrawingsCAD or PDF elevations of every panelled wall, with door positions marked and dimensions in millimetresPanelling is fabricated to the opening grid; a sketch without dimensions cannot be turned into a cutting list
Wall build-upStud type, lining material, total wall thickness, floor-to-floor height, ceiling detailDetermines frame depth, hinge choice and whether the leaf can sit flush with the finished surface
Door type and swingHinged, sliding, pocket or folding; left or right hand; opening width and clear heightConcealed sliding and pocket gear costs more than concealed hinged hardware and needs different framing
Finish and substrateVeneer, lacquer, melamine, laminate or stone-look surface; matte or gloss; grain direction and matching sequenceGrain-matched veneer panels in a continuous sequence cost more than random-match laminate
Quantities by typeNumber of walls per room type, number of doors per type, and the repeat pattern across floors or room numbersRepeating one detail across many rooms lets us fabricate in batches instead of one-off
Site conditionsProject location, delivery address, storey access and the target installation windowAffects packing, freight mode and how our installers work alongside your crew

The enquiry process, step by step

1. Send the brief to us

Email the drawings and the six data points above, or send them through the contact page. Tell us whether you want only the panelling and doors quoted, or also the joinery around them. As a one-stop furniture and building materials supplier, we can price the surrounding cabinetry, wall finishes and doors from one bill of quantities, which is where most of the coordination saving sits.

2. We review the drawings and come back with questions

Our technical team checks door heights against panel modules, hardware clearance, transition details at skirting and cornice, and any point where a panel joint would land on a door edge. If a detail is unresolved we will flag it rather than price around it. Where the drawings are still developing, our Interior Design Services team can work on space planning, elevations and 3D renderings so the panel layout is fixed before fabrication.

3. Quotation with a specification sheet

You receive an itemised quotation: panel area by wall, each door type, hardware schedule, trims, packing and freight. Every line states the substrate, finish and dimension we are pricing, so you can see exactly what is included and what is being carried by others.

4. Sample and approval

For veneer, lacquer and textured surfaces we supply finish samples for approval before production. This is the step that prevents disputes later, and it also lets you confirm how the surface behaves against the lighting scheme in the room.

5. Production and inspection

Once the drawings and finishes are signed off, panels and doors go into production with quality control at our factory. Panels for one wall are numbered and packed together so they can be lifted straight to the right room.

6. Delivery and installation

We arrange freight by sea, air or rail with the customs paperwork, and deliver to site under our logistics and door-to-door delivery service. Installation and after-sales support are handled through our installation and after-sales team, including site inspection and snagging with your builder.

A worked example: a bathroom wall in a villa project

Take a guest bathroom where the client wants the entry door to disappear into a panelled wall that also carries a recessed niche and a tall storage cabinet. Sent as three separate trades, this becomes three sets of shop drawings and three joint lines that do not meet. Sent to us as one enquiry with the elevation, the wall thickness and the finish sample reference, it comes back as a coordinated set: matching substrate for door and panels, the niche framed into the same module, and the cabinet doors carrying the same grain sequence.

Send a photograph of the existing condition plus one marked-up elevation. Even a rough sketch with dimensions is enough for us to start a budget-level estimate before the architectural drawings are complete.

Common reasons quotes come back higher than expected

  • Non-standard door heights. A taller concealed leaf needs heavier hardware and a reinforced frame compared with a standard height.
  • Grain-matched veneer across many panels. Panels must be cut from the same log sequence, which raises material usage.
  • Late design changes. Moving a door position after shop drawings are approved means re-cutting whole panel runs, not just one piece.
  • Unspecified wall build-up. If the lining and framing have not been confirmed, we have to allow contingency on frames and fixings.
  • Mixed suppliers for doors and panels. Two makers rarely match colour, joint detail and tolerance exactly; the correction cost lands on site.

A short checklist for your next enquiry

  • Elevations of every panelled wall, dimensioned in millimetres
  • Door schedule: type, size, hand and hardware preference
  • Finish reference or sample request, with the substrate confirmed
  • Quantities by room type and total unit count
  • Project location, delivery address and target installation month
  • Wall contractor and the tolerance they will hand over to us

Send that package and you can compare quotations line by line rather than comparing two different assumptions. If you would like us to review your drawings first, forward them with a note on which scope you want priced — panelling and doors only, or the full fit-out package alongside them.

FAQ

Can you quote from architectural drawings that are not yet final?

Yes. We can give a budget estimate from concept elevations and refine it once the set is issued for construction. The estimate states clearly which items are provisional.

Do you supply the doors only, without the panelling?

We can, but we advise against it when the design intent is a flush, continuous surface. Making the door and panels from one shop drawing keeps the reveal, grain and finish consistent.

Can you handle projects outside China?

Yes. We ship internationally and coordinate delivery to site, and our published project cases include villa work in Sydney and Melbourne and housing projects in Perth and Willoughby. Import terms and freight are quoted per project.

How do you handle a repeated room type across a hotel or apartment block?

We agree one approved prototype detail, then fabricate to that repeat with numbered packing per room. Room-by-room numbering is what keeps installation on schedule when many identical walls go up at once.

If you have drawings ready, send them over and we will return a specification-backed quotation for the panelling, doors and hardware as one package.