A floating vanity looks simple on a mood board and complicated on site. The cabinet appears to hover, the basin sits flush with the counter, and every millimetre has to be decided before anything is cut. That is why the conversation you have with the manufacturer matters more than the catalogue photo. Below is the practical checklist we suggest buyers bring when specifying a Santerson Floating Vanity for a villa, apartment or hospitality bathroom.
Start With the Wall, Not the Cabinet
A wall-hung unit carries its load through the wall, so the first questions are structural: what the substrate is, where the studs or solid core sit, and how the waste and water lines will be rerouted. If you are working with a builder or designer, send them the vanity layout before the tiler arrives, because the fixing points, the trap position and the mirror location all depend on it.
Our interior design service can start from your drawings. We review space layout, produce furniture layouts and 3D renderings, and then coordinate the production details with your team so that what was approved on paper is what arrives in the crate.
Dimension and Layout: Made to Measure Is the Default
The floating vanity range is specified per project rather than ordered off a fixed shelf. Width, height off the finished floor, depth, drawer arrangement and the position of open niches are all set from your dimensions. Tell us:
- The clear wall width, plus where doors, showers and towel rails interrupt it.
- Finished floor level and finished wall face, so heights are measured to the true surface.
- Whether the basin is integrated into the countertop, undermounted, or a vessel sitting above it.
- Storage balance: deep drawers for linen, shallow drawers for daily items, open shelving for towels.
If the bathroom needs two basins, we usually move to the double vanity layout instead of stretching a single unit beyond what the carcass and countertop can carry. For smaller powder rooms, the single vanity configuration keeps the same finish language at a more compact size.
Materials and Finish: Decide Early, Change Once
Carcass, door panel and countertop are chosen separately, and each choice affects price, lead time and how the piece ages in a humid room. Our custom and OEM service covers bespoke finishes and textures, material selection across wood, metals, engineered stone and laminates, plus prototyping before full production.
| Decision | What to confirm with us |
| Carcass and door substrate | Board type and edge treatment suitable for bathroom humidity; drawer runner brand and load rating. |
| Door finish | Matte, gloss or wood-veneer surface; direction of any grain; sample approval before batch production. |
| Countertop and basin | Integrated countertop with basin moulded in, stone top with undermount bowl, or vessel bowl above the counter. Confirm tap hole positions and overflow type. |
| Hardware | Handle or handleless profile; hinge and runner finish to match taps and accessories. |
| Colour matching | Where the vanity must match wardrobes, kitchen cabinetry or wall panelling in the same project, we work from one finish reference across all pieces. |
Mirror, Lighting and the Details Around the Cabinet
A floating vanity is only half of the mirror wall. Decide whether you want a backlit mirror cabinet or a separate vanity lighting fitting, and at what height, because the electrical point has to be in the wall before the tiles go on. Matching items such as mirror cabinets, towel rails and towel warmers can come from the same order, which keeps finishes consistent and reduces the number of suppliers on site.
Ordering, Delivery and Installation
Because each unit is made to your dimensions, the sequence matters: approved drawings, then production and quality control, then packing and freight. Our logistics and door-to-door delivery covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking, with a coordinator assigned to your order.
On arrival, installation and after-sales support covers on-site fitting, inspection and snags, plus spare parts for future maintenance. Ask us in writing which fixing system is specified for your wall type, and share the site photos of the prepared wall before our team sets out.
Before you sign off a quotation, request the shop drawing with the finished-floor dimension, the trap centre, the tap hole layout and the approved finish sample. Those four items settle most disputes that would otherwise appear on site.
Frequently Asked Questions
Can one supplier provide the vanity together with other bathroom items?
Yes. SANTERSON is a China-based furniture and building materials manufacturer supplying ceramics, showers, lighting, cabinetry, flooring and wall finishes for the same project, which shortens coordination between trades.
Can the finish be matched to joinery elsewhere in the property?
Yes. Send the finish reference or an existing sample and we match the vanity doors and panels to wardrobes, media units and panelling produced in the same factory.
What information speeds up a quotation?
Bathroom drawings or a marked-up photo, your preferred width and height, basin type, and the finish direction you are working toward. With those, we can propose a layout and price without several rounds of back and forth.
Send us your bathroom drawings and finish references, and we will return a made-to-measure floating vanity proposal with drawings for your approval.