A clear glass wardrobe front looks finished on a rendering and looks careless the moment the doors sit out of plumb or the interior layout does not match how the room is actually used. The difference is almost never the glass itself. It is whether someone wrote down, before production started, what the unit has to contain, where it has to sit, and who checks each step on site. Below is the installation plan we ask project teams to complete for Clear Glass Wardrobes and the rest of our glass-front built-in range, item by item.
Why a written plan matters more for glass fronts than for solid doors
A solid timber or laminate door forgives a wall that is a few millimetres out of plumb; you scribe the carcass and the gap disappears. A clear glass front does not. Glass shows the shadow line it sits in, so every uneven reveal along a run becomes visible. Glass is also heavier than a panel of the same area, which changes what the hinge side, the frame and the floor fixing have to carry. And because you can see straight through the door, the interior fit-out you designed is on display from the doorway — there is nowhere to hide an awkward shelf height or a hanging rail that clashes with a ceiling light.
Our glass-front wardrobe range covers several build types, and each one needs its own line in the plan rather than a generic note saying "wardrobes as per drawing":
- Clear Glass Wardrobes — fully transparent fronts, best where the interior layout and storage boxes are part of the design.
- Clear Glass Aluminum Frame Wardrobes — glass set into a slim aluminium frame, which changes the edge detail and how the door meets the carcass.
- Frosted Glass Wardrobes — diffused fronts for bedrooms shared with bathrooms or where contents should stay out of sight.
- Ribbed Glass Wardrobes — reeded fronts, where the direction of the rib has to be agreed and drawn, not left to site.
- Glass Sliding Door Wardrobes — a track-and-runner system instead of hinges, which brings its own floor and head-clearance requirements.
Section 1: The survey record
Everything downstream depends on this. A plan that starts from architectural dimensions alone will not survive contact with a finished floor. Ask the site team for, or take yourself:
- Finished floor level at both ends of the run, and at the middle — not just one corner reading.
- Wall plumb and flatness along the full height, noted at 300 mm intervals for long runs.
- Ceiling construction and whether a cornice, shadow gap or floating ceiling sits above the unit.
- Position of skirting, architraves, switches, sockets and thermostat controls that the doors will pass when they open.
- Clearance in front of the opening, measured with the bedroom door and any bed or bench in its final position.
For made-to-measure work this is the point where tolerances get agreed in writing. We build to the dimensions and finish schedule you confirm per project, so the survey sheet and the confirmed drawing should carry the same numbers. If a wall has to be packed out or a floor levelled, say who is doing it and by when.
Section 2: Layout and interior fit-out
Because a clear front shows the inside, the interior schedule belongs in the installation plan, not in a later revision. Work from how the room is used — hanging, folding, drawer storage, luggage, display — and record:
- Hanging zones: single or double hang, and which bays are for long garments.
- Shelf spans and heights, including anything intended for display lighting.
- Drawer banks and whether they sit behind a glass door that must clear the handles when open.
- Open versus closed bays. Mixing a glass run with Minimalist Open Wardrobes or modular units is common in villa bedrooms and needs the transition detail drawn.
- Corner and walk-in configurations, for example Glass Corner Wardrobes or a L Shaped Walk in Wardrobes layout, where access to the deep corner has to be solved before the doors are fixed.
Section 3: Glass, frame and finish specification
Put the agreed options on one page so production, transport and installation are all working from the same list. For each opening record the glass type and tint, the frame profile and colour, the handle or pull detail, the door orientation, and the carcass material and finish. Where a project mixes finishes across bedrooms, give each unit its own reference that matches the room on the drawing.
Confirm dimensions and selected specifications for every project before release to production. Re-issuing one glass front after delivery costs far more than a second survey meeting.
Section 4: Services, lighting and interfaces
Wardrobe interior lighting fails most often because the electrician was never told where the driver sits. The plan should show:
- Power feed location and switch type (door-activated, touch, or wall switch).
- Where the driver and any sensor are mounted, and whether they stay accessible after the carcass is fixed.
- Cable routes through the carcass and which panels need pre-drilled holes.
- Interface with skirting, plaster line, flooring threshold and any adjacent joinery such as vanity tops or bedside panelling.
Section 5: Delivery route and site readiness
Glass fronts and tall carcass panels are limited by the path, not the room. Before the delivery date, confirm the lift or stair width, turning landings, corridor door widths, and whether the unit arrives assembled or flat-packed for on-site assembly. For international projects this is also where the shipping documentation gets checked: our logistics scope covers sea, air and rail freight with customs paperwork and door-to-door delivery, so the receiving party named on the documents has to be someone who can actually take the goods at the loading point.
Add a readiness checklist with dates: floor finished, walls painted or at final fill, site clean, power live, storage area dry and secure. Built-in wardrobes should go in after wet trades and flooring are complete; if they must go in earlier, record the protection method.
Section 6: Installation sequence
| Stage | What is checked at this stage |
|---|---|
| Setting out | Unit reference against room on drawing; floor level and packers confirmed; reveal widths agreed. |
| Carcass fixing | Plumb, line and level along the whole run; fixing method to the wall build-up; adjacent units aligned before any doors hang. |
| Interior fit-out | Rails, shelves and drawer banks set to the confirmed heights; lighting drivers fitted and tested. |
| Glass fronts | Hinges or sliding runners adjusted for even reveals; handles on the agreed side; no binding along the run. |
| Handover | Snag list signed off, spares and adjustment keys handed to the facilities contact, care instructions issued. |
Section 7: Handover documents
Close the job with a short pack rather than a verbal walkthrough: the as-built layout drawing, the finish and glass schedule per unit, the lighting wiring note, the snag sign-off, and the contact for spare parts and adjustment. For an owner or facilities team that inherits the building later, this pack is what makes a hinge adjustment a five-minute call instead of a replacement order.
Common gaps we see in incomplete plans
- Glass type chosen on the mood board but never re-confirmed against the door system and its weight.
- Interior layout drawn for one bedroom and repeated across others without checking ceiling height or floor level.
- No allowance for skirting or architrave, so the carcass sits off the wall and the reveal opens up.
- Lighting specified with no driver location, discovered when the carcass is already fixed.
- Delivery booked before the site team confirms the path, resulting in panels that cannot reach the room.
How we support this from design through installation
As part of our Turnkey Interior Project Solutions, wardrobe work runs through the same workflow as the rest of the fit-out: brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. That covers space planning and 3D visualisation, custom and OEM manufacturing to project dimensions and finishes, door-to-door logistics, and Furniture Installation for Interior Projects with inspection and snagging on site. Because the same team handles drawings, production coordination and site guidance, a change to one wardrobe bay is traced through the drawing set before it reaches the factory floor.
Should clear glass fronts be used in a bedroom that opens off a bathroom?
Clear glass will show everything behind it, including towels and laundry. In that layout most clients specify frosted or ribbed fronts for the bays nearest the bathroom and keep clear glass for display bays.
When should the wardrobe survey happen on a new build?
After the floor is laid and the wall finish is at its final stage, so the recorded levels are the ones the unit will actually sit on. If the schedule forces an earlier survey, plan for packing and make-up allowances and record them on the drawing.
Can wardrobe fronts be matched to kitchen and door joinery on the same project?
Yes. Frame profiles, carcass boards and finishes are specified per project, so a glass-front run can pick up the same timber tone or lacquer used in Built-in Furniture elsewhere in the property.
If you have drawings for a bedroom or villa project, send them over with the room schedule and we will come back with a wardrobe layout, a glass and finish schedule, and an installation sequence you can issue to the site team.