A minimalist open wardrobe looks simple on a mood board and complicated on a purchase order. There are no doors to specify, but there is nowhere to hide an uneven carcass, a mismatched shelf depth or a hanging rail set at the wrong height. If your brief only says "open wardrobe, white, made to measure", expect three different quotations from three different factories and none of them comparable. The sections below set out what to write down before you request a price, so the wardrobes that arrive on site match the drawings you approved.
Why open wardrobes are specified differently from closed ones
With a hinged or sliding door wardrobe, the door carries most of the visual weight and hides the interior. An open wardrobe puts the carcass, shelves, hanging rail and back panel on display, so every dimension, edge and finish becomes part of the appearance. That changes what a procurement brief has to cover:
- Carcass material, thickness and edge treatment are visible from the room, not concealed behind a door.
- Shelf spans and hanging-rail lengths have to be stated, because long unsupported spans sag and thin panels bow.
- The interior and exterior finishes usually need to match, since both are seen at once.
- Fixings, wall brackets and the fixing method to the substrate become design decisions rather than installer choices.
For this reason we treat minimalist open wardrobes as built-in joinery rather than loose furniture, and we ask for the same documentation we would request for a fitted wardrobe run.
What the brief should state before you request a quotation
A short list of confirmed items is worth more than a long specification written in general terms. Before an enquiry goes out, we ask project teams to confirm the following.
1. Room-by-room dimensions and constraints
Give overall width, height and depth for each wardrobe run, plus clear dimensions where the unit sits in a recess or between fixed elements. Note floor finish build-up, skirting details, ceiling level, and the position of switches, sockets, extract grilles and sprinkler heads that fall within the wardrobe zone. Open wardrobes are frequently made to measure against finished room conditions, so state whether the dimensions refer to the space before or after floor and ceiling finishes are complete.
2. Layout and internal division
Show where long hanging, short hanging, shelves, drawers and open display niches fall. Drawings should mark shelf heights and hanging-rail heights rather than leaving them to be decided on site. If the same layout repeats across several bedrooms or units, say so explicitly; repeating a confirmed layout across rooms is the simplest way to hold price and finish consistent.
3. Materials, finishes and edges
State the board material you want for carcass, shelves and back panel, the surface finish, and whether edges are to be finished on all visible faces. Our open wardrobe range is offered with made-to-measure sizing and material and finish options, so a named colour or woodgrain reference in the brief avoids the round trip that happens when a factory interprets "light oak" on its own. If you have a finish already specified elsewhere in the project, such as wood tone open wardrobes that need to match bedroom joinery or wall panelling, provide the reference and let us confirm availability before you lock the schedule.
4. Fixing method and substrate
Tell us what the wardrobes fix to: masonry, stud partition, tiled wall or a finished plaster surface. Wall mounted open wardrobes need a substrate that can carry the load and a stated fixing line; on partitions this usually means pre-specified noggins or a floor-supported frame. Confirming this at enquiry stage prevents a site problem that is expensive to solve after the panels have shipped.
5. Quantities, unit mix and phasing
List quantities per room type, not just a total. Note whether units are identical or mirrored, which rooms are samples for approval, and how deliveries are phased against the site programme. A confirmed sample unit before batch production is the standard route on residential projects where finish consistency across rooms matters.
Reading the quotations side by side
Once you have two or three offers, compare them line by line against the brief rather than on the headline number. The differences that matter are usually in what is excluded.
| Item to check | Why it changes the outcome |
|---|---|
| Panel thickness and edge banding | Thin carcass panels and unfinished edges are the most common downgrade on open units, where everything is visible. |
| Shelf span support | Check whether mid supports or reinforced shelves are included for the spans on your drawings. |
| Hanging rail specification and length | Rail diameter, material and clear length determine whether garments hang clear of the side panels. |
| Back panel thickness and fixing | A thin back panel fixed at visible joints looks uneven on an open unit. |
| Scope of supply versus installation | Confirm whether the price covers delivery, installation and snagging, or supply only to the site entrance. |
| Measurement responsibility | Establish who takes final site dimensions and when, before panels are cut. |
How a made-to-measure supplier fits the process
SANTERSON manufactures built-in furniture including open wardrobe collections for residential and villa projects, with sizing, layout, material and finish specified per project. Our workflow follows the stages we publish on the site: design consultation and space planning, product specification and quotation, production with quality control, then logistics and door-to-door delivery, installation and after-sales support. For enquiries that cover more than wardrobes - cabinetry, wall panelling, doors, lighting or flooring in the same package - the same drawings can be coordinated across categories, which reduces the number of separate trades on site.
If your project also needs a design package before procurement is possible, our interior design services cover layout planning, furniture layouts and 3D renderings, with drawings coordinated into production. Send the room dimensions, a marked-up layout and your finish reference and we will confirm what can be made to measure, at what specification, for your programme.
For wardrobe schedules, finish availability and made-to-measure quotations for your project, contact SANTERSON with your drawings and quantities and we will return a specification-based offer rather than a generic price per linear metre.