A swim spa usually arrives on a project schedule only after the buyer has answered three questions nobody else can answer for them: how much space is actually available, what the unit will be used for, and what services have to reach it. The specifications published for Outdoor Swim Spa WS-PC04CH give you a starting point, but the model is part of a configurable outdoor swim and hydrotherapy range, so the final configuration depends on inputs you supply. This article lists those inputs in the order a manufacturer needs them.

Start with the footprint, then check access

The catalog dimensions for WS-PC04CH are 4500 mm long by 3000 mm wide by 900 mm deep. Treat that as the shell size, not the finished installation envelope. Before you commit to a location, record:

  • The clear rectangular opening on site — length and width measured in millimetres, plus the level difference across the area if the slab is not flat.
  • Whether the 900 mm depth is a full recess into a deck or terrace, or a raised installation where the shell sits above the surrounding surface. A raised build changes how people enter and exit.
  • The path from the delivery vehicle to the final position: gate widths, turning radius, overhead obstruction such as pergola beams or tree canopy, and whether a crane or just a crew is realistic.
  • Distance from the spa to the nearest power supply, drainage point and plant or equipment room. Long cable runs become cost and coordination items later.

Send those measurements as drawings or annotated photographs rather than a single number in an email. A manufacturer working on villa and hospitality projects can check the shell against your site condition far faster from a marked-up plan.

State how the spa will be used

The same 4500 × 3000 mm shell serves very different programmes, and the equipment you choose follows the programme. The site lists WS-PC04CH with water jets, LED lighting and ozone as the features shown, together with one control system, one water pump, one filter pump, a jet total of 46 pcs, one LED light and a total power figure of 2.45 kW. Compare that with the adjacent model in the range, WS-PC05CH at 5000 × 3000 × 900 mm with 30 jets and the same 2.45 kW total power: jet count and shell length move independently, so do not assume more jets means a bigger unit or more electrical load.

Tell us which of these describes the project:

  • Daily hydrotherapy for residents — jet layout and seating position matter more than lighting effects.
  • Guest use in a hotel, resort or villa rental — durability of finishes, cleaning routine and lighting atmosphere lead the discussion.
  • Low-frequency leisure use on a private terrace — basic filtration and heating may be enough without additional options.

The catalog also notes that a swim training system is not listed for this model. If lap swimming or resistance training is part of the brief, say so at the start; we will point you to a configuration in the Swimming Pools and Swim Spas range that carries that equipment instead of adapting this one.

Confirm the options you want on the quotation

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line has to be confirmed against the selected configuration rather than assumed from a brochure. For each option, note on your enquiry:

  • Heat pump — whether you want year-round water temperature and what target temperature the client expects.
  • Insulation — relevant in cooler climates or where the spa runs daily; it changes both running cost and the build-up around the shell.
  • Filtration — cartridge arrangement as standard or sand filtration, and who performs routine servicing on site.
  • Steps — whether access is from the deck edge, a corner, or a built-in stair in the surrounding terrace.
Specification shown in catalogValue for WS-PC04CH
Catalog dimensions4500 × 3000 × 900 mm
Control system1 set
Water pump / filter pump1 pc each
Jet total46 pcs
LED lights1 pc
Total power2.45 kW
Swim training systemNot listed

Included equipment and electrical requirements depend on the configuration you select. Please confirm both with us before ordering, together with the local supply voltage and the circuit protection your electrician will provide.

What else to send with the enquiry

SANTERSON supplies furniture and building materials for villa, hospitality and office projects, so a swim spa is rarely the only item on the order. Sending these details in one pass keeps the quotation and the delivery plan aligned:

  • Project location and the stage of construction — new build, renovation, or an existing terrace being upgraded.
  • Surrounding finishes you intend to combine with the spa, such as decking, stone coping or wall cladding, so the shell edge detail matches.
  • Whether you also need outdoor furniture for villas and resorts on the same delivery — loungers, side tables and a pergola or shade structure usually follow the spa decision.
  • Your preferred delivery terms and destination port or site address, so freight by sea, air or rail can be quoted alongside the unit.

If the outdoor area is being designed from scratch, our interior design services cover space planning and layout for indoor and outdoor furnishing as one package, which avoids the spa being sized last.

A short checklist before you send it

  • Site measurements in millimetres, with a plan or annotated photographs.
  • Intended use: residents, guests, or occasional leisure.
  • Options required — heat pump, insulation, sand filtration, steps, UV sterilization.
  • Electrical supply details and who is responsible for the connection.
  • Delivery location, project stage, and any other items to be shipped together.

Send those five items with your enquiry about Outdoor Swim Spa WS-PC04CH and you will receive a configuration sheet, an itemised quotation and a realistic delivery plan rather than a generic price. Contact SANTERSON to start that review.