A swim spa for a hotel, resort, gym or residential tower rarely fails at the equipment list. It fails in the gaps between quotations: an assumption about power, a missing drainage detail, a pump that arrives without the control system it was priced against. If your procurement file includes the Outdoor Swim Spa WS-PC01, the following checks turn a good-looking proposal into one you can actually build to.
1. Confirm the model and shell size against the site plan
The catalogue entry for WS-PC01 lists dimensions of 3000 × 1050 mm. Treat that as a starting figure to verify on your own drawings, not as the whole story. Ask the supplier to state, in writing, whether the number is the outer shell, the water envelope or a footprint including steps and plant access, and who is responsible for the clearance around the unit.
A commercial installation needs more than the vessel: an equipment room or accessible plant zone, a pump and filter location, service access for the filter pump and jet lines, plus circulation and egress around the deck. Compare the stated dimension with your structural grid and with local accessibility requirements before you sign off the layout.
2. Read the equipment schedule line by line
The published specification for this model shows one control system, two water pumps, one filter pump, 53 jets in total and one LED light. Those figures are useful as a reference point, but a proposal should repeat them explicitly and confirm what is included in the price you are being quoted. Check specifically:
- which control system is supplied, and whether spare controls or a replacement module are priced separately;
- the number and duty of water pumps and the filter pump, and whether the jet count in the proposal matches the model you selected;
- what lighting is included, where it is located and how it is sealed for a wet environment;
- whether any swim training system is offered at all — this item is not listed for the catalogue configuration of WS-PC01, so if your brief requires lap swimming, ask what configuration or alternative model covers it.
3. Check the power and electrical assumptions
The catalogue shows a total power figure of 6.65 kW for this configuration. Do not accept that number in isolation. Ask the supplier to state the supply voltage, phase and frequency it assumes, the recommended protective device and cable sizing, and whether the figure covers optional equipment such as a heat pump once selected. Your electrical engineer then confirms the board capacity, the dedicated circuit and local wiring rules for a wet location. A proposal that quotes kilowatts without stating the supply assumption will produce a change order later.
4. Separate standard features from options
Water jets, LED lighting and ozone are shown as features for this model. The wider catalogue also lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options, with availability and compatibility varying by model. Every option you intend to use should appear as its own priced line with a model reference, so that a substitution at delivery is visible rather than buried in a total.
For commercial duty this matters twice over: heat pump and insulation choices drive running cost, while filtration and sterilisation choices drive the maintenance regime your facilities team will follow. Ask for the recommended service interval for each item you accept.
5. Test the supplier's coordination capability
A swim spa is one element inside a wider wet-area package: wall finishes, flooring, ceilings, lighting, sanitary fixtures and cabinetry all meet at the same deck. A supplier who can handle that package reduces interface risk. Before awarding, ask for evidence of the following services, which we list on our own Turnkey Interior Project Solutions pages:
- design consultation and space planning, with drawings and production coordination rather than a product brochure;
- Custom Furniture Manufacturer capability for bespoke finishes and millwork around the pool deck;
- freight and customs documentation, with Furniture Logistics and Door-to-door Delivery arranged to your Incoterms;
- a defined Furniture Installation and After-sales Support process covering inspection, snags, spare parts and maintenance guidance.
Ask how the supplier sequences delivery of a vessel this size against site readiness. A spa delivered before the slab, drainage and power are complete sits in storage and attracts damage claims.
6. Compare within the swim spa range, not across categories
If the WS-PC01 configuration does not match your span, jet count or duty profile, move within the range instead of changing supplier. The Swimming Pools and Swim Spas category lists related models with different dimensions and equipment sets, so you can compare like for like: jet total, pump count, control system and options, all against the same site conditions.
A practical comparison sheet has four columns — specification item, catalogue figure, proposed figure, and confirmation required. Any line where the two figures differ becomes a written question before award.
7. Put the commercial terms in writing
- Incoterms, packing method and container loading plan for an oversized vessel;
- what is inspected at the factory before shipment, and whether you or your clerk of works may attend;
- spare-parts availability for pumps, jets, controls and lighting;
- the scope of warranty coverage and the exclusions that apply to commercial, high-hours use;
- who provides on-site commissioning and handover documentation.
Checklist before award: dimensions confirmed against site drawings; equipment schedule matched line by line to the selected configuration; electrical supply assumptions stated and signed off by your engineer; every option priced as a separate line with a model reference; freight, installation and after-sales scope written into the contract.
SANTERSON has operated since 2008 as a China-based furniture and building materials manufacturer, supplying swim spas alongside outdoor furniture, sanitary fixtures, lighting, cabinetry and interior finishes for villa, hospitality and office projects. Send us the site plan, the duty profile and the specification you are comparing, and we will confirm the configuration, options and delivery scope in writing before you commit.
Product figures quoted above are transcribed from the catalogue entry for WS-PC01. Included equipment, electrical requirements and optional accessories vary by configuration; confirm the selected configuration with us before ordering.