A paneled hinged wardrobe looks simple on a drawing: framed stiles and rails around a centre panel, hinges down one side. The variation appears when someone has to build it to a real room, a real ceiling line and a real budget. If you are specifying these wardrobes for a villa, an apartment block or a set of guest rooms, the conversation you have with the manufacturer decides whether the doors line up on site. Below is the list of items we ask buyers to settle before an order goes into production.

1. Size, and how the unit meets floor and ceiling

Our Paneled Hinged Wardrobes are made to measure, so the figures we need are more than the width and height of an opening. Tell us:

  • The finished floor level — is the screed or flooring already laid, or will it change after delivery?
  • Ceiling condition: flat slab, suspended ceiling, cornice, or skirting that has to be scribed around.
  • Whether the unit should run floor-to-ceiling with a top panel, or stop below the ceiling line.
  • Out-of-plumb walls. Older villas and renovated buildings rarely give you two parallel walls, and we build the carcass to the survey rather than to the drawing.

Send survey dimensions in millimetres, taken at three points along each wall. We confirm the final manufacturing size against those figures before any panel is cut.

2. Panel profile and door construction

"Paneled" covers several different door make-ups. They do not cost the same, and they do not read the same way in a room. The options to choose between:

Door styleHow it reads in the roomWhere buyers usually put it
Raised panelCentre panel sits proud of the frame and catches shadow linesTraditional and classic villa bedrooms
Recessed panelCentre panel set back from the frame faceCoastal, farmhouse and transitional schemes
Shaker-style centreNarrow frame with a plain flat centreTransitional rooms that need a quieter look
Moulded decorative panelProfile routed into the panel itselfHotel rooms and feature bedrooms

Once the profile is fixed, we can repeat the same door language across related items in one project — Raised Panel Wardrobes, Recessed Panel Wardrobes and the matching Shaker Panel Wardrobe — so bedroom, dressing room and any other built-in storage read as one set instead of three separate purchases.

3. Material and finish

Material choice drives both price and how a door behaves after years of daily use. Settle these with us:

  • Substrate — what the frame is made from, and what the centre panel is made from. Solid timber frames move with humidity; we tell you where that matters and where it does not.
  • Surface — painted finish, laminate or wood veneer. Paint colour comes from a physical sample, never from a screen.
  • Sheen — matt and low-sheen surfaces hide fingerprints on doors that get touched constantly; glossier surfaces bounce light around a small room.
  • Edge treatment — how panel edges are profiled and sealed. This is where careless work shows first.

If the building already has a finish you need to match — doors, skirting, an existing floor, or Classic Paneled Solid Wood Wardrobes on site — send a sample or the exact reference. Matching veneer and paint to what is already installed is straightforward before production and expensive afterwards.

4. Hinges, handles and the swing path

This is where projects go wrong most often, because the answer depends on the furniture in front of the wardrobe, not on the wardrobe itself.

  • Hinge type and cup position — concealed or exposed, plus the inset or overlay needed against the carcass side.
  • Door swing path — measure what sits in front: a bed, a nightstand, an opposite wall. A wide door needs clear floor in front of it for its whole arc.
  • Handle or knob — backplate size, projection and finish. Handles add to the swing radius; a push-open fitting removes that allowance.
  • Soft close — worth specifying for guest rooms and family bedrooms.
  • Door count and split — how the run divides into doors. Over-wide single doors sag over time, and we will say where a door should be narrower or paired with another.

5. Interior layout by user, not by catalogue

The inside is specified per household or per room type. Give us the storage requirements and we design around them:

  • Long-hang sections for coats and dresses, versus double short-hang rails.
  • Drawer count and depth — shallow trays for folded items or deep boxes for knitwear.
  • Shelf heights: adjustable rather than fixed, unless there is a reason to fix them.
  • Open display bays inside the run, which guests in hotel rooms actually use.
  • Interior lighting: fitting type, sensor or switch, and where the cable exits the carcass.
  • Named items to store — luggage height, ironing board, safe, hair-dryer shelf. Those dimensions come from you.

6. Consistency across the whole project

A wardrobe rarely stands alone. If the same job also includes Flat Panel Hinged Wardrobes in secondary bedrooms, or Two Tone Hinged Wardrobes where a lighter centre panel is wanted, say so at the start. We then produce from one finish schedule and one material batch, so tones match room to room instead of drifting between separate orders.

Bring floor plans, survey dimensions, finish references and your storage list to the first conversation. That single exchange removes most of the change orders you would otherwise issue later.

7. Delivery, installation and who does what

A built-in wardrobe is only as good as its fit. Our scope runs from Custom & OEM Service based on your drawings, through production and Logistics & Door-to-Door Delivery, to Installation & After-sales Support. Agree these points in writing before production starts:

  • Which party brings walls, floor and ceiling to a true line.
  • Site access, lift dimensions and the delivery window — full-height carcass panels do not turn tight stairwells.
  • Sequence with other trades: flooring, paint, skirting and electrical first, wardrobe last.
  • Packaging and crate labelling by room, so the crew on site knows which panel belongs where.

A specification checklist to send with your enquiry

  • Survey dimensions in millimetres, three points per wall, finished floor level stated
  • Panel profile chosen, with an approved door sample before production
  • Substrate, surface, sheen and colour reference confirmed
  • Hinge type, overlay, handle selection and clear swing path checked against room furniture
  • Interior layout per user: hang heights, drawers, shelves, lighting, named items
  • One finish schedule covering every wardrobe in the project
  • Delivery sequence, site access and trade responsibilities agreed

Send your layout for a line-by-line quotation

SANTERSON has been manufacturing furniture and building materials for project work since 2008, and we build these wardrobes to the dimensions and finish schedule you supply. Send drawings, survey figures and the checklist above, and we will return a specification and quotation you can compare item by item against any other supplier.

Start the specification review through our contact page.