A request for quote for grey shaker cabinets only becomes useful when the manufacturer can price exactly what you intend to build. Because a shaker kitchen is made to measure, the difference between a rough enquiry and a comparable quotation usually comes down to how much of the specification you hand over on day one. The checklist below follows the way SANTERSON works with villa, apartment and hospitality buyers: brief first, detail confirmation second, then production.

Why Grey Shaker Cabinets Are Quoted Per Project

Our Grey Shaker Cabinets sit inside a wider Shaker Kitchen Cabinets collection, and the same door family also covers Dark Tone Shaker Cabinets, White Shaker Cabinets and Two Tone Shaker Cabinets. Each run is produced to the dimensions, layout and finish of one project rather than picked from a stock size range. That is good news for fit-out quality, and it also means an early price can only ever be indicative until the following items are settled.

A buyer who sends these details with the first enquiry normally receives a quotation that can be compared line by line against other suppliers. A buyer who sends a floor plan and the word "grey" receives a guess.

The Eight Items a Complete RFQ Should Contain

1. Drawings or measured layouts, with the critical dimensions marked

Send what you have: architectural kitchen elevations, a designer's layout, or on-site measurements. Mark the runs you need priced, room heights, and the constraints that drive cost — floor-to-ceiling height, bulkheads, chimney or flue positions, window sills, skirting, and any wall out of plumb. If appliance niches exist, give the model numbers or at least the required aperture sizes, because an integrated oven housing is priced differently from a standard tall carcass.

2. The grey you actually want, not just the word "grey"

Grey shaker fronts are specified by finish system and tone, and those two choices move price more than anything else in the door. In the RFQ state the finish family — paint, laminate, acrylic, lacquer or veneer — and give a reference: a RAL or Pantone number, a sample you already hold, or a photo with the tone you are trying to match. Say whether the tone should read cool or warm under your lighting, and whether wall units, base units and tall cabinets are all the same grey or a deliberate two-tone combination.

Ask us to confirm the finish on a physical sample before mass production. Grey pigments look different on a flat panel than on a recessed shaker frame, where the shadow line of the rail and stile changes how dark the tone reads.

3. Door construction and edge detail

Shaker is not one detail. Specify the frame-and-panel build you expect: the width of the rails and stiles, whether the centre panel is flat or raised, the radius on the internal corner, and whether the frame is assembled by traditional jointing or machined from a single piece. These choices affect both cost and how the front behaves over years of kitchen use, so state them in writing rather than attaching a picture and hoping it is understood.

4. Carcass, drawer and interior specification

Most of the visible budget sits in doors; most of the arguments at handover sit inside the boxes. In the RFQ list:

  • Carcass material and board thickness, plus edge banding colour.
  • Hinge and slide brand or grade you expect, and whether soft close is required throughout.
  • Drawer configuration — box drawers, deep pantries, cutlery organisation, pull-out corners or lazy Susan units.
  • Interior finish on visible cabinet interiors, and whether the interior colour matches the exterior.
  • Shelves: fixed, adjustable, glass, or reinforced for heavy worktop spans.

5. Worktops, splashbacks and anything that joins to the cabinetry

State whether you want the worktops included in the quotation or supplied locally. If they are included, give the material, thickness, edge profile, sink cut-out type and whether an integrated draining board is needed. Include splashbacks, trims, scribes, plinths, cornices and light coves; these small items are where a low-looking quote quietly becomes expensive later.

6. Integrated lighting and electrical provisions

If you want under-cabinet or in-cabinet lighting, say so in the RFQ and identify where transformers, switches and cable routes should sit. Lighting built into carcasses during production is tidy; lighting added on site by a local electrician usually is not. Note glass-front units that need internal illumination as well.

7. Quantities, project type and delivery address

A single villa kitchen and a repeat-typology apartment or hospitality job are quoted on different assumptions about packing, staging and coordination. Give the number of bathrooms, kitchens or units, the site address, and your intended programme — when drawings need to be frozen and when the goods must land. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, packaging and container loading, so the delivery address and the Incoterms you want quoted belong in the RFQ rather than in a later email.

8. What you want excluded, and how you want price presented

Ask for a quotation broken down by room or unit type, with packing, freight, insurance and duties shown separately where they apply. State clearly what is not in scope — site preparation, plumbing, electrical connection, local trade labour — so that two suppliers' numbers can be compared honestly.

How to Read the Grey Shaker Cabinet Quotes You Get Back

Once three or four quotations arrive, compare them on a like-for-like basis before looking at the totals. The table below shows what to line up.

Line to compareWhat to check across every quote
Door specificationSame finish system, same rail and stile width, same panel detail. A cheaper total often hides a thinner frame or a different edge radius.
Carcass and hardwareBoard thickness, edge banding, hinge and slide grade, soft-close scope. Hardware grade is the usual place where quotations differ without being obvious.
InclusionsPlinths, scribes, trims, plinth lighting provisions, worktops, splashbacks. Add anything excluded back into the total before ranking.
Packing and deliveryPacked by room or by panel, marked cartons, container count, port of loading, and whether delivery is to site door or to port.
Approval routeWhether a physical finish sample and an assembly drawing are included before production starts.
After supplyWhat happens if a panel arrives damaged, how replacement parts are ordered, and who carries the freight on a replacement.

Two Questions Worth Asking Every Supplier

First: what does the supplier need from you before the quotation becomes fixed? At SANTERSON the cooperation steps are project brief and design proposal, then quotation with detail confirmation, then production and shipment, so we can tell you at the outset which decisions still affect price. Second: who signs off the drawings before cutting starts? Our Interior Design Services include space layout planning, furniture layouts, 3D visual renderings and production coordination with on-site guidance — useful when you are ordering shaker cabinetry for a project abroad and want someone accountable for the drawings rather than passing them straight to a workshop.

If you are supplying grey shaker fronts under your own brand, mention it in the RFQ. Our Custom & OEM Service covers bespoke finishes and textures, prototyping and private labelling, and minimum order quantities are set per project — so tell us the volume you expect rather than assuming a standard applies.

A practical test before you send: read your RFQ back and ask whether a manufacturer in another country could price it without asking a single follow-up question. If the answer, the finish reference, the hardware grade and the delivery address are all present, the quotations that come back will be close enough to compare.

Send Your Enquiry

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with cabinetry produced to project dimensions and finish choices. Send your drawings, your grey reference and your programme through our contact page, and we will come back with a specification-led quotation rather than a headline price.

Finish availability, minimum order quantities, freight terms and after-sales scope are confirmed project by project; figures quoted in writing on your order are the operative terms.