A U shaped corner wardrobe looks finished on a drawing board and looks ordinary on site when the wrong edge band, the wrong door reveal or the wrong hardware has been ordered. Because this layout runs storage along three walls and meets two internal corners, almost every finish decision appears twice: once on each leg of the run, and again where those legs turn. Below is the list of finish details that buyers, contractors and interior consultants should put in writing before production starts.
1. Confirm the corner geometry before you confirm any finish
The three sections of a U Shaped Corner Wardrobe are not interchangeable, and neither is the same layout as an L Shaped Corner Wardrobe. Ask the factory to state which returns belong to each section, and whether the corner carcass is a single angled unit or two boxes butted together. That answer drives everything downstream: door size, hinge type, handle position and how visible the end panels are from the bedroom doorway.
- Overall run lengths on both side walls and the back wall, taken from finished floor and finished wall lines, not structural shells.
- Floor levelness across the whole U. Uneven floors show up as a crooked toe kick long before anyone notices the door colour.
- Whether the top of the run is scribed to the ceiling or capped with a pelmet, and who supplies that filler.
2. Door style changes what "finish" actually means
A Sliding Door Corner Wardrobe and a Hinged Door Corner Wardrobe need different finish approvals even in the same laminate. Sliding doors expose a track, a bottom guide and an overlap between panels; hinged doors expose hinge boring, door reveal and handle clearance against the adjacent return.
- Sliding: track material and colour, panel overlap width, whether the leading edge is rebated or square.
- Hinged: hinge brand and opening angle at the corner carcass, door reveal between doors, and handle projection into the walk-up space.
- Open: Open Corner Wardrobes show every edge to the room, so all four edges of every shelf must be band-finished, not just the front.
- Glass: for a Glass Corner Wardrobe, confirm glass tint, frame profile colour and whether the reverse face of the glass is finished.
3. Surface material and its direction
Our wardrobe range is built to order, so specify the surface rather than accepting a default. Wood grain laminates and veneers are directional materials: if the factory is not told, doors on the left leg may end up graining in the opposite direction to doors on the right leg, which is visible instantly under bedroom lighting.
| Surface option | What to write on the order |
|---|---|
| Melamine | Decor code, gloss level and texture direction. Matte Finish Melamine Wardrobes suit high-use bedrooms; Wood Grain Melamine Wardrobes need a stated grain direction per panel. |
| Wood veneer | Veneer species, cut sequence and whether panels come from the same flitch. Matte Finish Veneer Wardrobes and Walnut Veneer Wardrobes show grain matching most clearly. |
| Lacquer | Colour standard and sheen. Matte Lacquer Wardrobes reveal surface preparation flaws less than a high build gloss. |
| Acrylic | Film colour, edge band source and gloss value. White Acrylic Wardrobes in a three-sided run will show tone drift between batches if panels are not ordered together. |
| Solid wood | Species, paint or stain system and movement allowance for the wider doors. |
Order every panel of the U in one production batch. A second batch matched from a sample card is close; it is rarely identical under the same lamp.
4. Edges, reveals and the corner itself
- Edge band: state the material, colour code and thickness of every visible edge, including end panels that face the room and internal corners where two carcasses meet.
- Corner return: confirm whether the corner is a diagonal carcass, a rounded return or a square butt joint. Each one reads differently once doors are closed.
- Scribe and filler: agree who produces the scribe profile at out-of-plumb walls, and whether it is finished in the door material or left as raw cut stock.
- Toe kick and plinth: recess depth, material and whether it wraps all three sides continuously.
- Lighting cut-outs: if you plan interior lights, confirm pre-cut holes, cable routes and the colour temperature of any strip light before the panels are edged.
5. Hardware, interiors and the numbers that must match
Finish approval is not only cosmetic. Handles, hinges, drawer fronts and internal fittings all sit on the surfaces you have approved, so their specification belongs in the same document.
- Handle style, finish colour and screw centres; or the profile of a handleless rail if you are going flush.
- Hinge make, closing action and the opening angle available at each corner carcass.
- Drawer front thickness relative to the drawer box, and whether internal fronts match external door material.
- Internal layout: hanging heights, shelf spans, and whether the corner is fitted with a pull-out or left as dead volume. Drawer Focused Modular Wardrobes shows how drawer banks are arranged when you plan them along the back leg.
- Anodised or painted metal finishes for frames and rails, matched to the door sample rather than a catalogue swatch.
6. What to send us when you enquire
Because these wardrobes are made to measure, with layout, material and finish specified per project, we can quote accurately as soon as the following details arrive:
- Room drawings or site measurements on finished lines, with ceiling height and floor level notes.
- Preferred door type for each leg of the U, and how the two internal corners should read.
- Surface material, colour or decor reference, gloss level and grain direction.
- Hardware preferences, plus any interior lighting intention.
- Delivery location, access constraints and whether installation support is required on site.
SANTERSON manufactures built-in furniture alongside the rest of the fit-out package, so wardrobe doors, bedroom wardrobes and matching cabinetry can be produced against one finish schedule instead of several. That single-schedule approach is where tone matching, edge consistency and corner detailing stop being arguments on site.
Send your drawings for a made-to-measure check
Share the wall dimensions, door type and surface reference for your U shaped layout, and we will confirm the layout, material options and finish schedule before production. Contact SANTERSON to start the specification.